Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Portland Cement Plants (Renewal), EPA ICR Number 1051.10, OMB Control Number 2060-0025, 4211-4212 [E8-1188]
Download as PDF
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 73, No. 16 / Thursday, January 24, 2008 / Notices
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
are displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: The authority for these
requirements is sections 311 and 312 of
the Emergency Planning and
Community Right-to-Know Act
(EPCRA), 1986 (42 U.S.C. 11011, 11012).
EPCRA Section 311 requires owners and
operators of facilities subject to OSHA
Hazard Communication Standard (HCS)
to submit a list of chemicals or Material
Safety Data Sheets (MSDSs) (for those
chemicals that exceed thresholds,
specified in 40 CFR part 370) to the
State Emergency Response Commission
(SERC), Local Emergency Planning
Committee (LEPC) and the local fire
department (LFD) with jurisdiction over
their facility. This is a one-time
requirement unless a new facility
becomes subject to the regulations or
updating the information by facilities
that are already covered by the
regulations. EPCRA section 312 requires
owners and operators of facilities
subject to OSHA HCS to submit an
inventory form (for those chemicals that
exceed the thresholds, specified in 40
CFR part 370) to the SERC, LEPC, and
LFD with jurisdiction over their facility.
This form is to be submitted on March
1 of each year, on the inventory of
chemicals in the previous calendar year.
Burden Statement: The annual
average burden for MSDS reporting
(basic and additional reporting) is
estimated at 6.75 hours for new
facilities. Additional reporting, which is
to submit revised and new MSDSs for
currently covered and new facilities is
2 hours. The average burden for new
and currently covered facilities to
submit MSDS upon request is 1 hour.
The average burden to comply with Tier
II inventory reporting for small, medium
and large manufacturers is 8, 80 and 120
hours, respectively. The average burden
to comply with Tier II inventory
reporting for small, medium and large
non-manufacturers is 6, 20, and 40
hours, respectively. There are no
recordkeeping requirements for facilities
under EPCRA sections 311 and 312,
although it is assumed that they will
maintain a copy of annual reports to use
for future filings. The recordkeeping for
MSDSs is mandated under OSHA rules.
The average burden for state and local
governments to respond to requests for
MSDSs or Tier II information under 40
VerDate Aug<31>2005
20:35 Jan 23, 2008
Jkt 214001
CFR 370.30 is estimated to be one hour
per request. The average burden for
managing and maintaining the reports
and MSDS files is estimated to be 32.50
hours. The average burden for
maintaining and updating a 312
database is estimated to be 320 hours.
Burden means the total time, effort, or
financial resources expended by persons
to generate, maintain, retain, or disclose
or provide information to or for a
Federal agency. This includes the time
needed to review instructions; develop,
acquire, install, and utilize technology
and systems for the purposes of
collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities: Any
facility owner or operator that is
required to prepare or have a material
safety data sheet (MSDS) for a
hazardous chemical under OSHA
Hazardous Communication Standard
and if the chemical meets the threshold
level specified in 40 CFR part 370. Some
facilities include but are not limited to,
chemical, petroleum, warehouse, food,
paper mills, etc.
Estimated Number of Respondents:
353,552
Frequency of Response: Annually, on
occasion
Estimated Total Annual Hour Burden:
3,792,432
Estimated Total Annual Cost:
$207,454,485, includes $6,389,900
annualized capital or O&M costs.
Changes in the Estimates: There is an
increase of 1,763,732 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. EPA had contacted small,
medium and large size facilities in both
manufacturing and non-manufacturing
sectors to develop this burden. In
previous ICRs, the Agency only
contacted small and medium size
facilities and used a weighted average.
For this ICR, EPA applied the burden
reported by each sector that we
contacted. There is a decrease of
209,948 in the estimated universe from
the previous ICR. EPA believes that the
universe estimates in this ICR are more
accurate since most States now collect
Tier II electronically so they were able
to provide EPA with a better estimate of
the number of facilities subject to
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
4211
sections 311 and 312 than was
estimated in previous years.
Dated: January 17, 2008.
Sara Hisel-McCoy,
Director, Collection Strategies Division.
[FR Doc. E8–1187 Filed 1–23–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2007–0032; FRL–8519–8]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; NSPS for Portland Cement
Plants (Renewal), EPA ICR Number
1051.10, OMB Control Number 2060–
0025
Environmental Protection
Agency.
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
to renew an existing approved
collection. The ICR which is abstracted
below describes the nature of the
collection and the estimated burden and
cost.
DATES: Additional comments may be
submitted on or before February 25,
2008.
Submit your comments,
referencing docket ID number EPA–HQ–
OECA–2007–0032, to (1) EPA online
using www.regulations.gov (our
preferred method), or by e-mail to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center (EPA/DC), Environmental
Protection Agency, Enforcement and
Compliance Docket and Information
Center, mail code 2822T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, and (2) OMB at:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street, NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT:
Leonard Lazarus, Compliance
Assessment and Media Programs
Division (CAMPD), Office of
Compliance, (2223A), Environmental
Protection Agency, 1200 Pennsylvania
Ave., NW., Washington, DC 20460;
telephone number: (202) 564–6369; fax
number: (202) 564–0050; e-mail address:
lazarus.leonard@epa.gov.
ADDRESSES:
E:\FR\FM\24JAN1.SGM
24JAN1
4212
Federal Register / Vol. 73, No. 16 / Thursday, January 24, 2008 / Notices
EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On March 9, 2007 (72 FR 10735), EPA
sought comments on this ICR pursuant
to 5 CFR 1320.8(d). EPA received no
comments. Any additional comments on
this ICR should be submitted to EPA
and OMB within 30 days of this notice.
EPA has established a public docket
for this ICR under docket ID number
EPA–HQ–OECA–2007–0032, which is
available for public viewing online at
https://www.regulations.gov, in person
viewing at the Enforcement and
Compliance Docket in the EPA Docket
Center (EPA/DC), EPA West, Room
3334, 1301 Constitution Avenue, NW.,
Washington, DC. The EPA Docket
Center Public Reading Room is open
from 8:30 a.m. to 4:30 p.m., Monday
through Friday, excluding legal
holidays. The telephone number for the
Reading Room is (202) 566–1744, and
the telephone number for the
Enforcement and Compliance Docket is
(202) 566–1752.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov,
as EPA receives them and without
change, unless the comment contains
copyrighted material, confidential
business information (CBI), or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to www.regulations.gov.
Title: NSPS for Portland Cement
Plants (Renewal).
ICR Numbers: EPA ICR Number
1051.10, OMB Control Number 2060–
0025.
ICR Status: This ICR is scheduled to
expire on January 31, 2008. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while his submission is
pending at OMB. An Agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
jlentini on PROD1PC65 with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Aug<31>2005
20:35 Jan 23, 2008
Jkt 214001
and displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: Particulate matter emissions
from portland cement plants cause or
contribute to air pollution that may
reasonably be anticipated to endanger
public health or welfare. Therefore,
NSPS were promulgated for this source
category.
The control of emissions of
particulate matter from portland cement
plants requires not only the installation
of properly designed equipment, but
also the operation and maintenance of
that equipment. Emissions of particulate
matter from portland cement plants are
the result of operation of kilns, clinker
coolers, raw mill systems, raw mill
dryers, raw material storage, clinker
storage, finished product storage,
conveyor transfer points, bagging and
bulk loading and unloading systems.
These standards rely on the capture of
particulate emissions by a baghouse or
electrostatic precipitator.
In order to ensure compliance with
these standards, adequate reporting and
recordkeeping is necessary. In the
absence of such information,
enforcement personnel would be unable
to determine whether the standards are
being met on a continuous basis, as
required by the Clean Air Act.
All reports are sent to the delegated
state or local authority. In the event that
there is no such delegated authority, the
reports are sent directly to the EPA
regional office. Notifications are used to
inform the Agency or delegated
authority when a source becomes
subject to the standard. The reviewing
authority may then inspect the source to
check if the pollution control devices
are properly installed and operated.
Performance test reports are needed as
these are the Agency’s record of a
source’s initial capability to comply
with the emission standard and note the
operating conditions under which
compliance was achieved. The quarterly
reports are used for problem
identification, as a check on source
operation and maintenance, and for
compliance determinations. The
standard also requires semiannual
reporting of deviations from monitored
opacity, as this is a good indicator of the
source’s compliance status.
Responses to this information
collection are mandatory (40 CFR part
60, subpart F). Any information
submitted to the Agency for which a
claim of confidentiality is made will be
safeguarded according to the Agency
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
policies set forth in title 40, chapter 1,
part 2, subpart B—Confidentiality of
Business Information (see 40 CFR 2; 41
FR 36902, September 1, 1976; amended
by 43 FR 40000, September 8, 1978; 43
FR 42251, September 20, 1978; 44 FR
17674, March 23, 1979).
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 56 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities:
Portland Cement Plants.
Estimated Number of Respondents:
118.
Frequency of Response: Initially and
Semiannually.
Estimated Total Annual Hour Burden:
13,806 hours.
Estimated Total Annual Cost:
$1,413,511, which includes capital/
startup costs of $37,000, O&M costs of
$495,600, and labor costs of $880,911.
Changes in the Estimates: There is no
change in the labor hours or cost in this
ICR compared to the previous ICR. This
is due to two considerations. First, the
regulations have not changed over the
past three years and are not anticipated
to change over the next three years.
Secondly, the growth rate for the
industry is very low, negative or nonexistent, so there is no significant
change in the overall burden.
Since there are no changes in the
regulatory requirements and there is no
significant industry growth, the labor
hours and cost figures in the previous
ICR are used in this ICR and there is no
change in burden to industry.
Dated: January 17, 2008.
Sara Hisel-McCoy,
Director, Collection Strategies Division.
[FR Doc. E8–1188 Filed 1–23–08; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\24JAN1.SGM
24JAN1
Agencies
[Federal Register Volume 73, Number 16 (Thursday, January 24, 2008)]
[Notices]
[Pages 4211-4212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1188]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2007-0032; FRL-8519-8]
Agency Information Collection Activities; Submission to OMB for
Review and Approval; Comment Request; NSPS for Portland Cement Plants
(Renewal), EPA ICR Number 1051.10, OMB Control Number 2060-0025
AGENCY: Environmental Protection Agency.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501
et seq.), this document announces that an Information Collection
Request (ICR) has been forwarded to the Office of Management and Budget
(OMB) for review and approval. This is a request to renew an existing
approved collection. The ICR which is abstracted below describes the
nature of the collection and the estimated burden and cost.
DATES: Additional comments may be submitted on or before February 25,
2008.
ADDRESSES: Submit your comments, referencing docket ID number EPA-HQ-
OECA-2007-0032, to (1) EPA online using www.regulations.gov (our
preferred method), or by e-mail to docket.oeca@epa.gov, or by mail to:
EPA Docket Center (EPA/DC), Environmental Protection Agency,
Enforcement and Compliance Docket and Information Center, mail code
2822T, 1200 Pennsylvania Avenue, NW., Washington, DC 20460, and (2) OMB
at: Office of Information and Regulatory Affairs, Office of Management
and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street,
NW., Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Leonard Lazarus, Compliance Assessment
and Media Programs Division (CAMPD), Office of Compliance, (2223A),
Environmental Protection Agency, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460; telephone number: (202) 564-6369; fax number:
(202) 564-0050; e-mail address: lazarus.leonard@epa.gov.
[[Page 4212]]
SUPPLEMENTARY INFORMATION: EPA has submitted the following ICR to OMB
for review and approval according to the procedures prescribed in 5 CFR
1320.12. On March 9, 2007 (72 FR 10735), EPA sought comments on this
ICR pursuant to 5 CFR 1320.8(d). EPA received no comments. Any
additional comments on this ICR should be submitted to EPA and OMB
within 30 days of this notice.
EPA has established a public docket for this ICR under docket ID
number EPA-HQ-OECA-2007-0032, which is available for public viewing
online at https://www.regulations.gov, in person viewing at the
Enforcement and Compliance Docket in the EPA Docket Center (EPA/DC),
EPA West, Room 3334, 1301 Constitution Avenue, NW., Washington, DC. The
EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30
p.m., Monday through Friday, excluding legal holidays. The telephone
number for the Reading Room is (202) 566-1744, and the telephone number
for the Enforcement and Compliance Docket is (202) 566-1752.
Use EPA's electronic docket and comment system at https://
www.regulations.gov, to submit or view public comments, access the
index listing of the contents of the docket, and to access those
documents in the docket that are available electronically. Once in the
system, select ``docket search,'' then key in the docket ID number
identified above. Please note that EPA's policy is that public
comments, whether submitted electronically or in paper, will be made
available for public viewing at https://www.regulations.gov, as EPA
receives them and without change, unless the comment contains
copyrighted material, confidential business information (CBI), or other
information whose public disclosure is restricted by statute. For
further information about the electronic docket, go to
www.regulations.gov.
Title: NSPS for Portland Cement Plants (Renewal).
ICR Numbers: EPA ICR Number 1051.10, OMB Control Number 2060-0025.
ICR Status: This ICR is scheduled to expire on January 31, 2008.
Under OMB regulations, the Agency may continue to conduct or sponsor
the collection of information while his submission is pending at OMB.
An Agency may not conduct or sponsor, and a person is not required to
respond to, a collection of information unless it displays a currently
valid OMB control number. The OMB control numbers for EPA's regulations
in title 40 of the CFR, after appearing in the Federal Register when
approved, are listed in 40 CFR part 9, and displayed either by
publication in the Federal Register or by other appropriate means, such
as on the related collection instrument or form, if applicable. The
display of OMB control numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: Particulate matter emissions from portland cement plants
cause or contribute to air pollution that may reasonably be anticipated
to endanger public health or welfare. Therefore, NSPS were promulgated
for this source category.
The control of emissions of particulate matter from portland cement
plants requires not only the installation of properly designed
equipment, but also the operation and maintenance of that equipment.
Emissions of particulate matter from portland cement plants are the
result of operation of kilns, clinker coolers, raw mill systems, raw
mill dryers, raw material storage, clinker storage, finished product
storage, conveyor transfer points, bagging and bulk loading and
unloading systems. These standards rely on the capture of particulate
emissions by a baghouse or electrostatic precipitator.
In order to ensure compliance with these standards, adequate
reporting and recordkeeping is necessary. In the absence of such
information, enforcement personnel would be unable to determine whether
the standards are being met on a continuous basis, as required by the
Clean Air Act.
All reports are sent to the delegated state or local authority. In
the event that there is no such delegated authority, the reports are
sent directly to the EPA regional office. Notifications are used to
inform the Agency or delegated authority when a source becomes subject
to the standard. The reviewing authority may then inspect the source to
check if the pollution control devices are properly installed and
operated. Performance test reports are needed as these are the Agency's
record of a source's initial capability to comply with the emission
standard and note the operating conditions under which compliance was
achieved. The quarterly reports are used for problem identification, as
a check on source operation and maintenance, and for compliance
determinations. The standard also requires semiannual reporting of
deviations from monitored opacity, as this is a good indicator of the
source's compliance status.
Responses to this information collection are mandatory (40 CFR part
60, subpart F). Any information submitted to the Agency for which a
claim of confidentiality is made will be safeguarded according to the
Agency policies set forth in title 40, chapter 1, part 2, subpart B--
Confidentiality of Business Information (see 40 CFR 2; 41 FR 36902,
September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR
42251, September 20, 1978; 44 FR 17674, March 23, 1979).
Burden Statement: The annual public reporting and recordkeeping
burden for this collection of information is estimated to average 56
hours per response. Burden means the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire,
install, and utilize technology and systems for the purposes of
collecting, validating, and verifying information, processing and
maintaining information, and disclosing and providing information;
adjust the existing ways to comply with any previously applicable
instructions and requirements which have subsequently changed; train
personnel to be able to respond to a collection of information; search
data sources; complete and review the collection of information; and
transmit or otherwise disclose the information.
Respondents/Affected Entities: Portland Cement Plants.
Estimated Number of Respondents: 118.
Frequency of Response: Initially and Semiannually.
Estimated Total Annual Hour Burden: 13,806 hours.
Estimated Total Annual Cost: $1,413,511, which includes capital/
startup costs of $37,000, O&M costs of $495,600, and labor costs of
$880,911.
Changes in the Estimates: There is no change in the labor hours or
cost in this ICR compared to the previous ICR. This is due to two
considerations. First, the regulations have not changed over the past
three years and are not anticipated to change over the next three
years. Secondly, the growth rate for the industry is very low, negative
or non-existent, so there is no significant change in the overall
burden.
Since there are no changes in the regulatory requirements and there
is no significant industry growth, the labor hours and cost figures in
the previous ICR are used in this ICR and there is no change in burden
to industry.
Dated: January 17, 2008.
Sara Hisel-McCoy,
Director, Collection Strategies Division.
[FR Doc. E8-1188 Filed 1-23-08; 8:45 am]
BILLING CODE 6560-50-P