Eastern States: Filing of Plat of Survey, 4264 [E8-1176]

Download as PDF 4264 Federal Register / Vol. 73, No. 16 / Thursday, January 24, 2008 / Notices such choice, the logical conclusion is that the authors envisaged that the resulting transaction value would be the same whether the importation involves a single sale or a series of sales (i.e., transaction value would normally be determined based on the price paid by the buyer in the country of importation). Otherwise, they would have either specified how transaction value should be determined in a series of sales situation or provided an explicit choice to Members. jlentini on PROD1PC65 with NOTICES Practical Consideration 26. In practice, the Customs administration may face difficulties in verifying information, including accounting records, related to the first sale when such information is held by the foreign intermediary or seller. This could include, for example, information and accounting records pertaining to the total payment made by the foreign intermediary to the seller and the Article 8 adjustments. Such difficulties are alleviated when the last sale is applied. 5. Conclusion 27. The Technical Committee is of the view that the underlying assumption of Article 1 is that normally the buyer would be located in the country of importation and that the price actually paid or payable would be based on the price paid by this buyer. The Technical Committee concludes that in a series of sales situation, the price actually paid or payable for the imported goods when sold for export to the country of importation is the price paid in the last sale occurring prior to the introduction of the goods into the country of importation, instead of the first (or earlier) sale. This is consistent with the purpose and overall text of the Agreement. 28. In the example, consistent with the conclusion, the sale between A and B represents such a sale. Therefore, the price actually paid or payable for the imported goods when sold for export to country I is 10,000 c.u. (the price A pays B in the last sale). 29. Accordingly, the 1,200 c.u. payment from A to B represents proceeds of a subsequent resale of the imported goods that accrues directly or indirectly to the seller under Article 8.1(d) that must be added to the price actually paid or payable in determining transaction value. Com. 22.1 Amending Supplement No. 6—July 2007 Notice of public meeting. DEPARTMENT OF THE INTERIOR ACTION: Bureau of Land Management SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA), the Federal Advisory Committee Act of 1972 (FACA), and the Federal Lands Recreation Enhancement Act of 2004 (FLREA), the U.S. Department of the Interior, Bureau of Land Management (BLM) Twin Falls District Resource Advisory Council (RAC) will meet as indicated below. [ES–956–07–1910–4482; Group No. 29, Illinois] Eastern States: Filing of Plat of Survey Bureau of Land Management, Interior. ACTION: Notice of filing of plat of survey; Minnesota. AGENCY: SUMMARY: The Bureau of Land Management (BLM) will file the plat of survey of the lands described below in the BLM-Eastern States, Springfield, Virginia, 30 calendar days from the date of publication in the Federal Register. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 7450 Boston Boulevard, Springfield, Virginia 22153. Attn: Cadastral Survey. SUPPLEMENTARY INFORMATION: This survey was requested by the U.S. Army Corps of Engineers. The lands we surveyed are: Third Principal Meridian, Illinois T. 3 N., R. 10 W. The plat of survey represents the corrective survey of a portion of the Lock and Dam No. 27 Acquisition Boundary in Township 3 North, Range 10 West of the Third Principal Meridian, The State of Illinois, and was accepted December 27, 2007. This corrective survey placed Angle Points Nos. 70 and 71 in their correct positions. We will place a copy of the plat we described in the open files. It will be available to the public as a matter of information. If BLM receives a protest against this survey, as shown on the plat, prior to the date of the official filing, we will stay the filing pending our consideration of the protest. We will not officially file the plat until the day after we have accepted or dismissed all protests and they have become final, including decisions on appeals. Dated: January 16, 2008. Joseph W. Beaudin, Acting Chief Cadastral Surveyor. [FR Doc. E8–1176 Filed 1–23–08; 8:45 am] BILLING CODE 4310–GJ–P DEPARTMENT OF THE INTERIOR Bureau of Land Management [ID–200–1120–DD–241A] Notice of Public Meeting, Twin Falls District Resource Advisory Council Meeting, Idaho [FR Doc. E8–1140 Filed 1–23–08; 8:45 am] AGENCY: BILLING CODE 9111–14–P February 21, 2008. The meeting will start at 8:30 a.m. and end no later than 4 p.m. The public comment period will be from 9:30 a.m. to 10 a.m. The meeting will be held at the Red Lion Canyon Springs Hotel, 1357 Blue Lakes Boulevard, Twin Falls, Idaho, 83301. DATES: FOR FURTHER INFORMATION CONTACT: Heather Tiel-Nelson, Twin Falls District, Idaho, 2536 Kimberly Road, Twin Falls, Idaho 83301, (208) 736– 2352. The 15member RAC advises the Secretary of the Interior, through the Bureau of Land Management, on a variety of planning and management issues associated with public land management in Idaho. The agenda will include the following topics: welcome to new members, Field Office updates, energy projects discussion, Twin Falls District fire rehabilitation efforts and planning for upcoming tours for the RAC. Additional topics may be added and will be included in local media announcements. More information is available at www.blm.gov/id/st/en/res/ resource_advisory.3.html. All meetings are open to the public. The public may present written comments to the RAC in advance of or at the meeting. Each formal RAC meeting will also have time allocated for receiving public comments. Depending on the number of persons wishing to comment and time available, the time for individual oral comments may be limited. Individuals who plan to attend and need special assistance, such as sign language interpretation or other reasonable accommodations, should contact the BLM as provided above. SUPPLEMENTARY INFORMATION: Dated: January 15, 2008. Bill Baker, District Manager. [FR Doc. E8–1134 Filed 1–23–08; 8:45 am] BILLING CODE 4310–GG–P Interior. VerDate Aug<31>2005 20:35 Jan 23, 2008 Jkt 214001 PO 00000 Bureau of Land Management, Frm 00093 Fmt 4703 Sfmt 4703 E:\FR\FM\24JAN1.SGM 24JAN1

Agencies

[Federal Register Volume 73, Number 16 (Thursday, January 24, 2008)]
[Notices]
[Page 4264]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1176]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[ES-956-07-1910-4482; Group No. 29, Illinois]


Eastern States: Filing of Plat of Survey

AGENCY: Bureau of Land Management, Interior.

ACTION: Notice of filing of plat of survey; Minnesota.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) will file the plat of 
survey of the lands described below in the BLM-Eastern States, 
Springfield, Virginia, 30 calendar days from the date of publication in 
the Federal Register.

FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 7450 Boston 
Boulevard, Springfield, Virginia 22153. Attn: Cadastral Survey.

SUPPLEMENTARY INFORMATION: This survey was requested by the U.S. Army 
Corps of Engineers.
    The lands we surveyed are:

Third Principal Meridian, Illinois

T. 3 N., R. 10 W.

    The plat of survey represents the corrective survey of a portion 
of the Lock and Dam No. 27 Acquisition Boundary in Township 3 North, 
Range 10 West of the Third Principal Meridian, The State of 
Illinois, and was accepted December 27, 2007. This corrective survey 
placed Angle Points Nos. 70 and 71 in their correct positions.
    We will place a copy of the plat we described in the open files. 
It will be available to the public as a matter of information.

    If BLM receives a protest against this survey, as shown on the 
plat, prior to the date of the official filing, we will stay the filing 
pending our consideration of the protest.
    We will not officially file the plat until the day after we have 
accepted or dismissed all protests and they have become final, 
including decisions on appeals.

    Dated: January 16, 2008.
Joseph W. Beaudin,
Acting Chief Cadastral Surveyor.
 [FR Doc. E8-1176 Filed 1-23-08; 8:45 am]
BILLING CODE 4310-GJ-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.