Eastern States: Filing of Plat of Survey, 4264 [E8-1176]
Download as PDF
4264
Federal Register / Vol. 73, No. 16 / Thursday, January 24, 2008 / Notices
such choice, the logical conclusion is
that the authors envisaged that the
resulting transaction value would be the
same whether the importation involves
a single sale or a series of sales (i.e.,
transaction value would normally be
determined based on the price paid by
the buyer in the country of importation).
Otherwise, they would have either
specified how transaction value should
be determined in a series of sales
situation or provided an explicit choice
to Members.
jlentini on PROD1PC65 with NOTICES
Practical Consideration
26. In practice, the Customs
administration may face difficulties in
verifying information, including
accounting records, related to the first
sale when such information is held by
the foreign intermediary or seller. This
could include, for example, information
and accounting records pertaining to the
total payment made by the foreign
intermediary to the seller and the
Article 8 adjustments. Such difficulties
are alleviated when the last sale is
applied.
5. Conclusion
27. The Technical Committee is of the
view that the underlying assumption of
Article 1 is that normally the buyer
would be located in the country of
importation and that the price actually
paid or payable would be based on the
price paid by this buyer. The Technical
Committee concludes that in a series of
sales situation, the price actually paid or
payable for the imported goods when
sold for export to the country of
importation is the price paid in the last
sale occurring prior to the introduction
of the goods into the country of
importation, instead of the first (or
earlier) sale. This is consistent with the
purpose and overall text of the
Agreement.
28. In the example, consistent with
the conclusion, the sale between A and
B represents such a sale. Therefore, the
price actually paid or payable for the
imported goods when sold for export to
country I is 10,000 c.u. (the price A pays
B in the last sale).
29. Accordingly, the 1,200 c.u.
payment from A to B represents
proceeds of a subsequent resale of the
imported goods that accrues directly or
indirectly to the seller under Article
8.1(d) that must be added to the price
actually paid or payable in determining
transaction value.
Com. 22.1
Amending Supplement No. 6—July
2007
Notice of public meeting.
DEPARTMENT OF THE INTERIOR
ACTION:
Bureau of Land Management
SUMMARY: In accordance with the
Federal Land Policy and Management
Act (FLPMA), the Federal Advisory
Committee Act of 1972 (FACA), and the
Federal Lands Recreation Enhancement
Act of 2004 (FLREA), the U.S.
Department of the Interior, Bureau of
Land Management (BLM) Twin Falls
District Resource Advisory Council
(RAC) will meet as indicated below.
[ES–956–07–1910–4482; Group No. 29,
Illinois]
Eastern States: Filing of Plat of Survey
Bureau of Land Management,
Interior.
ACTION: Notice of filing of plat of survey;
Minnesota.
AGENCY:
SUMMARY: The Bureau of Land
Management (BLM) will file the plat of
survey of the lands described below in
the BLM-Eastern States, Springfield,
Virginia, 30 calendar days from the date
of publication in the Federal Register.
FOR FURTHER INFORMATION CONTACT:
Bureau of Land Management, 7450
Boston Boulevard, Springfield, Virginia
22153. Attn: Cadastral Survey.
SUPPLEMENTARY INFORMATION: This
survey was requested by the U.S. Army
Corps of Engineers.
The lands we surveyed are:
Third Principal Meridian, Illinois
T. 3 N., R. 10 W.
The plat of survey represents the corrective
survey of a portion of the Lock and Dam No.
27 Acquisition Boundary in Township 3
North, Range 10 West of the Third Principal
Meridian, The State of Illinois, and was
accepted December 27, 2007. This corrective
survey placed Angle Points Nos. 70 and 71
in their correct positions.
We will place a copy of the plat we
described in the open files. It will be
available to the public as a matter of
information.
If BLM receives a protest against this
survey, as shown on the plat, prior to
the date of the official filing, we will
stay the filing pending our
consideration of the protest.
We will not officially file the plat
until the day after we have accepted or
dismissed all protests and they have
become final, including decisions on
appeals.
Dated: January 16, 2008.
Joseph W. Beaudin,
Acting Chief Cadastral Surveyor.
[FR Doc. E8–1176 Filed 1–23–08; 8:45 am]
BILLING CODE 4310–GJ–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[ID–200–1120–DD–241A]
Notice of Public Meeting, Twin Falls
District Resource Advisory Council
Meeting, Idaho
[FR Doc. E8–1140 Filed 1–23–08; 8:45 am]
AGENCY:
BILLING CODE 9111–14–P
February 21, 2008. The meeting
will start at 8:30 a.m. and end no later
than 4 p.m. The public comment period
will be from 9:30 a.m. to 10 a.m. The
meeting will be held at the Red Lion
Canyon Springs Hotel, 1357 Blue Lakes
Boulevard, Twin Falls, Idaho, 83301.
DATES:
FOR FURTHER INFORMATION CONTACT:
Heather Tiel-Nelson, Twin Falls
District, Idaho, 2536 Kimberly Road,
Twin Falls, Idaho 83301, (208) 736–
2352.
The 15member RAC advises the Secretary of
the Interior, through the Bureau of Land
Management, on a variety of planning
and management issues associated with
public land management in Idaho. The
agenda will include the following
topics: welcome to new members, Field
Office updates, energy projects
discussion, Twin Falls District fire
rehabilitation efforts and planning for
upcoming tours for the RAC. Additional
topics may be added and will be
included in local media
announcements. More information is
available at www.blm.gov/id/st/en/res/
resource_advisory.3.html.
All meetings are open to the public.
The public may present written
comments to the RAC in advance of or
at the meeting. Each formal RAC
meeting will also have time allocated for
receiving public comments. Depending
on the number of persons wishing to
comment and time available, the time
for individual oral comments may be
limited. Individuals who plan to attend
and need special assistance, such as
sign language interpretation or other
reasonable accommodations, should
contact the BLM as provided above.
SUPPLEMENTARY INFORMATION:
Dated: January 15, 2008.
Bill Baker,
District Manager.
[FR Doc. E8–1134 Filed 1–23–08; 8:45 am]
BILLING CODE 4310–GG–P
Interior.
VerDate Aug<31>2005
20:35 Jan 23, 2008
Jkt 214001
PO 00000
Bureau of Land Management,
Frm 00093
Fmt 4703
Sfmt 4703
E:\FR\FM\24JAN1.SGM
24JAN1
Agencies
[Federal Register Volume 73, Number 16 (Thursday, January 24, 2008)]
[Notices]
[Page 4264]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1176]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[ES-956-07-1910-4482; Group No. 29, Illinois]
Eastern States: Filing of Plat of Survey
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of filing of plat of survey; Minnesota.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) will file the plat of
survey of the lands described below in the BLM-Eastern States,
Springfield, Virginia, 30 calendar days from the date of publication in
the Federal Register.
FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 7450 Boston
Boulevard, Springfield, Virginia 22153. Attn: Cadastral Survey.
SUPPLEMENTARY INFORMATION: This survey was requested by the U.S. Army
Corps of Engineers.
The lands we surveyed are:
Third Principal Meridian, Illinois
T. 3 N., R. 10 W.
The plat of survey represents the corrective survey of a portion
of the Lock and Dam No. 27 Acquisition Boundary in Township 3 North,
Range 10 West of the Third Principal Meridian, The State of
Illinois, and was accepted December 27, 2007. This corrective survey
placed Angle Points Nos. 70 and 71 in their correct positions.
We will place a copy of the plat we described in the open files.
It will be available to the public as a matter of information.
If BLM receives a protest against this survey, as shown on the
plat, prior to the date of the official filing, we will stay the filing
pending our consideration of the protest.
We will not officially file the plat until the day after we have
accepted or dismissed all protests and they have become final,
including decisions on appeals.
Dated: January 16, 2008.
Joseph W. Beaudin,
Acting Chief Cadastral Surveyor.
[FR Doc. E8-1176 Filed 1-23-08; 8:45 am]
BILLING CODE 4310-GJ-P