Download as PDF ebenthall on PROD1PC69 with NOTICES Federal Register / Vol. 73, No. 15 / Wednesday, January 23, 2008 / Notices between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397–4209 or locally, (301) 415–4737. Participants who believe that they have good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville, Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. Documents submitted in adjudicatory proceedings will appear in NRC’s electronic hearing docket which is available to the public at https:// ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, Participants are requested not to include copyrighted materials in their works. If a person other than SCE requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309(d). If a hearing is requested by a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearing. If a hearing is held, the issue to be considered at such hearing shall be whether this Confirmatory Order should be sustained. An answer or a request for hearing shall not stay the immediate effectiveness of this order. Dated this 11th day of January, 2008. VerDate Aug<31>2005 15:17 Jan 22, 2008 Jkt 214001 For the Nuclear Regulatory Commission. Elmo E. Collins, Regional Administrator. [FR Doc. E8–1079 Filed 1–22–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 72–26–ISFSI; ASLBP No. 08– 860–01–ISFSI–BD01] Pacific Gas and Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation); Designation of Presiding Officer Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 29, 1972), and the Commission’s regulations, see 10 CFR 2.313(a)(2), 2.318, 2.1300, and 2.1319(a), notice is hereby given that a member of the Atomic Safety and Licensing Board Panel is being designated as Presiding Officer in the following proceeding in compliance with the Commission’s directions in its Memorandum and Order dated January 15, 2008 (CLI–08– 01): Pacific Gas and Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation). This proceeding, which will be conducted pursuant to Subpart K of the Commission’s pre-2004 Part 2 procedural rules Regulations (CLI–08– 01, slip op. at 4), concerns a license application for an independent spent fuel storage installation (‘‘ISFSI’’) at the site of the Diablo Canyon nuclear power reactor in California. Pursuant to the Ninth Circuit’s order in San Luis Obispo Mothers for Peace v. NRC, 449 F.3d 1016 (9th Cir. 2006), cert. denied, 127 S. Ct. 1124 (2007), the Nuclear Regulatory Commission (‘‘NRC’’) has undertaken a NEPA-terrorism review for this licensing proceeding. The NRC Staff prepared a revised environmental assessment (‘‘EA’’) addressing the likelihood of a terrorist attack at the Diablo Canyon ISFSI site and the potential consequence of such an attack (CLI–08–01, slip op. at 1). The Commission admitted limited portions of two contentions—Contentions 1(b) and 2—proffered by the San Luis Obispo Mothers for Peace challenging the Staff’s EA (id., slip op. at 3, 29). The Commission set a tentative schedule for further consideration of Contention 1(b), for discovery, and for an ultimate Subpart K oral argument-type hearing on Contention 2 (id., slip op. at 30–31). Stating that it remains ‘‘committed to a prompt resolution of this proceeding,’’ the Commission directed the designation of a Presiding Officer to ‘‘keep discovery on schedule, if PO 00000 Frm 00099 Fmt 4703 Sfmt 4703 4019 necessary by setting schedules, and by resolving promptly any discovery disputes, including privilege, materiality, and burdensomeness controversies’’ (id., slip op. at 30, 31). The Presiding Officer is: Administrative Judge E. Roy Hawkens, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. All correspondence, documents, and other materials that relate to keeping discovery on schedule shall be filed with the Presiding Officer in accordance with 10 CFR 2.302 (2007). Issued at Rockville, Maryland, this 16th day of January 2008. E. Roy Hawkens, Chief Administrative Judge, Atomic Safety and Licensing Board Panel. [FR Doc. E8–1074 Filed 1–22–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Sunshine Federal Register Notice Weeks of January 21, 28, February 4, 11, 18, 25, 2008. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. MATTERS TO BE CONSIDERED: DATE: Week of January 21, 2008 There are no meetings scheduled for the Week of January 21, 2008. Week of January 28, 2008—Tentative There are no meetings scheduled for the Week of January 28, 2008. Week of February 4, 2008—Tentative There are no meetings scheduled for the Week of February 4, 2008. Week of February 11, 2008—Tentative There are no meetings scheduled for the Week of February 11, 2008. Week of February 18, 2008—Tentative Wednesday, February 20, 2008: 9:30 a.m. Periodic Meeting on New Reactor Issues, Part 1 (Public Meeting) (Contact: Donna Williams, 301– 415–1322). 1:30 p.m. Periodic Meeting on New Reactor Issues, Part 2 (Public Meeting) (Contact: Donna Williams, 301– 415–1322). This meeting, parts 1 and 2, will be webcast live at the Web address—https:// www.nrc.gov. E:\FR\FM\23JAN1.SGM 23JAN1

Agencies

[Federal Register Volume 73, Number 15 (Wednesday, January 23, 2008)]
[Notices]
[Page 4019]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1074]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 72-26-ISFSI; ASLBP No. 08-860-01-ISFSI-BD01]


Pacific Gas and Electric Co. (Diablo Canyon Power Plant 
Independent Spent Fuel Storage Installation); Designation of Presiding 
Officer

    Pursuant to delegation by the Commission, see 37 FR 28,710 (Dec. 
29, 1972), and the Commission's regulations, see 10 CFR 2.313(a)(2), 
2.318, 2.1300, and 2.1319(a), notice is hereby given that a member of 
the Atomic Safety and Licensing Board Panel is being designated as 
Presiding Officer in the following proceeding in compliance with the 
Commission's directions in its Memorandum and Order dated January 15, 
2008 (CLI-08-01): Pacific Gas and Electric Co. (Diablo Canyon Power 
Plant Independent Spent Fuel Storage Installation).
    This proceeding, which will be conducted pursuant to Subpart K of 
the Commission's pre-2004 Part 2 procedural rules Regulations (CLI-08-
01, slip op. at 4), concerns a license application for an independent 
spent fuel storage installation (``ISFSI'') at the site of the Diablo 
Canyon nuclear power reactor in California. Pursuant to the Ninth 
Circuit's order in San Luis Obispo Mothers for Peace v. NRC, 449 F.3d 
1016 (9th Cir. 2006), cert. denied, 127 S. Ct. 1124 (2007), the Nuclear 
Regulatory Commission (``NRC'') has undertaken a NEPA-terrorism review 
for this licensing proceeding. The NRC Staff prepared a revised 
environmental assessment (``EA'') addressing the likelihood of a 
terrorist attack at the Diablo Canyon ISFSI site and the potential 
consequence of such an attack (CLI-08-01, slip op. at 1). The 
Commission admitted limited portions of two contentions--Contentions 
1(b) and 2--proffered by the San Luis Obispo Mothers for Peace 
challenging the Staff's EA (id., slip op. at 3, 29). The Commission set 
a tentative schedule for further consideration of Contention 1(b), for 
discovery, and for an ultimate Subpart K oral argument-type hearing on 
Contention 2 (id., slip op. at 30-31). Stating that it remains 
``committed to a prompt resolution of this proceeding,'' the Commission 
directed the designation of a Presiding Officer to ``keep discovery on 
schedule, if necessary by setting schedules, and by resolving promptly 
any discovery disputes, including privilege, materiality, and 
burdensomeness controversies'' (id., slip op. at 30, 31).
    The Presiding Officer is: Administrative Judge E. Roy Hawkens, 
Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.
    All correspondence, documents, and other materials that relate to 
keeping discovery on schedule shall be filed with the Presiding Officer 
in accordance with 10 CFR 2.302 (2007).

    Issued at Rockville, Maryland, this 16th day of January 2008.
E. Roy Hawkens,
Chief Administrative Judge, Atomic Safety and Licensing Board Panel.
[FR Doc. E8-1074 Filed 1-22-08; 8:45 am]