Trunkline Gas Company, LLC; Notice of Request Under Blanket Authorization, 3718 [E8-961]
Download as PDF
3718
Federal Register / Vol. 73, No. 14 / Tuesday, January 22, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding.
If you want to become an intervenor
you must file a motion to intervene
according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214) (see
Appendix 2).3 Only intervenors have
the right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
3 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate Aug<31>2005
20:38 Jan 18, 2008
Jkt 214001
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–974 Filed 1–18–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–50–000]
Trunkline Gas Company, LLC; Notice
of Request Under Blanket
Authorization
January 14, 2008.
Take notice that on January 9, 2008,
Trunkline Gas Company (Trunkline),
P.O. Box 4967, Houston, Texas 77210–
4967, filed in Docket No. CP08–50–000
a prior notice request pursuant to
sections 157.205, 157.208 and 157.212
of the Commission’s regulations under
the Natural Gas Act (NGA) and
Trunkline’s blanket certificate issued
January 10, 1983 in Docket No. CP83–
84–000, for authorization to construct
and operate a new interconnect with
Kinder Morgan Louisiana Pipeline, LLC
to receive revaporized liquefied natural
gas in Jefferson Davis Parish, Louisiana,
all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The estimated cost of constructing the
proposed facilities is $950,000.
Any questions regarding the
application should be directed to
Stephen T. Veach, Regulatory Affairs,
Trunkline Gas Company, 5444
Westheimer Road, Houston, Texas
77056, or fax (713) 989–1158, or e-mail
stephen.veach@sug.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: February 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–961 Filed 1–18–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF07–16–000]
UGI LNG, Inc.; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Temple LNG Plant
Expansion Project and Request for
Comments on Environmental Issues
January 15, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the proposed Temple LNG Plant
Expansion Project involving
construction and operation of facilities
by UGI LNG, Inc. (UGI LNG) in
Ontelaunee Township, Berks County,
Pennsylvania. The EA will be used by
E:\FR\FM\22JAN1.SGM
22JAN1
Agencies
[Federal Register Volume 73, Number 14 (Tuesday, January 22, 2008)]
[Notices]
[Page 3718]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-961]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-50-000]
Trunkline Gas Company, LLC; Notice of Request Under Blanket
Authorization
January 14, 2008.
Take notice that on January 9, 2008, Trunkline Gas Company
(Trunkline), P.O. Box 4967, Houston, Texas 77210-4967, filed in Docket
No. CP08-50-000 a prior notice request pursuant to sections 157.205,
157.208 and 157.212 of the Commission's regulations under the Natural
Gas Act (NGA) and Trunkline's blanket certificate issued January 10,
1983 in Docket No. CP83-84-000, for authorization to construct and
operate a new interconnect with Kinder Morgan Louisiana Pipeline, LLC
to receive revaporized liquefied natural gas in Jefferson Davis Parish,
Louisiana, all as more fully set forth in the application, which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the Web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or
TYY, (202) 502-8659.
The estimated cost of constructing the proposed facilities is
$950,000.
Any questions regarding the application should be directed to
Stephen T. Veach, Regulatory Affairs, Trunkline Gas Company, 5444
Westheimer Road, Houston, Texas 77056, or fax (713) 989-1158, or e-mail
stephen.veach@sug.com.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: February 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-961 Filed 1-18-08; 8:45 am]
BILLING CODE 6717-01-P