Environmental Impacts Statements; Notice of Availability, 3464 [E8-881]

Download as PDF 3464 Federal Register / Vol. 73, No. 13 / Friday, January 18, 2008 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6695–1] rwilkins on PROD1PC63 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 01/07/2008 through 01/11/2008. Pursuant to 40 CFR 1506.9. EIS No. 20080008, Draft EIS, NPS, NY, Governors Island National Monument, General Management Plan, Implementation, New York Harbor, NY, Comment Period Ends: 03/18/ 2008, Contact: Christine Gobrial 215– 597–1572. EIS No. 20080009, Final EIS, AFS, WY, Lower Valley Energy (LVE) Natural Gas Pipeline Project, Construction and Operation of a Pressurized Natural Gas Pipeline, Special-UseAuthorization, Big Piney and Jackson Ranger Districts, Bridger-Teton National Forest, Sublette and Teton Counties, WY, Wait Period Ends: 02/ 19/2008, Contact: Greg Clark 307– 276–3375. EIS No. 20080010, Draft EIS, FHW, 00, US–231/I–10 Connector Project HPP– 1602–(507), Proposal to Build Limited Access Facility from U.S. 231 North of Dothan to the Alabama/Florida State Line, Dale, Houston, Geneva Counties, AL, Comment Period Ends: 03/03/ 2008, Contact: Mark D. Bartlett 334– 223–7370. EIS No. 20080011, Final EIS, FHW, AK, Knik Arm Crossing Project, To Provide Improved Access between the Municipality of Anchorage and Matanuska-Susitna Borough, AK, Wait Period Ends: 02/19/2008, Contact: Edrie Vinson 907–586–7464. EIS No. 20080012, Final EIS, NAS, 00, Programmatic—Constellation Program, Develop the Flight Systems and Earth-based Ground Infrastructure for Future Missions, International Space Station, The Moon, Mars, and Beyond, Brevard and Volusia Counties, FL; Hancock County, MS; Orlean Parish, LA; Harris County, TX; Madison County, AL; Cuyahoga and Erie Counties, OH; Hampton, VA; Santa Clara County, CA; Dona Ana and Otero Counties, NM; and Box Elder and Davis Counties, UT, Wait Period Ends: 02/ 19/2008, Contact: Kathleen Callister 202–358–1953. EIS No. 20080013, Draft EIS, AFS, NM, Santa Fe National Forest Project, Settlement Land Transfers: Pueblo de VerDate Aug<31>2005 16:37 Jan 17, 2008 Jkt 214001 San lldefonso, Pueblo of Santa Clara and Los Alamos County, Implementation, Santa Fe National Forest, Los Alamos, Rio Arriba and Santa Fe Counties, NM, Comment Period Ends: 03/03/2008, Contact: Sandy Hurlocked 505–753–7331. EIS No. 20080014, Draft EIS, NPS, WA, San Juan Island National Historical Park, General Management Plan, Implementation, WA, Comment Period Ends: 03/17/2008, Contact: Cheryl Teaque 206–220–4112. EIS No. 20080015, Draft EIS, BLM, WY, Westside Land Conveyance Project, Congressionally-Mandated Transfer of 16,500 Acres of Public Land to the Westside Irrigation District, Big Horn and Washakie Counties, WY, Comment Period Ends: 03/03/2008, Contact: Don Ogaard 307–347–5160. This document is available on the Internet at: http://www.blm.gov/wy/st/ en/info/NEPA/wfodocs/westside.html. EIS No. 20080016, Draft EIS, FHW, ID, Three Cities River Crossing Project, New Roadway Crossing of the Boise River at the Juncture of the Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD), Ada County, ID, Comment Period Ends: 03/03/2008, Contact: Ross Blanchard 208–334–9180. EIS No. 20080017, Final EIS, COE, CA, San Clemente Dam Seismic Safety Project, Increase Dam Safety to Meet Current Design Standards, Monterey County, CA, Wait Period Ends: 02/19/ 2008, Contact: Robert Smith 415–503– 6792. EIS No. 20080018, Draft EIS, FHW, CA, Phase I—CA 11 Corridor Location and Route Adoption and Location Identification of the Otay Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and Acquisition of Right-of-Way Permit, San Diego County, CA, Comment Period Ends: 03/03/2008, Contact: Cesar Perez 916–498–5065. EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, Construction, Operation and Maintenance, and Decommissioning of a Electric Generation Facility, Barnstable, Nantucket and Duke County, MA and Washington County, RI, Comment Period Ends: 03/20/ 2008, Contact: Dr. Rodney E. Cluck 703–787–1087. EIS No. 20080020, Final EIS, FRC, NY, Broadwater Liquefied Natural Gas (LNG) Project, Construction and Operation a Natural Gas Pipeline Facilities, (Docket Nos. CP06–54, et al.), Long Island Sound, NY, Wait Period Ends: 02/19/2008, Contact: Andy Black 1–866–208–3372. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 Amended Notices EIS No. 20070508, Draft EIS, AFS, 00, Wild and Scenic River Suitability Study for National Forest System Lands on the Ashley, Dixie, Fishlake, Manti-La Sal, Uinta and WasatchCache National Forests in UT and Portion of National Forests extend into Colorado and Wyoming, several counties, UT, Montrose County, CO and Uinta County, WY, Wait Period Ends: 02/15/2008, Contact: Catherine Kahlow 435–783–4338. Revision of FR Notice Published 12/07/2007: Extending Comment Period from 01/ 22/2008 to 02/15/2008. Dated: January 15, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–881 Filed 1–17–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [CAXXX–NOA; FRL–8517–9] Official Release of EMFAC2007 Motor Vehicle Emission Factor Model for Use in the State of California Environmental Protection Agency (EPA). ACTION: Notice of Availability. AGENCY: SUMMARY: EPA is approving and announcing the availability of the latest version of the California EMFAC model for use in state implementation plan (SIP) development in California. EMFAC2007 is the latest update to the EMFAC model for use by California state and local governments to meet Clean Air Act (CAA) requirements. The new model, which is based on new and improved data, calculates air pollution emission factors for passenger cars, trucks, motorcycles, motor homes and buses. Today’s notice also sets the date after which EMFAC2007 is required to be used statewide in all new regional emissions analyses and carbon monoxide (CO) hot-spot analyses for transportation conformity determinations in California. EPA also intends to approve EMFAC2007 in the future for particulate matter (PM10 and PM2.5) hot-spot analyses in California, once EPA issues quantitative hot-spot modeling guidance for such analyses. Since the EMFAC model is used only in California, EPA’s approval of the model does not affect MOBILE model users in other states. DATES: This determination is effective January 18, 2008. EMFAC2007 must be used for all new regional emissions E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 73, Number 13 (Friday, January 18, 2008)]
[Notices]
[Page 3464]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-881]



[[Page 3464]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6695-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 01/07/2008 
through 01/11/2008. Pursuant to 40 CFR 1506.9.
EIS No. 20080008, Draft EIS, NPS, NY, Governors Island National 
Monument, General Management Plan, Implementation, New York Harbor, NY, 
Comment Period Ends: 03/18/2008, Contact: Christine Gobrial 215-597-
1572.
EIS No. 20080009, Final EIS, AFS, WY, Lower Valley Energy (LVE) Natural 
Gas Pipeline Project, Construction and Operation of a Pressurized 
Natural Gas Pipeline, Special-Use-Authorization, Big Piney and Jackson 
Ranger Districts, Bridger-Teton National Forest, Sublette and Teton 
Counties, WY, Wait Period Ends: 02/19/2008, Contact: Greg Clark 307-
276-3375.
EIS No. 20080010, Draft EIS, FHW, 00, US-231/I-10 Connector Project 
HPP-1602-(507), Proposal to Build Limited Access Facility from U.S. 231 
North of Dothan to the Alabama/Florida State Line, Dale, Houston, 
Geneva Counties, AL, Comment Period Ends: 03/03/2008, Contact: Mark D. 
Bartlett 334-223-7370.
EIS No. 20080011, Final EIS, FHW, AK, Knik Arm Crossing Project, To 
Provide Improved Access between the Municipality of Anchorage and 
Matanuska-Susitna Borough, AK, Wait Period Ends: 02/19/2008, Contact: 
Edrie Vinson 907-586-7464.
EIS No. 20080012, Final EIS, NAS, 00, Programmatic--Constellation 
Program, Develop the Flight Systems and Earth-based Ground 
Infrastructure for Future Missions, International Space Station, The 
Moon, Mars, and Beyond, Brevard and Volusia Counties, FL; Hancock 
County, MS; Orlean Parish, LA; Harris County, TX; Madison County, AL; 
Cuyahoga and Erie Counties, OH; Hampton, VA; Santa Clara County, CA; 
Dona Ana and Otero Counties, NM; and Box Elder and Davis Counties, UT, 
Wait Period Ends: 02/19/2008, Contact: Kathleen Callister 202-358-1953.
EIS No. 20080013, Draft EIS, AFS, NM, Santa Fe National Forest Project, 
Settlement Land Transfers: Pueblo de San lldefonso, Pueblo of Santa 
Clara and Los Alamos County, Implementation, Santa Fe National Forest, 
Los Alamos, Rio Arriba and Santa Fe Counties, NM, Comment Period Ends: 
03/03/2008, Contact: Sandy Hurlocked 505-753-7331.
EIS No. 20080014, Draft EIS, NPS, WA, San Juan Island National 
Historical Park, General Management Plan, Implementation, WA, Comment 
Period Ends: 03/17/2008, Contact: Cheryl Teaque 206-220-4112.
EIS No. 20080015, Draft EIS, BLM, WY, Westside Land Conveyance Project, 
Congressionally-Mandated Transfer of 16,500 Acres of Public Land to the 
Westside Irrigation District, Big Horn and Washakie Counties, WY, 
Comment Period Ends: 03/03/2008, Contact: Don Ogaard 307-347-5160. This 
document is available on the Internet at: http://www.blm.gov/wy/st/en/
info/NEPA/wfodocs/westside.html.
EIS No. 20080016, Draft EIS, FHW, ID, Three Cities River Crossing 
Project, New Roadway Crossing of the Boise River at the Juncture of the 
Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD), 
Ada County, ID, Comment Period Ends: 03/03/2008, Contact: Ross 
Blanchard 208-334-9180.
EIS No. 20080017, Final EIS, COE, CA, San Clemente Dam Seismic Safety 
Project, Increase Dam Safety to Meet Current Design Standards, Monterey 
County, CA, Wait Period Ends: 02/19/2008, Contact: Robert Smith 415-
503-6792.
EIS No. 20080018, Draft EIS, FHW, CA, Phase I--CA 11 Corridor Location 
and Route Adoption and Location Identification of the Otay Mesa East 
Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and 
Acquisition of Right-of-Way Permit, San Diego County, CA, Comment 
Period Ends: 03/03/2008, Contact: Cesar Perez 916-498-5065.
EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, 
Construction, Operation and Maintenance, and Decommissioning of a 
Electric Generation Facility, Barnstable, Nantucket and Duke County, MA 
and Washington County, RI, Comment Period Ends: 03/20/2008, Contact: 
Dr. Rodney E. Cluck 703-787-1087.
EIS No. 20080020, Final EIS, FRC, NY, Broadwater Liquefied Natural Gas 
(LNG) Project, Construction and Operation a Natural Gas Pipeline 
Facilities, (Docket Nos. CP06-54, et al.), Long Island Sound, NY, Wait 
Period Ends: 02/19/2008, Contact: Andy Black 1-866-208-3372.

Amended Notices

EIS No. 20070508, Draft EIS, AFS, 00, Wild and Scenic River Suitability 
Study for National Forest System Lands on the Ashley, Dixie, Fishlake, 
Manti-La Sal, Uinta and Wasatch-Cache National Forests in UT and 
Portion of National Forests extend into Colorado and Wyoming, several 
counties, UT, Montrose County, CO and Uinta County, WY, Wait Period 
Ends: 02/15/2008, Contact: Catherine Kahlow 435-783-4338. Revision of 
FR Notice Published 12/07/2007: Extending Comment Period from 01/22/
2008 to 02/15/2008.

    Dated: January 15, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-881 Filed 1-17-08; 8:45 am]
BILLING CODE 6560-50-P