Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Indian Point 3, LLC; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring and Opportunity for a Hearing, 2955-2956 [E8-639]

Download as PDF Federal Register / Vol. 73, No. 11 / Wednesday, January 16, 2008 / Notices page number of this Federal Register notice. For further details with respect to this action, see the application dated July 30, 2007, as supplemented by letter dated December 5, 2007, available for public inspection at the Commission’s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System’s (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/ adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800–397–4209, or 301–415–4737 or by e-mail to pdr@nrc.gov. Dated at Rockville, Maryland this 3rd day of January 2008. For The Nuclear Regulatory Commission. Douglas V. Pickett, Senior Project Manager, Plant Licensing Branch I–1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8–638 Filed 1–15–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–003, 50–247, and 50–286] jlentini on PROD1PC65 with NOTICES Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Indian Point 3, LLC; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring and Opportunity for a Hearing The U.S. Nuclear Regulatory Commission (the Commission) is considering the issuance of an Order under 10 CFR 50.80 approving the indirect transfer of the Facility Operating Licenses, which are numbered DPR–5, DPR–26, and DPR– 64, for the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3 currently held by Entergy Nuclear Indian Point 2, LLC (for Units 1 and 2) and Entergy Nuclear Indian Point 3, LLC (for Unit 3) as owners and Entergy Nuclear Operations, Inc. as the licensed operator of the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3. According to an application for approval filed by Entergy Nuclear VerDate Aug<31>2005 19:36 Jan 15, 2008 Jkt 214001 Operations, Inc. (ENOI) on behalf of itself and the owners, certain planned corporate restructuring transactions will involve the creation of new intermediary holding companies and/or changes in the intermediary holding companies within the ownership structure for the foregoing licensees. ENOI will continue to operate the facilities and Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC will continue to own the facilities. There will be no direct transfer of the licenses. However, the corporate restructuring transaction will result in an indirect transfer of control of the licenses. No physical changes to the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3 or operational changes are being proposed in the application. The Board of Directors of Entergy Corporation has proposed that the wholesale nuclear business segment be organized under a publicly owned holding company, referred to as ‘‘NewCo,’’ that will be the indirect parent company of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC. ENOI will be owned by a parent company referred to as ENOI Holdings, LLC, which, in turn, will be owned 50 percent by Entergy Corporation and 50 percent by NewCo. Each of these 50 percent interests will be held by wholly owned subsidiaries of Entergy Corporation and NewCo. ENOI will also be converted from a corporation to a limited liability company and its name will be changed to ENOI LLC. Under Delaware law, ENOI LLC will assume all of the rights and responsibilities of ENOI and it will be the same company (legal entity) both before and after the conversion and name change. ENOI will separately submit a request for license amendments to make the administrative changes as a result of ENOI’s name change from ‘‘Entergy Nuclear Operations, Inc.’’ to ‘‘ENOI LLC.’’ Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. The Commission will approve an application for the indirect transfer of a license, if the Commission determines that the proposed corporate restructuring will not affect the qualifications of the licensee to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and Orders issued by the Commission pursuant thereto. PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 2955 The filing of requests for hearing and petitions for leave to intervene, and written comments with regard to the license transfer application, are discussed below. Within 20 days from the date of publication of this notice, any person whose interest may be affected by the Commission’s action on the application may request a hearing and, if not the applicant, may petition for leave to intervene in a hearing proceeding on the Commission’s action. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commission’s rules of practice set forth in Subpart C ‘‘Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,’’ of 10 CFR part 2 and the NRC E–Filing rule discussed below. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(I)–(viii). Those permitted to intervene become parties to the proceeding, subject to any limitations in the Order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing. A request for hearing or a petition for leave to intervene must be filed in accordance with the NRC E–Filing rule, which the NRC promulgated in August, 2007, 72 FR 49139 (Aug. 28, 2007). The E–Filing process requires participants to submit and serve documents over the internet or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least five (5) days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at HEARINGDOCKET@NRC.GOV, or by calling (301) 415–1677, to request (1) a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or (2) creation of an electronic docket for the proceeding E:\FR\FM\16JAN1.SGM 16JAN1 jlentini on PROD1PC65 with NOTICES 2956 Federal Register / Vol. 73, No. 11 / Wednesday, January 16, 2008 / Notices (even in instances in which the petitioner/requestor (or its counsel or representative) already holds an NRCissued digital ID certificate). Each petitioner/requestor will need to download the Workplace Forms Viewer TM to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms ViewerTM is free and is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html. Information about applying for a digital ID certificate is available on NRC’s public Web site at https://www.nrc.gov/ site-help/e-submittals/applycertificates.html. Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public Web site at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically may seek assistance through the ‘‘Contact Us’’ link located on the NRC Web site at https://www.nrc.gov/site-help/esubmittals.html or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397–4209 or locally, (301) 415–4737. Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to VerDate Aug<31>2005 17:55 Jan 15, 2008 Jkt 214001 submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date. Documents submitted in adjudicatory proceedings will appear in NRC’s electronic hearing docket which is available to the public at https:// ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to an Order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their works. The Commission will issue a notice or Order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the Federal Register and served on the parties to the hearing. As an alternative to requests for hearing and petitions to intervene, within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided PO 00000 Frm 00076 Fmt 4703 Sfmt 4703 for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this Federal Register notice. For further details with respect to this action, see the application dated July 30, 2007, as supplemented by letter dated December 5, 2007, available for public inspection at the Commission’s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System’s (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/ adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800–397–4209 or 301–415–4737, or by e-mail to pdr@nrc.gov. Dated at Rockville, Maryland this 3rd day of January 2008. For the Nuclear Regulatory Commission. Douglas V. Pickett, Senior Project Manager, Plant Licensing Branch I–1, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8–639 Filed 1–15–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–155 and 72–43] Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC; Big Rock Point; Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring and Opportunity for a Hearing The U.S. Nuclear Regulatory Commission (the Commission) is considering the issuance of an Order under 10 CFR 50.80 and 72.50 approving the indirect transfer of the Facility Operating License No. DPR–06 for Big Rock Point currently held by Entergy Nuclear Palisades, LLC, as owner and Entergy Nuclear Operations, Inc. as the licensed operator of Big Rock Point. E:\FR\FM\16JAN1.SGM 16JAN1

Agencies

[Federal Register Volume 73, Number 11 (Wednesday, January 16, 2008)]
[Notices]
[Pages 2955-2956]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-639]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-003, 50-247, and 50-286]


Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, 
LLC; Entergy Nuclear Indian Point 3, LLC; Indian Point Nuclear 
Generating Unit Nos. 1, 2, and 3; Notice of Consideration of Approval 
of Application Regarding Proposed Corporate Restructuring and 
Opportunity for a Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering the issuance of an Order under 10 CFR 50.80 approving the 
indirect transfer of the Facility Operating Licenses, which are 
numbered DPR-5, DPR-26, and DPR-64, for the Indian Point Nuclear 
Generating Unit Nos. 1, 2, and 3 currently held by Entergy Nuclear 
Indian Point 2, LLC (for Units 1 and 2) and Entergy Nuclear Indian 
Point 3, LLC (for Unit 3) as owners and Entergy Nuclear Operations, 
Inc. as the licensed operator of the Indian Point Nuclear Generating 
Unit Nos. 1, 2, and 3.
    According to an application for approval filed by Entergy Nuclear 
Operations, Inc. (ENOI) on behalf of itself and the owners, certain 
planned corporate restructuring transactions will involve the creation 
of new intermediary holding companies and/or changes in the 
intermediary holding companies within the ownership structure for the 
foregoing licensees. ENOI will continue to operate the facilities and 
Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, 
LLC will continue to own the facilities. There will be no direct 
transfer of the licenses. However, the corporate restructuring 
transaction will result in an indirect transfer of control of the 
licenses.
    No physical changes to the Indian Point Nuclear Generating Unit 
Nos. 1, 2, and 3 or operational changes are being proposed in the 
application.
    The Board of Directors of Entergy Corporation has proposed that the 
wholesale nuclear business segment be organized under a publicly owned 
holding company, referred to as ``NewCo,'' that will be the indirect 
parent company of Entergy Nuclear Indian Point 2, LLC, and Entergy 
Nuclear Indian Point 3, LLC.
    ENOI will be owned by a parent company referred to as ENOI 
Holdings, LLC, which, in turn, will be owned 50 percent by Entergy 
Corporation and 50 percent by NewCo. Each of these 50 percent interests 
will be held by wholly owned subsidiaries of Entergy Corporation and 
NewCo.
    ENOI will also be converted from a corporation to a limited 
liability company and its name will be changed to ENOI LLC. Under 
Delaware law, ENOI LLC will assume all of the rights and 
responsibilities of ENOI and it will be the same company (legal entity) 
both before and after the conversion and name change. ENOI will 
separately submit a request for license amendments to make the 
administrative changes as a result of ENOI's name change from ``Entergy 
Nuclear Operations, Inc.'' to ``ENOI LLC.''
    Pursuant to 10 CFR 50.80, no license, or any right thereunder, 
shall be transferred, directly or indirectly, through transfer of 
control of the license, unless the Commission shall give its consent in 
writing. The Commission will approve an application for the indirect 
transfer of a license, if the Commission determines that the proposed 
corporate restructuring will not affect the qualifications of the 
licensee to hold the license, and that the transfer is otherwise 
consistent with applicable provisions of law, regulations, and Orders 
issued by the Commission pursuant thereto.
    The filing of requests for hearing and petitions for leave to 
intervene, and written comments with regard to the license transfer 
application, are discussed below.
    Within 20 days from the date of publication of this notice, any 
person whose interest may be affected by the Commission's action on the 
application may request a hearing and, if not the applicant, may 
petition for leave to intervene in a hearing proceeding on the 
Commission's action. Requests for a hearing and petitions for leave to 
intervene should be filed in accordance with the Commission's rules of 
practice set forth in Subpart C ``Rules of General Applicability: 
Hearing Requests, Petitions to Intervene, Availability of Documents, 
Selection of Specific Hearing Procedures, Presiding Officer Powers, and 
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR 
part 2 and the NRC E-Filing rule discussed below. In particular, such 
requests and petitions must comply with the requirements set forth in 
10 CFR 2.309. Untimely requests and petitions may be denied, as 
provided in 10 CFR 2.309(c)(1), unless good cause for failure to file 
on time is established. In addition, an untimely request or petition 
should address the factors that the Commission will also consider, in 
reviewing untimely requests or petitions, set forth in 10 CFR 
2.309(c)(1)(I)-(viii). Those permitted to intervene become parties to 
the proceeding, subject to any limitations in the Order granting leave 
to intervene, and have the opportunity to participate fully in the 
conduct of the hearing. A request for hearing or a petition for leave 
to intervene must be filed in accordance with the NRC E-Filing rule, 
which the NRC promulgated in August, 2007, 72 FR 49139 (Aug. 28, 2007). 
The E-Filing process requires participants to submit and serve 
documents over the internet or in some cases to mail copies on 
electronic storage media. Participants may not submit paper copies of 
their filings unless they seek a waiver in accordance with the 
procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
five (5) days prior to the filing deadline, the petitioner/requestor 
must contact the Office of the Secretary by e-mail at 
HEARINGDOCKET@NRC.GOV, or by calling (301) 415-1677, to request (1) a 
digital ID certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and/or (2) 
creation of an electronic docket for the proceeding

[[Page 2956]]

(even in instances in which the petitioner/requestor (or its counsel or 
representative) already holds an NRC-issued digital ID certificate). 
Each petitioner/requestor will need to download the Workplace Forms 
Viewer TM to access the Electronic Information Exchange 
(EIE), a component of the E-Filing system. The Workplace Forms 
ViewerTM is free and is available at https://www.nrc.gov/
site-help/e-submittals/install-viewer.html. Information about applying 
for a digital ID certificate is available on NRC's public Web site at 
https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
    Once a petitioner/requestor has obtained a digital ID certificate, 
had a docket created, and downloaded the EIE viewer, it can then submit 
a request for hearing or petition for leave to intervene. Submissions 
should be in Portable Document Format (PDF) in accordance with NRC 
guidance available on the NRC public Web site at https://www.nrc.gov/
site-help/e-submittals.html. A filing is considered complete at the 
time the filer submits its documents through EIE. To be timely, an 
electronic filing must be submitted to the EIE system no later than 
11:59 p.m. Eastern Time on the due date. Upon receipt of a 
transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
EIE system also distributes an e-mail notice that provides access to 
the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically may seek assistance through the 
``Contact Us'' link located on the NRC Web site at https://www.nrc.gov/
site-help/e-submittals.html or by calling the NRC technical help line, 
which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, 
Monday through Friday. The help line number is (800) 397-4209 or 
locally, (301) 415-4737.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file a motion, in accordance 
with 10 CFR 2.302(g), with their initial paper filing requesting 
authorization to continue to submit documents in paper format. Such 
filings must be submitted by: (1) First class mail addressed to the 
Office of the Secretary of the Commission, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemaking and 
Adjudications Staff; or (2) courier, express mail, or expedited 
delivery service to the Office of the Secretary, Sixteenth Floor, One 
White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, 
Attention: Rulemaking and Adjudications Staff. Participants filing a 
document in this manner are responsible for serving the document on all 
other participants. Filing is considered complete by first-class mail 
as of the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service.
    Non-timely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission, the presiding 
officer, or the Atomic Safety and Licensing Board that the petition 
and/or request should be granted and/or the contentions should be 
admitted based on a balancing of the factors specified in 10 CFR 
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later 
than 11:59 p.m. Eastern Time on the due date.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant 
to an Order of the Commission, an Atomic Safety and Licensing Board, or 
a Presiding Officer. Participants are requested not to include personal 
privacy information, such as social security numbers, home addresses, 
or home phone numbers in their filings. With respect to copyrighted 
works, except for limited excerpts that serve the purpose of the 
adjudicatory filings and would constitute a Fair Use application, 
participants are requested not to include copyrighted materials in 
their works.
    The Commission will issue a notice or Order granting or denying a 
hearing request or intervention petition, designating the issues for 
any hearing that will be held and designating the Presiding Officer. A 
notice granting a hearing will be published in the Federal Register and 
served on the parties to the hearing.
    As an alternative to requests for hearing and petitions to 
intervene, within 30 days from the date of publication of this notice, 
persons may submit written comments regarding the license transfer 
application, as provided for in 10 CFR 2.1305. The Commission will 
consider and, if appropriate, respond to these comments, but such 
comments will not otherwise constitute part of the decisional record. 
Comments should be submitted to the Secretary, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, and should cite the publication date and page 
number of this Federal Register notice.
    For further details with respect to this action, see the 
application dated July 30, 2007, as supplemented by letter dated 
December 5, 2007, available for public inspection at the Commission's 
Public Document Room (PDR), located at One White Flint North, Public 
File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland. Publicly available records will be accessible electronically 
from the Agencywide Documents Access and Management System's (ADAMS) 
Public Electronic Reading Room on the Internet at the NRC Web site, 
https://www.nrc.gov/reading-rm/adams.html. Persons who do not have 
access to ADAMS or who encounter problems in accessing the documents 
located in ADAMS should contact the NRC PDR Reference staff by 
telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to 
pdr@nrc.gov.

    Dated at Rockville, Maryland this 3rd day of January 2008.

    For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing Branch I-1, Division of 
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
 [FR Doc. E8-639 Filed 1-15-08; 8:45 am]
BILLING CODE 7590-01-P