Sunshine Act Meeting Notice, 2477-2478 [E8-625]
Download as PDF
Federal Register / Vol. 73, No. 10 / Tuesday, January 15, 2008 / Notices
eight members: Professor J. Peter
Williamson on behalf of the Association
of Oil Pipelines, Mr. J. Bertram Solomon
on behalf of the American Public Gas
Association, Mr. Michael J. Vilbert on
behalf of the Interstate Natural Gas
Association of America, Mr. Park
Shaper and Mr. Yves Siegel on behalf of
the National Association of Publicly
Traded Partnerships, Mr. Patrick Barry
on behalf of the Public Service
Commission of New York, Mr. Thomas
Horst on behalf of the State of Alaska,
and Mr. Paul Moul on behalf of
TransCanada Corporation. As stated in
the November 15 Notice, the conference
is intended to be a working session
focused solely on the appropriate
growth component to be used in the
Commission’s Discounted Cash Flow
model for determining return on equity.
The agenda for the technical
conference is as follows:
1 to 1:15: Introductory Remarks by Staff.
1:15 to 2: Initial Comments by the Panel,
with each member limited to five
minutes.
2 to 3:15: Staff Directed Discussion with
the Panel.
3:15 to 3:30: Break.
3:30 to 4:45: Further questions to the
Panel from Staff and ‘‘open mike’’ for
questions to the Panel from other
attendees.
4:45 to 5: Next steps.
For further information about the
conference, please call or e-mail John
Robinson (202–502–8288;
john.robinson@ferc.gov).
Kimberly D. Bose,
Secretary.
[FR Doc. E8–514 Filed 1–14–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM01–8–000, Docket No. ER02–
2001–000]
Revised Public Utility Filing, Electric
Quarterly Reports; Notice of Electric
Quarterly Reports Technical
Conference
January 7, 2008.
rwilkins on PROD1PC63 with NOTICES
On September 24, 2007, the
Commission issued Order No. 2001–G,
VerDate Aug<31>2005
17:48 Jan 14, 2008
Jkt 214001
the Electric Quarterly Report (EQR) Data
Dictionary.1 The Commission issued an
order on rehearing, Order No. 2001–H,
on December 21, 2007. These orders
may be found at https://elibrary.ferc.gov.
The EQR Data Dictionary collects in one
document the definitions of certain
terms and values used in filing EQR
data. This notice announces a technical
conference regarding the changes
associated with the EQR Data
Dictionary. The technical conference
will be held Tuesday, February 26,
2008, in the Commission Meeting Room
at 888 First Street, NE., Washington, DC
and via teleconference. The conference
will run from 10 a.m. to 3 p.m. (EST).
During the technical conference,
Commission staff will review the EQR
Data Dictionary and address questions
from EQR users. An agenda will be
issued prior to the conference.
Members of the public interested in
raising questions about the EQR Data
Dictionary are invited to submit them in
writing in advance of the technical
conference via the eFiling link on the
Commission’s Web site at https://
www.ferc.gov by January 31, 2008.
Questions submitted should refer to
Docket Nos. RM01–8–000 and ER02–
2001–000. Questions submitted in
advance will be given priority and will
be addressed by Commission staff at the
technical conference.
All interested persons are invited to
participate in the technical conference
by attending in person or by dialing in.
Those interested in participating are
asked to register no later than February
12, 2008, on the FERC Web site at
https://www.ferc.gov/whats-new/
registration/eqr-02-26-form.asp. Please
indicate whether you will be attending
in person or plan to dial in. There is no
registration fee. Information and further
details about the technical conference
will be sent to registered participants.
For additional information, please
contact Christie Kim of FERC’s Office of
Enforcement at (202) 502–8216 or by
e-mail at eqr@ferc.gov.
FERC conferences and meetings are
accessible under section 508 of the
Rehabilitation Act of 1973. Requests for
accessibility accommodations should be
sent by e-mail to accessibility@ferc.gov
or by calling toll free (866) 208–3372
(voice), 202–502–8659 (TTY), or by
sending a fax to 202–208–2106.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–510 Filed 1–14–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
January 10, 2008.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
Agency Holding Meeting: Federal
Energy Regulatory Commission.
Date and Time: January 17, 2008, 10
a.m.
Place: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda.
*Note.—Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telehone
(202) 502–8400. For a recorded message
listing items struck from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
1 Revised Public Utility Filing Requirements for
Electric Quarterly Reports, Order No. 2001–G, 120
FERC ¶ 61,270 (Sep. 24, 2007), 72 FR 56735 (Oct.
4, 2007).
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
2477
E:\FR\FM\15JAN1.SGM
15JAN1
2478
Federal Register / Vol. 73, No. 10 / Tuesday, January 15, 2008 / Notices
928TH—MEETING
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ................................................
AD02–7–000 ................................................
AD06–3–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
Electric
E–1
E–2
E–3
E–4
........
........
........
........
E–5 ........
E–6 ........
E–7 ........
E–8 ........
E–9 ........
E–10 ......
E–11 ......
E–12
E–13
E–14
E–15
......
......
......
......
OMITTED.
RM06–22–000 .............................................
ER08–194–000 ............................................
ER01–2569–005 ..........................................
ER98–4652–005 ..........................................
ER02–1175–004 ..........................................
ER01–2568–004 ..........................................
EL07–41–001, ER07–583–003 ...................
OMITTED.
QM8–2–000 .................................................
ER04–157–021 ............................................
ER04–714–011 ............................................
EL05–89–001 ..............................................
OMITTED.
ER07–576–003 ............................................
ER00–2268–019, ER00–2268–023, EL05–
10–000.
ER99–4124–016, ER99–4124–020, EL05–
11–000.
EL05–12–000 ..............................................
ER99–4122–018, ER99–4122–024, EL05–
13–000.
ER07–428–001, ER07–428–002, EL07–
82–000.
EL08–10–000 ..............................................
OMITTED.
EL07–70–001 ..............................................
EL07–42–001 ..............................................
Mandatory Reliability Standards for Critical Infrastructure Protection.
Duquesne Light Company.
Boralex Livermore Falls LP.
Boralex Stratton Energy LP.
Boralex Ft. Fairfield LP.
Boralex Ashland LP.
Commonwealth Edison Company and Commonwealth Edison Company of Indiana,
Inc.
PECO Energy Company.
Bangor Hydro-Electric Company.
Florida Power and Light Company.
Maine Public Utilities Commission v. Central Maine Power Company.
Baltimore Gas and Electric Company.
Pinnacle West Capital Corporation.
Arizona Public Service Company.
Pinnacle West Energy Corporation.
APS Energy Services Company, Inc.
Pinnacle West Marketing and Trading Co., LLC.
Wisconsin Electric Power Company.
Hudson Transmission Partners, LLC vs. New York Independent System Operator, Inc.
Constellation Energy Commodities Group, Inc.
MISCELLANEOUS
M–1 ........
RM08–5–000 ...............................................
Revisions to Forms, Statements and Reporting Requirements for Electric Utilities and
Licensees.
HYDRO
H–1
H–2
H–3
H–4
........
........
........
........
P–2524–012 ................................................
P–2149–137 ................................................
P–12911–003 ..............................................
P–7267–045 ................................................
Grand River Dam Authority.
Public Utility District No. 1 of Douglas County, Washington.
The Electric Plant Board of the City of Paducah, Kentucky.
Joseph M. Keating.
CERTIFICATES
C–1 ........
RM06–7–003 ...............................................
rwilkins on PROD1PC63 with NOTICES
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
VerDate Aug<31>2005
17:48 Jan 14, 2008
Jkt 214001
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates.
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
not be telecast through the Capitol
Connection service.
[FR Doc. E8–625 Filed 1–14–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 73, Number 10 (Tuesday, January 15, 2008)]
[Notices]
[Pages 2477-2478]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-625]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
January 10, 2008.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: January 17, 2008, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda.
*Note.--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telehone (202) 502-8400. For a recorded message listing items struck
from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
[[Page 2478]]
928th--Meeting
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD02-1-000...................... Agency Administrative Matters.
A-2..................... AD02-7-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD06-3-000...................... Energy Market Update.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... OMITTED.........................
E-2..................... RM06-22-000..................... Mandatory Reliability Standards for Critical
Infrastructure Protection.
E-3..................... ER08-194-000.................... Duquesne Light Company.
E-4..................... ER01-2569-005................... Boralex Livermore Falls LP.
ER98-4652-005................... Boralex Stratton Energy LP.
ER02-1175-004................... Boralex Ft. Fairfield LP.
ER01-2568-004................... Boralex Ashland LP.
E-5..................... EL07-41-001, ER07-583-003....... Commonwealth Edison Company and Commonwealth Edison
Company of Indiana, Inc.
E-6..................... OMITTED.........................
E-7..................... QM8-2-000....................... PECO Energy Company.
E-8..................... ER04-157-021.................... Bangor Hydro-Electric Company.
ER04-714-011.................... Florida Power and Light Company.
EL05-89-001..................... Maine Public Utilities Commission v. Central Maine
Power Company.
E-9..................... OMITTED.........................
E-10.................... ER07-576-003.................... Baltimore Gas and Electric Company.
E-11.................... ER00-2268-019, ER00-2268-023, Pinnacle West Capital Corporation.
EL05-10-000.
ER99-4124-016, ER99-4124-020, Arizona Public Service Company.
EL05-11-000.
EL05-12-000..................... Pinnacle West Energy Corporation.
ER99-4122-018, ER99-4122-024, APS Energy Services Company, Inc.
EL05-13-000.
ER07-428-001, ER07-428-002, EL07- Pinnacle West Marketing and Trading Co., LLC.
82-000.
E-12.................... EL08-10-000..................... Wisconsin Electric Power Company.
E-13.................... OMITTED.........................
E-14.................... EL07-70-001..................... Hudson Transmission Partners, LLC vs. New York
Independent System Operator, Inc.
E-15.................... EL07-42-001..................... Constellation Energy Commodities Group, Inc.
----------------------------------------------------------------------------------------------------------------
MISCELLANEOUS
----------------------------------------------------------------------------------------------------------------
M-1..................... RM08-5-000...................... Revisions to Forms, Statements and Reporting
Requirements for Electric Utilities and Licensees.
----------------------------------------------------------------------------------------------------------------
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1..................... P-2524-012...................... Grand River Dam Authority.
H-2..................... P-2149-137...................... Public Utility District No. 1 of Douglas County,
Washington.
H-3..................... P-12911-003..................... The Electric Plant Board of the City of Paducah,
Kentucky.
H-4..................... P-7267-045...................... Joseph M. Keating.
----------------------------------------------------------------------------------------------------------------
CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1..................... RM06-7-003...................... Revisions to the Blanket Certificate Regulations and
Clarification Regarding Rates.
----------------------------------------------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. E8-625 Filed 1-14-08; 8:45 am]
BILLING CODE 6717-01-P