NRG Cedar Bayou Development Company, LLC; EnergyCo Cedar Bayou 4, LLC; Hackberry Wind, LLC; Smoky Hills Wind Farm, LLC; Cloud County Wind Farm, LLC; Pioneer Prairie Wind Farm I, LLC; Sagebrush Power Partners, LLC; Tatanka Wind Power, LLC; Snyder Wind Farm, LLC; FPL Energy Point Beach, LLC; Enbridge Gas New Brunswick Inc.; Enbridge Wind Power Inc.; Gazifere Inc.; Inuvik Gas Ltd.; NRGreen Power Limited Partnership; Wirebury Connections Inc.; Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 1869 [E8-240]
Download as PDF
yshivers on PROD1PC62 with NOTICES
Federal Register / Vol. 73, No. 7 / Thursday, January 10, 2008 / Notices
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY (202)
502–8659.
The estimated cost of constructing the
proposed facilities is $1,015,000.
Any questions regarding the
application should be directed to
Michael T. Loeffler, Senior Director of
Certificates and External Affairs, 1111
South 103rd Street, Omaha, Nebraska
68124, Northern Natural Gas Company,
phone (402) 398–7103.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–224 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
14:29 Jan 09, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EG07–80–000; EG07–81–000;
EG07–82–000; EG07–83–000; EG07–84–000;
EG07–85–000; EG07–86–000; EG07–87–000;
EG07–88–000; EG07–89–000; FC07–54–000;
FC07–55–000; FC07–56–000; FC07–57–000;
FC07–58–000; FC07–59–000]
NRG Cedar Bayou Development
Company, LLC; EnergyCo Cedar
Bayou 4, LLC; Hackberry Wind, LLC;
Smoky Hills Wind Farm, LLC; Cloud
County Wind Farm, LLC; Pioneer
Prairie Wind Farm I, LLC; Sagebrush
Power Partners, LLC; Tatanka Wind
Power, LLC; Snyder Wind Farm, LLC;
FPL Energy Point Beach, LLC;
Enbridge Gas New Brunswick Inc.;
Enbridge Wind Power Inc.; Gazifere
Inc.; Inuvik Gas Ltd.; NRGreen Power
Limited Partnership; Wirebury
Connections Inc.; Notice of
Effectiveness of Exempt Wholesale
Generator or Foreign Utility Company
Status
December 26, 2007.
Take notice that during the month of
November 2007, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E8–240 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–29–000]
Vector Pipeline L.P.; Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Athens
Compressor Expansion Project and
Request for Comments on
Environmental Issues
January 3, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Athens Compressor Expansion
Project involving construction and
operation of natural gas transmission
system facilities by Vector Pipeline L.P.
(Vector) in Calhoun and Oakland
County, Michigan and LaPorte County,
Indiana. The EA will be used by the
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
1869
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on February 4, 2008. Details on
how to submit comments are provided
in the Public Participation section of
this notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
Vector proposes to:
• Construct the Athens Compressor
Station, a new 15,000-horsepower
compressor station along Vector’s
existing pipeline system in Calhoun
County, Michigan; and
• Complete modifications at Vector’s
existing Springville and Highland
Compressor Stations, which are located
along Vector’s existing pipeline system
in LaPorte County, Indiana and Oakland
County, Michigan, respectively.
Vector purchased a 20-acre parcel of
land for construction of the Athens
Compressor Station. Approximately 6.3
acres within the site would be used for
operation of the compressor station. An
additional 2.2 acres of land would be
disturbed by construction of an access
road to Athens Compressor Station. The
remainder of the 20 acre site would be
maintained as a buffer area.
Construction of the proposed
modifications at the existing Springville
and Highland Compressor Stations
would disturb up to 2 acres of land at
each station. The land affected by
construction and operation of the
modifications would occur within
previously disturbed areas that are
inside buildings or in graveled areas
E:\FR\FM\10JAN1.SGM
10JAN1
Agencies
[Federal Register Volume 73, Number 7 (Thursday, January 10, 2008)]
[Notices]
[Page 1869]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-240]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EG07-80-000; EG07-81-000; EG07-82-000; EG07-83-000; EG07-
84-000; EG07-85-000; EG07-86-000; EG07-87-000; EG07-88-000; EG07-89-
000; FC07-54-000; FC07-55-000; FC07-56-000; FC07-57-000; FC07-58-000;
FC07-59-000]
NRG Cedar Bayou Development Company, LLC; EnergyCo Cedar Bayou 4,
LLC; Hackberry Wind, LLC; Smoky Hills Wind Farm, LLC; Cloud County Wind
Farm, LLC; Pioneer Prairie Wind Farm I, LLC; Sagebrush Power Partners,
LLC; Tatanka Wind Power, LLC; Snyder Wind Farm, LLC; FPL Energy Point
Beach, LLC; Enbridge Gas New Brunswick Inc.; Enbridge Wind Power Inc.;
Gazifere Inc.; Inuvik Gas Ltd.; NRGreen Power Limited Partnership;
Wirebury Connections Inc.; Notice of Effectiveness of Exempt Wholesale
Generator or Foreign Utility Company Status
December 26, 2007.
Take notice that during the month of November 2007, the status of
the above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E8-240 Filed 1-9-08; 8:45 am]
BILLING CODE 6717-01-P