The estimated cost of constructing the
proposed facilities is $1,015,000.
Any questions regarding the
application should be directed to
Michael T. Loeffler, Senior Director of
Certificates and External Affairs, 1111
South 103rd Street, Omaha, Nebraska
68124, Northern Natural Gas Company,
phone (402) 398–7103.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–224 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
14:29 Jan 09, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EG07–80–000; EG07–81–000;
EG07–82–000; EG07–83–000; EG07–84–000;
EG07–85–000; EG07–86–000; EG07–87–000;
EG07–88–000; EG07–89–000; FC07–54–000;
FC07–55–000; FC07–56–000; FC07–57–000;
FC07–58–000; FC07–59–000]
NRG Cedar Bayou Development
Company, LLC; EnergyCo Cedar
Bayou 4, LLC; Hackberry Wind, LLC;
Smoky Hills Wind Farm, LLC; Cloud
County Wind Farm, LLC; Pioneer
Prairie Wind Farm I, LLC; Sagebrush
Power Partners, LLC; Tatanka Wind
Power, LLC; Snyder Wind Farm, LLC;
FPL Energy Point Beach, LLC;
Enbridge Gas New Brunswick Inc.;
Enbridge Wind Power Inc.; Gazifere
Inc.; Inuvik Gas Ltd.; NRGreen Power
Limited Partnership; Wirebury
Connections Inc.; Notice of
Effectiveness of Exempt Wholesale
Generator or Foreign Utility Company
Status
December 26, 2007.
Take notice that during the month of
November 2007, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E8–240 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–29–000]
Vector Pipeline L.P.; Notice of Intent
To Prepare an Environmental
Assessment for the Proposed Athens
Compressor Expansion Project and
Request for Comments on
Environmental Issues
January 3, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Athens Compressor Expansion
Project involving construction and
operation of natural gas transmission
system facilities by Vector Pipeline L.P.
(Vector) in Calhoun and Oakland
County, Michigan and LaPorte County,
Indiana. The EA will be used by the
PO 00000
Frm 00008
Fmt 4703
Sfmt 4703
1869
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on February 4, 2008. Details on
how to submit comments are provided
in the Public Participation section of
this notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
Vector proposes to:
• Construct the Athens Compressor
Station, a new 15,000-horsepower
compressor station along Vector’s
existing pipeline system in Calhoun
County, Michigan; and
• Complete modifications at Vector’s
existing Springville and Highland
Compressor Stations, which are located
along Vector’s existing pipeline system
in LaPorte County, Indiana and Oakland
County, Michigan, respectively.
Vector purchased a 20-acre parcel of
land for construction of the Athens
Compressor Station. Approximately 6.3
acres within the site would be used for
operation of the compressor station. An
additional 2.2 acres of land would be
disturbed by construction of an access
road to Athens Compressor Station. The
remainder of the 20 acre site would be
maintained as a buffer area.
Construction of the proposed
modifications at the existing Springville
and Highland Compressor Stations
would disturb up to 2 acres of land at
each station. The land affected by
construction and operation of the
modifications would occur within
previously disturbed areas that are
inside buildings or in graveled areas
E:\FR\FM\10JAN1.SGM
10JAN1
1870
Federal Register / Vol. 73, No. 7 / Thursday, January 10, 2008 / Notices
within the existing fence lines of the
stations.
The general location of the proposed
facilities is shown in Appendix 1.1
yshivers on PROD1PC62 with NOTICES
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impact that could result
if it authorizes Vector’s proposal. By
this notice, we are also asking federal,
state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. Agencies that
would like to request cooperating status
should follow the instructions for filing
comments provided below.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, we are requesting
public comments on the scope of the
issues to address in the EA. All
comments received will be considered
during the preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils
• Land use and visual quality
• Cultural resources
• Vegetation and wildlife (including
threatened and endangered species)
• Air quality and noise
• Reliability and safety
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s
website at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room, 888 First
Street, NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the ‘‘Additional Information’’
section of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail. Requests for detailed maps of the proposed
facilities should be made directly to Vector.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
VerDate Aug<31>2005
14:29 Jan 09, 2008
Jkt 214001
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
received and considered, please
carefully follow the instructions in the
Public Participation section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal
and alternatives to the proposal,
including alternative compressor station
sites and measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 1, PJ–11.1;
• Reference Docket No. CP08–29–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before February 4, 2008.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the
‘‘eFiling’’ link and the link to the User’s
Guide. Prepare your submission in the
same manner as you would if filing on
paper and save it to a file on your hard
drive. Before you can file comments you
will need to create an account by
clicking on ‘‘Login to File’’ and then
‘‘New User Account.’’ You will be asked
to select the type of filing you are
making. This filing is considered a
‘‘Comment on Filing.’’
As described above, we may publish
and distribute the EA for comment. If
you are interested in receiving an EA for
review and/or comment, please return
the Environmental Mailing List Form
(Appendix 3). If you do not return the
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
Environmental Mailing List Form, you
will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding.
If you want to become an intervenor
you must file a motion to intervene
according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214) (see
Appendix 2).3 Only intervenors have
the right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
3 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
E:\FR\FM\10JAN1.SGM
10JAN1
Federal Register / Vol. 73, No. 7 / Thursday, January 10, 2008 / Notices
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–222 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER05–849–000]
California Independent System
Operator Corporation; Notice of
Extension of Time
December 27, 2007.
On December 26, 2007, the Western
Power Trading Forum (WPTF) filed a
request for an extension of time to file
an answer to the Public Utilities of the
State of California’s (CPUC) Motion to
Supplement Request for Rehearing or, in
the Alternative, to Supplement the
CPUC’s Response to the Motion For
Clarification of the California Generators
filed December 21, 2007, in the abovedocketed proceeding (December 21
Motion). WPTF states that because of
the intervening holidays and vacation
schedules involving WPTF counsel and
personnel, additional time is needed to
coordinate and prepare a responsive
filing.
Upon consideration, notice is hereby
given that an extension of time for filing
answers to the CPUC’s December 21
Motion is granted and including January
14, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–238 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
yshivers on PROD1PC62 with NOTICES
[ Docket Nos. ER08–25–000, ER08–25–001]
Ocean State Power, Ocean State Power
II; Notice of Issuance of Order
December 27, 2007.
Ocean State Power and Ocean State
Power II (collectively, Ocean State) filed
an application for market-based rate
VerDate Aug<31>2005
14:29 Jan 09, 2008
Jkt 214001
authority, with an accompanying rate
tariff. The proposed market-based rate
schedule provides for the sale of energy,
capacity and ancillary services at
market-based rates. Ocean State also
requested waivers of various
Commission regulations. In particular,
Ocean State requested that the
Commission grant blanket approval
under 18 CFR Part 34 of all future
issuances of securities and assumptions
of liability by Ocean State.
On December 18, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under Part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
Ocean State, should file a protest with
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is January 18,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Ocean State is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Ocean
State, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Ocean State’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
1871
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–237 Filed 1–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER08–200–000; ER08–200–
001]
Waterbury Generation, LLC; Notice of
Issuance of Order
December 27, 2007.
Waterbury Generation, LLC
(Waterbury) filed an application for
market-based rate authority, with an
accompanying market-based rate tariff.
The proposed market-based rate tariff
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Waterbury also requested waivers
of various Commission regulations. In
particular, Waterbury requested that the
Commission grant blanket approval
under 18 CFR Part 34 of all future
issuances of securities and assumptions
of liability by Waterbury.
On December 26, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under Part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
Waterbury, should file a protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2007).
Notice is hereby given that the
deadline for filing protests is January 28,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Waterbury is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Waterbury, compatible with the public
E:\FR\FM\10JAN1.SGM
10JAN1
Agencies
[Federal Register Volume 73, Number 7 (Thursday, January 10, 2008)]
[Notices]
[Pages 1869-1871]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-222]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-29-000]
Vector Pipeline L.P.; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Athens Compressor Expansion
Project and Request for Comments on Environmental Issues
January 3, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Athens Compressor Expansion
Project involving construction and operation of natural gas
transmission system facilities by Vector Pipeline L.P. (Vector) in
Calhoun and Oakland County, Michigan and LaPorte County, Indiana. The
EA will be used by the Commission in its decision-making process to
determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on February 4, 2008. Details on how to submit comments are
provided in the Public Participation section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
Vector proposes to:
Construct the Athens Compressor Station, a new 15,000-
horsepower compressor station along Vector's existing pipeline system
in Calhoun County, Michigan; and
Complete modifications at Vector's existing Springville
and Highland Compressor Stations, which are located along Vector's
existing pipeline system in LaPorte County, Indiana and Oakland County,
Michigan, respectively.
Vector purchased a 20-acre parcel of land for construction of the
Athens Compressor Station. Approximately 6.3 acres within the site
would be used for operation of the compressor station. An additional
2.2 acres of land would be disturbed by construction of an access road
to Athens Compressor Station. The remainder of the 20 acre site would
be maintained as a buffer area.
Construction of the proposed modifications at the existing
Springville and Highland Compressor Stations would disturb up to 2
acres of land at each station. The land affected by construction and
operation of the modifications would occur within previously disturbed
areas that are inside buildings or in graveled areas
[[Page 1870]]
within the existing fence lines of the stations.
The general location of the proposed facilities is shown in
Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's website at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary refer to the ``Additional Information''
section of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail. Requests for detailed maps
of the proposed facilities should be made directly to Vector.
---------------------------------------------------------------------------
The EA Process
We \2\ are preparing this EA to comply with the National
Environmental Policy Act (NEPA) which requires the Commission to take
into account the environmental impact that could result if it
authorizes Vector's proposal. By this notice, we are also asking
federal, state, and local agencies with jurisdiction and/or special
expertise with respect to environmental issues to formally cooperate
with us in the preparation of the EA. Agencies that would like to
request cooperating status should follow the instructions for filing
comments provided below.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
Notice of Intent, we are requesting public comments on the scope of the
issues to address in the EA. All comments received will be considered
during the preparation of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Land use and visual quality
Cultural resources
Vegetation and wildlife (including threatened and
endangered species)
Air quality and noise
Reliability and safety
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are received and considered, please
carefully follow the instructions in the Public Participation section
below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the proposal
and alternatives to the proposal, including alternative compressor
station sites and measures to avoid or lessen environmental impact. The
more specific your comments, the more useful they will be. Please
carefully follow these instructions to ensure that your comments are
received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas
Branch 1, PJ-11.1;
Reference Docket No. CP08-29-000; and
Mail your comments so that they will be received in
Washington, DC on or before February 4, 2008.
The Commission encourages electronic filing of comments. See 18
Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on
the Commission's Internet Web site at https://www.ferc.gov under the
``eFiling'' link and the link to the User's Guide. Prepare your
submission in the same manner as you would if filing on paper and save
it to a file on your hard drive. Before you can file comments you will
need to create an account by clicking on ``Login to File'' and then
``New User Account.'' You will be asked to select the type of filing
you are making. This filing is considered a ``Comment on Filing.''
As described above, we may publish and distribute the EA for
comment. If you are interested in receiving an EA for review and/or
comment, please return the Environmental Mailing List Form (Appendix
3). If you do not return the Environmental Mailing List Form, you will
be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor.'' Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding.
If you want to become an intervenor you must file a motion to
intervene according to Rule 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.214) (see Appendix 2).\3\ Only intervenors
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\3\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching
[[Page 1871]]
proceedings by automatically providing you with notification of these
filings, document summaries and direct links to the documents. Go to
https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-222 Filed 1-9-08; 8:45 am]
BILLING CODE 6717-01-P