Upper Peninsula Power Company; Notice of Application and Soliciting Comments, Motions To Intervene, and Protests, 1340-1341 [E8-71]
Download as PDF
1340
Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–72 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2402–108]
Upper Peninsula Power Company;
Notice of Application and Soliciting
Comments, Motions To Intervene, and
Protests
pwalker on PROD1PC71 with NOTICES
December 28, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Shoreline
Management Plan (SMP).
b. Project No.: 2402–108.
c. Date Filed: November 29, 2007.
d. Applicant: Upper Peninsula Power
Company (UPPCO).
e. Name of Project: Prickett
Hydroelectric Project.
f. Location: The project is located on
the Sturgeon River in Baraga and
Houghton Counties, Michigan, between
two areas of the Ottawa National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Shawn C.
Puzen, Environmental Consultant,
Integrys Business Support, LLC, 700
North Adams Street, P.O. Box 19001,
Green Bay, WI 54307–9001, (920) 433–
1094.
i. FERC Contact: Any questions on
this notice should be addressed to
Lesley Kordella at (202) 502–6406, or by
e-mail: lesley.kordella@ferc.gov.
j. Deadline for filing comments and/
or motions: January 29, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, DHAC, PJ–
12.1, 888 First Street, NE., Washington,
DC 20426. Please reference the project
number (p–2402–108) on any comments
or motions filed. Comments and
motions filed need to carefully specify
the appropriate project number in order
to avoid confusion with the SMP’s
concurrently filed by UPPCO for four
other projects (see item k below).
Comments, protests and interventions
VerDate Aug<31>2005
17:32 Jan 07, 2008
Jkt 214001
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
k. Description of Proposal: UPPCO
filed a proposed SMP for the Prickett
Project to address the land use pressures
and potential impacts anticipated from
the sale of adjacent non-project lands to
residential real estate developers. The
licensee is also requesting article 414
(comprehensive wildlife, land use, and
recreation management plan) of the
license be amended. SMP’s for the
Cataract Project (P–10854–080), the
Bond Falls Project (P–1864–083), the
Escanaba Project (P–2506–144), and the
Au Train Project (P–10856–061) were
filed concurrently with the SMP for the
Prickett Project, and are being noticed
separately by the Commission.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3676, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–74 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10854–080]
Upper Peninsula Power Company;
Notice of Application and Soliciting
Comments, Motions To Intervene, and
Protests
December 28, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Shoreline
Management Plan (SMP).
b. Project No.: 10854–080.
c. Date Filed: November 29, 2007.
d. Applicant: Upper Peninsula Power
Company (UPPCO).
e. Name of Project: Cataract
Hydroelectric Project.
f. Location: The project is located on
the Middle Branch of the Escanaba
River, in Marquette County, Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Shawn C.
Puzen, Environmental Consultant,
Integrys Business Support, LLC, 700
North Adams Street, P.O. Box 19001,
Green Bay, WI 54307–9001, (920) 433–
1094.
i. FERC Contact: Any questions on
this notice should be addressed to
Lesley Kordella at (202) 502–6406, or by
e-mail: Lesley.kordella@ferc.gov.
j. Deadline for filing comments and/
or motions: January 29, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, DHAC, PJ–
12.1, 888 First Street, NE., Washington,
DC 20426. Please reference the project
number (p–10854–080) on any
comments or motions filed. Comments
E:\FR\FM\08JAN1.SGM
08JAN1
pwalker on PROD1PC71 with NOTICES
Federal Register / Vol. 73, No. 5 / Tuesday, January 8, 2008 / Notices
and motions filed need to carefully
specify the appropriate project number
in order to avoid confusion with the
SMP’s concurrently filed by UPPCO for
four other projects (see item k below).
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
k. Description of Proposal: UPPCO
filed a proposed SMP for the Cataract
Project to address the land use pressures
and potential impacts anticipated from
the sale of adjacent non-project lands to
residential real estate developers. The
licensee is also requesting articles 410
(wildlife management plan), article 411
(land management plan), and 413
(recreation plan) of the license be
amended. SMP’s for the Au Train
Project (P–10856–061), the Bond Falls
Project (P–1864–083), the Escanaba
Project (P–2506–144), and the Prickett
Project (P–2402–108) were filed
concurrently with the SMP for the
Cataract Project, and are being noticed
separately by the Commission.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3676, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
VerDate Aug<31>2005
17:32 Jan 07, 2008
Jkt 214001
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–71 Filed 1–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1864–083]
Upper Peninsula Power Company;
Notice of Application and Soliciting
Comments, Motions To Intervene, and
Protests
December 28, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Shoreline
Management Plan (SMP).
b. Project No.: 1864–083.
c. Date Filed: November 29, 2007.
d. Applicant: Upper Peninsula Power
Company (UPPCO).
e. Name of Project: Bond Falls
Hydroelectric Project.
f. Location: The project is located on
the Ontonagon River in Ontonagon and
Gogebic Counties, Michigan, and Vilas
County, Wisconsin, and partially on
lands within the Ottawa National
Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Shawn C.
Puzen, Environmental Consultant,
Integrys Business Support, LLC, 700
North Adams Street, P.O. Box 19001,
Green Bay, WI 54307–9001, (920) 433–
1094.
i. FERC Contact: Any questions on
this notice should be addressed to
Lesley Kordella at (202) 502–6406, or by
e-mail: lesley.kordella@ferc.gov.
j. Deadline for filing comments and/
or motions: January 29, 2008.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
1341
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, DHAC, PJ–
12.1, 888 First Street, NE., Washington,
DC 20426. Please reference the project
number (P–1864–083) on any comments
or motions filed. Comments and
motions filed need to carefully specify
the appropriate project number in order
to avoid confusion with the SMP’s
concurrently filed by UPPCO for four
other projects (see item k below).
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
k. Description of Proposal: UPPCO
filed a proposed SMP for the Bond Falls
Project to address the land use pressures
and potential impacts anticipated from
the sale of adjacent non-project lands to
residential real estate developers. The
project includes the Bond Falls,
Bergland, Cisco, and Victoria
impoundments; the SMP applies only to
the Bond Falls and Victoria
impoundments. UPPCO is also
requesting articles 416 (recreation plan)
and 413 (buffer zone plan) of the license
be amended. SMP’s for the Au Train
Project (P–10856–061), the Cataract
Project (P–10854–080), the Escanaba
Project (P–2506–144), and the Prickett
Project (P–2402–108) were filed
concurrently with the SMP for the Bond
Falls Project, and are being noticed
separately by the Commission.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3676, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
E:\FR\FM\08JAN1.SGM
08JAN1
Agencies
[Federal Register Volume 73, Number 5 (Tuesday, January 8, 2008)]
[Notices]
[Pages 1340-1341]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-71]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10854-080]
Upper Peninsula Power Company; Notice of Application and
Soliciting Comments, Motions To Intervene, and Protests
December 28, 2007.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Shoreline Management Plan (SMP).
b. Project No.: 10854-080.
c. Date Filed: November 29, 2007.
d. Applicant: Upper Peninsula Power Company (UPPCO).
e. Name of Project: Cataract Hydroelectric Project.
f. Location: The project is located on the Middle Branch of the
Escanaba River, in Marquette County, Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Shawn C. Puzen, Environmental Consultant,
Integrys Business Support, LLC, 700 North Adams Street, P.O. Box 19001,
Green Bay, WI 54307-9001, (920) 433-1094.
i. FERC Contact: Any questions on this notice should be addressed
to Lesley Kordella at (202) 502-6406, or by e-mail:
Lesley.kordella@ferc.gov.
j. Deadline for filing comments and/or motions: January 29, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
DHAC, PJ-12.1, 888 First Street, NE., Washington, DC 20426. Please
reference the project number (p-10854-080) on any comments or motions
filed. Comments
[[Page 1341]]
and motions filed need to carefully specify the appropriate project
number in order to avoid confusion with the SMP's concurrently filed by
UPPCO for four other projects (see item k below). Comments, protests
and interventions may be filed electronically via the Internet in lieu
of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings.
k. Description of Proposal: UPPCO filed a proposed SMP for the
Cataract Project to address the land use pressures and potential
impacts anticipated from the sale of adjacent non-project lands to
residential real estate developers. The licensee is also requesting
articles 410 (wildlife management plan), article 411 (land management
plan), and 413 (recreation plan) of the license be amended. SMP's for
the Au Train Project (P-10856-061), the Bond Falls Project (P-1864-
083), the Escanaba Project (P-2506-144), and the Prickett Project (P-
2402-108) were filed concurrently with the SMP for the Cataract
Project, and are being noticed separately by the Commission.
l. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call toll-free 1-866-208-3676, or for
TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-71 Filed 1-7-08; 8:45 am]