Environmental Impacts Statements; Notice of Availability, 861 [E7-25638]
Download as PDF
Federal Register / Vol. 73, No. 3 / Friday, January 4, 2008 / Notices
Cumulative Effects Analysis and Best
Management Practices for water
conservation.
Dated: December 31, 2007.
Clifford Rader,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–25637 Filed 1–3–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6694–6]
jlentini on PROD1PC65 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 12/24/2007 Through 12/28/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070547, Draft Supplement,
COE, TX, Central City Project,
Proposed Modification to the
Authorized Projects which provides
Flood Damage Reduction, Habitat
Improvement, Recreation and Urban
Revitalization, Upper Trinity River
Central City, Upper Trinity River
Basin, Trinity River, TX, Comment
Period Ends: 02/19/2008, Contact: Saji
Alummuttil 817–886–1764.
EIS No. 20070548, Final EIS, NPS, CO,
Rocky Mountain National Park, Elk
and Vegetation Management Plan,
Implementation, Grand and Larimer
Counties, CO, Wait Period Ends: 02/
04/2008, Contact: Vaughn L. Baker
970–586–1206.
EIS No. 20070549, Final EIS, BLM, UT,
Chapita Wells-Stagecoach Area
Natural Gas Development, Drilling
and Production Operations of Natural
Gas Wells and Associated Access
Road, and Pipelines, Uintah County,
UT, Wait Period Ends: 02/04/2008,
Contact: Stephanie Howard 435–781–
4469.
EIS No. 20070550, Draft EIS, FHW, MN,
US–14 Reconstruction Project,
Improvement to Truck Highway 14
from Front Street in New Ulm to
Nicollet County Road 6 in North
Mankato Brown and Nicollet
Counties, MN, Comment Period Ends:
03/15/2008, Contact: Cheryl Martin
651–291–6120.
EIS No. 20070551, Final EIS, BLM, UT,
Greater Deadman Bench Oil and Gas
Producing Region, Proposes to
Develop Oil and Gas Resources, Rightof-Way Grants and Applications for
Permit to Drill, Vernal, Uintah
VerDate Aug<31>2005
16:42 Jan 03, 2008
Jkt 214001
County, UT, Wait Period Ends: 02/04/
2008, Contact: Stephanie Howard
435–781–4469.
EIS No. 20070552, Final EIS, FHW, MN,
Scott County State Aid Highway
(CSAH) 21 Project, Extension from
CSAH 42 in Prior Lake to CSAH 18 at
Southbridge Parkway in Shakopee,
U.S. Army COE Section 404 Permit,
Scott County, MN, Wait Period Ends:
02/04/2008, Contact: Cheryl Martin
651–291–6120.
EIS No. 20070553, Final EIS, BLM, WY,
Rawlins Field Office Planning Area
Resource Management Plan,
Addresses the Comprehensive
Analysis of Alternatives for the
Planning and Management of Public
Land and Resource Administered by
(BLM), Albany, Carbon, Laramie and
Sweetwater Counties, WY, Wait
Period Ends: 02/04/2008, Contact:
Ken Peacock 307–775–6113.
EIS No. 20070554, Final EIS, FRC, CO,
High Plains Expansion Project,
(Docket No. CP07–207–000) Natural
Gas Pipeline Facility, Construction
and Operation, U.S. Army COE 404,
Weld, Adams, and Morgan Counties,
CO, Wait Period Ends: 02/04/2008,
Contact: Andy Black 1–866–208–
3372.
EIS No. 20070555, Draft EIS, DHS, CA,
U.S. Border Patrol San Diego Sector,
Proposed Construction, Operation,
and Maintenance of Tactical
Infrastructure, San Diego County, CA,
Comment Period Ends: 02/19/2008,
Contact: Gregory Giddens 202–344–
2450.
EIS No. 20070556, Final EIS, NGB, MS,
Camp Shelby Joint Force Training
Center, Implementation of Installation
Mission Support Activities, Renewal
of Special Use Permit, De Soto
National Forest, in portions of Forrest,
George and Perry Counties, MS, Wait
Period Ends: 02/04/2008, Contact:
Alisa Dickson 703–607–9620.
EIS No. 20070557, Final EIS, IBW, TX,
PROGRAMMATIC—Rio Grande Flood
Control Projects, Proposing a Range of
Alternatives for Maintenance
Activities and Future Improvements,
along the Texas-Mexico Border, Wait
Period Ends: 02/04/2008, Contact:
Daniel Borunda 915–832–4767.
EIS No. 20070558, Final EIS, NPS, VA,
Great Falls Park General Management
Plan, Implementation, George
Washington Parkway, Fairfax County,
VA, Wait Period Ends: 2/04/2008,
Contact: David Vela 703–289–2500.
861
Action relative to Cooling
Alternatives and the Use of
Groundwater as Backup Water
Source, U.S. Army COE Section 10
and 404 Permits, Grant County, SD
and Big Stone County, MN , Comment
Period Ends: 02/28/2008, Contact:
Nancy Werdel 720–962–7251.
Revision of FR Notice Published 10/26/
2007: Extending Comment Period
from 12/10/2007 to 02/28/2008
EIS No. 20070484, Draft EIS, FHW, 00,
Interstate-94, I–43, I–894, and WI–119
(Airport Spur) I–94/USH 41
Interchange to Howard Avenue, To
Address Freeway System’s
Deteriorated Conditions, Funding and
U.S. Army COE Section 404 Permit,
Kenosha, Racine and Milwaukee
Counties, WI and Lake County, IL,
Comment Period Ends: 01/25/2008,
Contact: David Scott 608–829–7522.
Revision Notice Published on 11/16/
2007: Extending Comment Period
from 12/31/2007 to 01/25/2008
Dated: December 31, 2007.
Clifford Rader,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–25638 Filed 1–3–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–ORD–2007–1200; FRL–8513–3]
Board of Scientific Counselors,
Executive Committee Meeting—
January 2008
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
SUMMARY: Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, the Environmental Protection
Agency, Office of Research and
Development (ORD), gives notice of one
meeting of the Board of Scientific
Counselors (BOSC) Executive
Committee.
DATES: The meeting will be held on
Thursday, January 24, 2008, from 8:30
a.m. to 5 p.m., and will continue on
Friday, January 25, 2008, from 8:30 a.m.
until 12 noon. All times noted are
eastern time. The meeting may adjourn
early if all business is finished. Requests
for the draft agenda or for making oral
presentations at the meeting will be
accepted up to 1 business day before the
Amended Notices
meeting.
EIS No. 20070450, Draft Supplement,
ADDRESSES: The meeting will be held at
WAP, 00, Big Stone II Power Plant and the Renaissance M Street Hotel, 1143
Transmission Project, Addresses the
New Hampshire Avenue, NW.,
Impacts of Changes to the Proposed
Washington, DC 20037, Tel: (202) 775–
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\04JAN1.SGM
04JAN1
Agencies
[Federal Register Volume 73, Number 3 (Friday, January 4, 2008)]
[Notices]
[Page 861]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-25638]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6694-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 12/24/2007 Through 12/28/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070547, Draft Supplement, COE, TX, Central City Project,
Proposed Modification to the Authorized Projects which provides Flood
Damage Reduction, Habitat Improvement, Recreation and Urban
Revitalization, Upper Trinity River Central City, Upper Trinity River
Basin, Trinity River, TX, Comment Period Ends: 02/19/2008, Contact:
Saji Alummuttil 817-886-1764.
EIS No. 20070548, Final EIS, NPS, CO, Rocky Mountain National Park, Elk
and Vegetation Management Plan, Implementation, Grand and Larimer
Counties, CO, Wait Period Ends: 02/04/2008, Contact: Vaughn L. Baker
970-586-1206.
EIS No. 20070549, Final EIS, BLM, UT, Chapita Wells-Stagecoach Area
Natural Gas Development, Drilling and Production Operations of Natural
Gas Wells and Associated Access Road, and Pipelines, Uintah County, UT,
Wait Period Ends: 02/04/2008, Contact: Stephanie Howard 435-781-4469.
EIS No. 20070550, Draft EIS, FHW, MN, US-14 Reconstruction Project,
Improvement to Truck Highway 14 from Front Street in New Ulm to
Nicollet County Road 6 in North Mankato Brown and Nicollet Counties,
MN, Comment Period Ends: 03/15/2008, Contact: Cheryl Martin 651-291-
6120.
EIS No. 20070551, Final EIS, BLM, UT, Greater Deadman Bench Oil and Gas
Producing Region, Proposes to Develop Oil and Gas Resources, Right-of-
Way Grants and Applications for Permit to Drill, Vernal, Uintah County,
UT, Wait Period Ends: 02/04/2008, Contact: Stephanie Howard 435-781-
4469.
EIS No. 20070552, Final EIS, FHW, MN, Scott County State Aid Highway
(CSAH) 21 Project, Extension from CSAH 42 in Prior Lake to CSAH 18 at
Southbridge Parkway in Shakopee, U.S. Army COE Section 404 Permit,
Scott County, MN, Wait Period Ends: 02/04/2008, Contact: Cheryl Martin
651-291-6120.
EIS No. 20070553, Final EIS, BLM, WY, Rawlins Field Office Planning
Area Resource Management Plan, Addresses the Comprehensive Analysis of
Alternatives for the Planning and Management of Public Land and
Resource Administered by (BLM), Albany, Carbon, Laramie and Sweetwater
Counties, WY, Wait Period Ends: 02/04/2008, Contact: Ken Peacock 307-
775-6113.
EIS No. 20070554, Final EIS, FRC, CO, High Plains Expansion Project,
(Docket No. CP07-207-000) Natural Gas Pipeline Facility, Construction
and Operation, U.S. Army COE 404, Weld, Adams, and Morgan Counties, CO,
Wait Period Ends: 02/04/2008, Contact: Andy Black 1-866-208-3372.
EIS No. 20070555, Draft EIS, DHS, CA, U.S. Border Patrol San Diego
Sector, Proposed Construction, Operation, and Maintenance of Tactical
Infrastructure, San Diego County, CA, Comment Period Ends: 02/19/2008,
Contact: Gregory Giddens 202-344-2450.
EIS No. 20070556, Final EIS, NGB, MS, Camp Shelby Joint Force Training
Center, Implementation of Installation Mission Support Activities,
Renewal of Special Use Permit, De Soto National Forest, in portions of
Forrest, George and Perry Counties, MS, Wait Period Ends: 02/04/2008,
Contact: Alisa Dickson 703-607-9620.
EIS No. 20070557, Final EIS, IBW, TX, PROGRAMMATIC--Rio Grande Flood
Control Projects, Proposing a Range of Alternatives for Maintenance
Activities and Future Improvements, along the Texas-Mexico Border, Wait
Period Ends: 02/04/2008, Contact: Daniel Borunda 915-832-4767.
EIS No. 20070558, Final EIS, NPS, VA, Great Falls Park General
Management Plan, Implementation, George Washington Parkway, Fairfax
County, VA, Wait Period Ends: 2/04/2008, Contact: David Vela 703-289-
2500.
Amended Notices
EIS No. 20070450, Draft Supplement, WAP, 00, Big Stone II Power Plant
and Transmission Project, Addresses the Impacts of Changes to the
Proposed Action relative to Cooling Alternatives and the Use of
Groundwater as Backup Water Source, U.S. Army COE Section 10 and 404
Permits, Grant County, SD and Big Stone County, MN , Comment Period
Ends: 02/28/2008, Contact: Nancy Werdel 720-962-7251.
Revision of FR Notice Published 10/26/2007: Extending Comment Period
from 12/10/2007 to 02/28/2008
EIS No. 20070484, Draft EIS, FHW, 00, Interstate-94, I-43, I-894, and
WI-119 (Airport Spur) I-94/USH 41 Interchange to Howard Avenue, To
Address Freeway System's Deteriorated Conditions, Funding and U.S. Army
COE Section 404 Permit, Kenosha, Racine and Milwaukee Counties, WI and
Lake County, IL, Comment Period Ends: 01/25/2008, Contact: David Scott
608-829-7522.
Revision Notice Published on 11/16/2007: Extending Comment Period from
12/31/2007 to 01/25/2008
Dated: December 31, 2007.
Clifford Rader,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-25638 Filed 1-3-08; 8:45 am]
BILLING CODE 6560-50-P