SBER Royal Mills, LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing a Deadline for Submission of Final Amendments, 74281 [E7-25326]

Download as PDF Federal Register / Vol. 72, No. 249 / Monday, December 31, 2007 / Notices about 17.03 acres of federal lands within the Wasatch Cache National Forest. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Please contact Gaylord Hoisington by telephone at (202) 502–6032 or by email at gaylord.hoisington@ferc.gov if you have any questions. Kimberly D. Bose, Secretary. [FR Doc. E7–25324 Filed 12–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12557–001] SBER Royal Mills, LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing a Deadline for Submission of Final Amendments sroberts on PROD1PC70 with NOTICES December 19, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption From Licensing. b. Project No.: P–12557–001. c. Date Filed: December 12, 2007. d. Applicant: SBER Royal Mills, LLC. e. Name of Project: Royal Mills Hydroelectric Project. f. Location: On the South Branch Pawtuxet River, in the town of West VerDate Aug<31>2005 20:08 Dec 28, 2007 Jkt 214001 Warwick, Kent County, Rhode Island. This project does not occupy federal lands. g. Filed Pursuant to: Public Utilities Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Quentin Chafee, Development Director, Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M, Suite 103, Providence, RI 02909, (401) 574–2100, Q.Chafee@sber.com. i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202) 502– 6131. j. Cooperating Agencies: We are asking Federal, State, and local agencies and Indian tribes with jurisdiction and/ or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in item l below. k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian tribe, or person believes that an additional scientific study should be conducted in order to form a factual basis for complete analysis of the application on its merits, the resource agency, Indian tribe, or person must file a request for the study with the Commission no later than 60 days from the application filing date, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: February 11, 2008. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Additional study requests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filing. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘eFiling’’ link. After logging into the eFiling system, select ‘‘Comment on Filing’’ from the Filing Type Selection screen and continue with the filing process.’’ m. The application is not ready for environmental analysis at this time. n. Project Description: The Royal Mills Hydroelectric Project would consist of the following facilities: (1) an existing 110-foot-long by 21-foot-high granite block dam; (2) the existing 3.8acre reservoir, (3) an existing 150-footlong by 40-foot-wide power canal; (4) an existing powerhouse containing one single new cross-flow turbine generating unit with total installed generating PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 74281 capacity of 225 kilowatts (kW); and (5) appurtenant facilities. The restored project would have an estimated average annual generation of 1,000,000 kilowatthours. The dam and existing project facilities are owned by the applicant. o. A copy of the application is on file with the Commission and is available for public inspection. This filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number filed to access the documents. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676 or for TTY, contact (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. p. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. q. With this notice, we are initiating consultation with the RHODE ISLAND HISTORIC PRESERVATION OFFICER (SHPO), as required by § 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. r. Final amendments: Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E7–25326 Filed 12–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2197–073—North Carolina; Yadkin Hydroelectric Project] Alcoa Power Generating, Inc.; Notice of Proposed Restricted Service List for a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the National Register of Historic Places December 20, 2007. Rule 2010 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure provides that, to eliminate unnecessary expense or improve administrative E:\FR\FM\31DEN1.SGM 31DEN1

Agencies

[Federal Register Volume 72, Number 249 (Monday, December 31, 2007)]
[Notices]
[Page 74281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-25326]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12557-001]


SBER Royal Mills, LLC; Notice of Application Tendered for Filing 
With the Commission, Soliciting Additional Study Requests, and 
Establishing a Deadline for Submission of Final Amendments

December 19, 2007.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption From Licensing.
    b. Project No.: P-12557-001.
    c. Date Filed: December 12, 2007.
    d. Applicant: SBER Royal Mills, LLC.
    e. Name of Project: Royal Mills Hydroelectric Project.
    f. Location: On the South Branch Pawtuxet River, in the town of 
West Warwick, Kent County, Rhode Island. This project does not occupy 
federal lands.
    g. Filed Pursuant to: Public Utilities Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Quentin Chafee, Development Director, 
Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M, 
Suite 103, Providence, RI 02909, (401) 574-2100, Q.Chafee@sber.com.
    i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202) 
502-6131.
    j. Cooperating Agencies: We are asking Federal, State, and local 
agencies and Indian tribes with jurisdiction and/or special expertise 
with respect to environmental issues to cooperate with us in the 
preparation of the environmental document. Agencies who would like to 
request cooperating status should follow the instructions for filing 
comments described in item l below.
    k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian tribe, or person believes 
that an additional scientific study should be conducted in order to 
form a factual basis for complete analysis of the application on its 
merits, the resource agency, Indian tribe, or person must file a 
request for the study with the Commission no later than 60 days from 
the application filing date, and serve a copy of the request on the 
applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: February 11, 2008.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426.
    Additional study requests may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filing. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the 
``eFiling'' link. After logging into the eFiling system, select 
``Comment on Filing'' from the Filing Type Selection screen and 
continue with the filing process.''
    m. The application is not ready for environmental analysis at this 
time.
    n. Project Description: The Royal Mills Hydroelectric Project would 
consist of the following facilities: (1) an existing 110-foot-long by 
21-foot-high granite block dam; (2) the existing 3.8-acre reservoir, 
(3) an existing 150-foot-long by 40-foot-wide power canal; (4) an 
existing powerhouse containing one single new cross-flow turbine 
generating unit with total installed generating capacity of 225 
kilowatts (kW); and (5) appurtenant facilities. The restored project 
would have an estimated average annual generation of 1,000,000 
kilowatt-hours. The dam and existing project facilities are owned by 
the applicant.
    o. A copy of the application is on file with the Commission and is 
available for public inspection. This filing may also be viewed on the 
Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits in the docket number 
filed to access the documents. For assistance, please contact FERC 
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676 or for TTY, contact (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    p. You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    q. With this notice, we are initiating consultation with the RHODE 
ISLAND HISTORIC PRESERVATION OFFICER (SHPO), as required by Sec.  106, 
National Historic Preservation Act, and the regulations of the Advisory 
Council on Historic Preservation, 36 CFR 800.4.
    r. Final amendments:
    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-25326 Filed 12-28-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.