SBER Royal Mills, LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing a Deadline for Submission of Final Amendments, 74281 [E7-25326]
Download as PDF
Federal Register / Vol. 72, No. 249 / Monday, December 31, 2007 / Notices
about 17.03 acres of federal lands within
the Wasatch Cache National Forest.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Please contact Gaylord Hoisington by
telephone at (202) 502–6032 or by email at gaylord.hoisington@ferc.gov if
you have any questions.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–25324 Filed 12–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12557–001]
SBER Royal Mills, LLC; Notice of
Application Tendered for Filing With
the Commission, Soliciting Additional
Study Requests, and Establishing a
Deadline for Submission of Final
Amendments
sroberts on PROD1PC70 with NOTICES
December 19, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–12557–001.
c. Date Filed: December 12, 2007.
d. Applicant: SBER Royal Mills, LLC.
e. Name of Project: Royal Mills
Hydroelectric Project.
f. Location: On the South Branch
Pawtuxet River, in the town of West
VerDate Aug<31>2005
20:08 Dec 28, 2007
Jkt 214001
Warwick, Kent County, Rhode Island.
This project does not occupy federal
lands.
g. Filed Pursuant to: Public Utilities
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Quentin Chafee,
Development Director, Struever Bros.
Eccles & Rouse, Inc., 166 Valley Street,
Building 6M, Suite 103, Providence, RI
02909, (401) 574–2100,
Q.Chafee@sber.com.
i. FERC Contact: Steve Kartalia,
Stephen.Kartalia@ferc.gov, (202) 502–
6131.
j. Cooperating Agencies: We are
asking Federal, State, and local agencies
and Indian tribes with jurisdiction and/
or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in item l below.
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian tribe, or
person believes that an additional
scientific study should be conducted in
order to form a factual basis for
complete analysis of the application on
its merits, the resource agency, Indian
tribe, or person must file a request for
the study with the Commission no later
than 60 days from the application filing
date, and serve a copy of the request on
the applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 11, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
Additional study requests may be
filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filing. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘eFiling’’ link.
After logging into the eFiling system,
select ‘‘Comment on Filing’’ from the
Filing Type Selection screen and
continue with the filing process.’’
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The Royal
Mills Hydroelectric Project would
consist of the following facilities: (1) an
existing 110-foot-long by 21-foot-high
granite block dam; (2) the existing 3.8acre reservoir, (3) an existing 150-footlong by 40-foot-wide power canal; (4) an
existing powerhouse containing one
single new cross-flow turbine generating
unit with total installed generating
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
74281
capacity of 225 kilowatts (kW); and (5)
appurtenant facilities. The restored
project would have an estimated average
annual generation of 1,000,000 kilowatthours. The dam and existing project
facilities are owned by the applicant.
o. A copy of the application is on file
with the Commission and is available
for public inspection. This filing may
also be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
filed to access the documents. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676 or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
p. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. With this notice, we are initiating
consultation with the RHODE ISLAND
HISTORIC PRESERVATION OFFICER
(SHPO), as required by § 106, National
Historic Preservation Act, and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
r. Final amendments:
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–25326 Filed 12–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–073—North Carolina;
Yadkin Hydroelectric Project]
Alcoa Power Generating, Inc.; Notice
of Proposed Restricted Service List for
a Programmatic Agreement for
Managing Properties Included in or
Eligible for Inclusion in the National
Register of Historic Places
December 20, 2007.
Rule 2010 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure
provides that, to eliminate unnecessary
expense or improve administrative
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 72, Number 249 (Monday, December 31, 2007)]
[Notices]
[Page 74281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-25326]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12557-001]
SBER Royal Mills, LLC; Notice of Application Tendered for Filing
With the Commission, Soliciting Additional Study Requests, and
Establishing a Deadline for Submission of Final Amendments
December 19, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-12557-001.
c. Date Filed: December 12, 2007.
d. Applicant: SBER Royal Mills, LLC.
e. Name of Project: Royal Mills Hydroelectric Project.
f. Location: On the South Branch Pawtuxet River, in the town of
West Warwick, Kent County, Rhode Island. This project does not occupy
federal lands.
g. Filed Pursuant to: Public Utilities Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Quentin Chafee, Development Director,
Struever Bros. Eccles & Rouse, Inc., 166 Valley Street, Building 6M,
Suite 103, Providence, RI 02909, (401) 574-2100, Q.Chafee@sber.com.
i. FERC Contact: Steve Kartalia, Stephen.Kartalia@ferc.gov, (202)
502-6131.
j. Cooperating Agencies: We are asking Federal, State, and local
agencies and Indian tribes with jurisdiction and/or special expertise
with respect to environmental issues to cooperate with us in the
preparation of the environmental document. Agencies who would like to
request cooperating status should follow the instructions for filing
comments described in item l below.
k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian tribe, or person believes
that an additional scientific study should be conducted in order to
form a factual basis for complete analysis of the application on its
merits, the resource agency, Indian tribe, or person must file a
request for the study with the Commission no later than 60 days from
the application filing date, and serve a copy of the request on the
applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: February 11, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
Additional study requests may be filed electronically via the
Internet in lieu of paper. The Commission strongly encourages
electronic filing. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the
``eFiling'' link. After logging into the eFiling system, select
``Comment on Filing'' from the Filing Type Selection screen and
continue with the filing process.''
m. The application is not ready for environmental analysis at this
time.
n. Project Description: The Royal Mills Hydroelectric Project would
consist of the following facilities: (1) an existing 110-foot-long by
21-foot-high granite block dam; (2) the existing 3.8-acre reservoir,
(3) an existing 150-foot-long by 40-foot-wide power canal; (4) an
existing powerhouse containing one single new cross-flow turbine
generating unit with total installed generating capacity of 225
kilowatts (kW); and (5) appurtenant facilities. The restored project
would have an estimated average annual generation of 1,000,000
kilowatt-hours. The dam and existing project facilities are owned by
the applicant.
o. A copy of the application is on file with the Commission and is
available for public inspection. This filing may also be viewed on the
Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number, excluding the last three digits in the docket number
filed to access the documents. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676 or for TTY, contact (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
p. You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
q. With this notice, we are initiating consultation with the RHODE
ISLAND HISTORIC PRESERVATION OFFICER (SHPO), as required by Sec. 106,
National Historic Preservation Act, and the regulations of the Advisory
Council on Historic Preservation, 36 CFR 800.4.
r. Final amendments:
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-25326 Filed 12-28-07; 8:45 am]
BILLING CODE 6717-01-P