BPUS Generation Development, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 72703-72704 [E7-24765]
Download as PDF
Federal Register / Vol. 72, No. 245 / Friday, December 21, 2007 / Notices
comment date for the particular
application.
r. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–24764 Filed 12–20–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13057–000]
BPUS Generation Development, LLC;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
mstockstill on PROD1PC66 with NOTICES
December 14, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13057–000.
c. Date Filed: November 5, 2007.
d. Applicant: BPUS Generation
Development, LLC.
e. Name of Project: Taylorsville Lake
Dam Hydroelectric Project.
VerDate Aug<31>2005
18:37 Dec 20, 2007
Jkt 214001
f. Location: The project would be
located on the Salt River in Spencer
County, Kentucky. It would use the U.S.
Army Corps of Engineers’ Taylorsville
Lake Dam.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Mr. Jeffrey M.
Auser, P.E., BPUS Generation
Development LLC, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088, (315) 413–2700, and Mr. John A.
Whittaker, IV, Winston & Strawn, LLP,
1700 K Street, NW., Washington, DC
20006–3817, (202) 282–5766.
i. FERC Contact: Kelly Houff, (202)
502–6393.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–13057–000) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would use the U.S.
Army Corps of Engineers’ Taylorsville
Lake Dam and would consist of: (1) A
proposed forebay and intake structure
located upstream of the eastern
abutment of the dam; (2) a proposed
steel lined power tunnel; (3) a proposed
powerhouse, containing two turbine/
generator units with a total installed
capacity of 16.9 megawatts; (4) a tailrace
channel; (5) a new 2.26-mile-long 12.5
to 230 kV transmission line and, (6)
appurtenant facilities. The proposed
project would have an average annual
generation of 23.3 gigawatt-hours,
which would be sold to a local utility.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
72703
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
E:\FR\FM\21DEN1.SGM
21DEN1
72704
Federal Register / Vol. 72, No. 245 / Friday, December 21, 2007 / Notices
mstockstill on PROD1PC66 with NOTICES
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–24765 Filed 12–20–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:37 Dec 20, 2007
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2576–083]
Northeast Generation Company;
Notice of Application and Soliciting
Comments
December 14, 2007.
Take notice that Commission staff is
providing an additional opportunity for
public input into the pending
proceeding before the Commission on
the following application:
a. Application Type: Shoreline
Management Plan.
b. Project No: 2576–083.
c. Date Filed: July 27, 2006.
d. Applicant: Northeast Generation
Company (NGC).
e. Name of Project: Housatonic River
Hydroelectric Project.
f. Location: The project is located on
the Housatonic River, in Fairfield,
Litchfield and New Haven Counties,
Connecticut.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Robert
Gates, Station Manager—Connecticut
Hydro, 143 West St., Ext. Suite E , New
Milford, CT 06776, (860) 350–66987
i. FERC Contact: Any questions on
this notice should be addressed to Isis
Johnson at (202) 502–6346, or by e-mail:
Isis.Johnson@ferc.gov.
j. Deadline for filing comments and
/or motions: January 17, 2008.
As indicated by Commission staff at
the public meeting held September 24,
2007, regarding the shoreline
management plan for the Housatonic
Project, an opportunity will be provided
for those members of the public that did
not have the opportunity to provide
comments. This notice is intended to
grant those parties, particularly those
residents around Squantz Pond, the
opportunity to provide comments on the
proposed shoreline management plan
filed with the Commission. All
comments that have been filed with the
Commission in this proceeding are still
applicable, so re-filing of comments is
not necessary.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, DHAC, PJ–
12.1, 888 First Street, NE., Washington
DC 20426. Please include the project
number (2576–083) on any filed
comments. Comments may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘e-
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Filing’’ link. The Commission strongly
encourages electronic filings.
k. Description of Proposal: NGC,
licensee for the Housatonic River
Project, submitted a Shoreline
Management Plan (SMP) as required by
the project license. The proposed SMP
provides for the maintenance of safe
public access to lake shorelines and
riverfront lands and waters, as well as
for the stewardship and development of
shoreline/riverfront areas. The SMP also
contains provisions to promote the
conservation of land and water-related
resources, in addition to promoting
education and public awareness of
resource protection and management
programs. The SMP also includes
guidelines for permitting new and
existing structures on project lands, and
a fee schedule to recover the
administrative costs of implementing
the permitting program.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at www.ferc.gov
using the ‘‘eLibrary’’ link. Enter the
docket number excluding the last three
digits in the docket number field to
access the document. For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3676, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
as applicable, and the Project Number of
the particular application to which the
filing refers.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–24766 Filed 12–20–07; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2007–0670; FRL–8344–8]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; TSCA Section 8(a)
Preliminary Assessment Information
Rule (PAIR); EPA ICR No. 0586.11,
OMB Control No. 2070–0054
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (PRA) (44
E:\FR\FM\21DEN1.SGM
21DEN1
Agencies
[Federal Register Volume 72, Number 245 (Friday, December 21, 2007)]
[Notices]
[Pages 72703-72704]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-24765]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13057-000]
BPUS Generation Development, LLC; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene, Protests, and Comments
December 14, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 13057-000.
c. Date Filed: November 5, 2007.
d. Applicant: BPUS Generation Development, LLC.
e. Name of Project: Taylorsville Lake Dam Hydroelectric Project.
f. Location: The project would be located on the Salt River in
Spencer County, Kentucky. It would use the U.S. Army Corps of
Engineers' Taylorsville Lake Dam.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
h. Applicant Contact: Mr. Jeffrey M. Auser, P.E., BPUS Generation
Development LLC, 225 Greenfield Parkway, Suite 201, Liverpool, NY
13088, (315) 413-2700, and Mr. John A. Whittaker, IV, Winston & Strawn,
LLP, 1700 K Street, NW., Washington, DC 20006-3817, (202) 282-5766.
i. FERC Contact: Kelly Houff, (202) 502-6393.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and interventions may be
filed electronically via the Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings. Please include the project number (P-13057-000) on
any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would use the U.S.
Army Corps of Engineers' Taylorsville Lake Dam and would consist of:
(1) A proposed forebay and intake structure located upstream of the
eastern abutment of the dam; (2) a proposed steel lined power tunnel;
(3) a proposed powerhouse, containing two turbine/generator units with
a total installed capacity of 16.9 megawatts; (4) a tailrace channel;
(5) a new 2.26-mile-long 12.5 to 230 kV transmission line and, (6)
appurtenant facilities. The proposed project would have an average
annual generation of 23.3 gigawatt-hours, which would be sold to a
local utility.
l. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
e-mail FERCONLINESUPPORT@FERC.GOV. For TTY, call (202) 502-8659. A copy
is also available for inspection and reproduction at the address in
item h above.
m. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
n. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
o. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies Under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation
[[Page 72704]]
of a development application to construct and operate the project.
q. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
r. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Federal Energy Regulatory Commission, at the above-mentioned address. A
copy of any notice of intent, competing application or motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-24765 Filed 12-20-07; 8:45 am]
BILLING CODE 6717-01-P