Notice of Quarterly Report (July 1, 2007-September 30, 2007), 71966-71972 [E7-24634]

Download as PDF 71966 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices or applicant because of disclosure of information by that individual that is reasonably believed to evidence violations of law, rule or regulation; gross mismanagement; gross waste of funds; an abuse of authority; or a substantial and specific danger to public health or safety, unless disclosure of such information is specifically prohibited by law and such information is specifically required by Executive order to be kept secret in the interest of national defense or the conduct of foreign affairs. Retaliation against an employee or applicant for making a protected disclosure is prohibited by 5 U.S.C. 2302(b)(8). If you believe that you have been the victim of whistleblower retaliation, you may file a written complaint (Form OSC–11) with the U.S. Office of Special Counsel at 1730 M Street, NW., Suite 218, Washington, DC 20036–4505 or online through the OSC Web site—https://www.osc.gov. Retaliation for Engaging in Protected Activity MCC cannot retaliate against an employee or applicant for employment because that individual exercises his or her rights under any of the Federal antidiscrimination or whistleblower protection laws listed above. If you believe that you are the victim of retaliation for engaging in protected activity, you must follow, as appropriate, the procedures described in the Antidiscrimination Laws and Whistleblower Protection Laws sections of this notice. Disciplinary Actions Under the existing laws, MCC retains the right, where appropriate, to discipline an employee for conduct that is inconsistent with Federal Antidiscrimination and Whistleblower Protection Laws up to and including removal. If OSC has initiated an investigation under 5 U.S.C. 1214, however, according to 5 U.S.C. 1214(f), MCC must seek approval from the Special Counsel to discipline employees for, among other activities, engaging in prohibited retaliation. Nothing in the No FEAR Act alters existing laws or permits MCC to take unfounded disciplinary action against a Federal employee or to violate the procedural rights of a Federal employee who has been accused of discrimination. Additional Information For further information regarding the No FEAR Act regulations, refer to 5 CFR part 724, as well as the Equal Employment Opportunity Staff at MCC. Additional information regarding Federal antidiscrimination, whistleblower protection and retaliation laws can be found at the EEOC Web site—https://www.eeoc.gov and the OSC Web site—https://www.osc.gov. Existing Rights Unchanged Pursuant to section 205 of the No FEAR Act, neither the Act nor this notice creates, expands or reduces any rights otherwise available to any employee, former employee or applicant under the laws of the United States, including the provisions of law specified in 5 U.S.C. 2302(d). Dated: December 14, 2007. William G. Anderson, Jr., Vice President & General Counsel, Millennium Challenge Corporation. [FR Doc. E7–24631 Filed 12–18–07; 8:45 am] BILLING CODE 9211–03–P MILLENNIUM CHALLENGE CORPORATION [MCC FR 07–14] Notice of Quarterly Report (July 1, 2007–September 30, 2007) Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter July 1, 2007 through September 30, 2007 with respect to both assistance provided under Section 605 of the Millennium Challenge Act of 2003 (Pub. L. 108–199, Division D (the Act)), and transfers of funds to other federal agencies pursuant to Section 619 of that Act. The following report shall be made available to the public by means of publication in the Federal Register and on the Internet website of the MCC (https://www.mcc.gov) in accordance with Section 612(b) of the Act. AGENCY: ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Cumulative disbursements Objectives Country: Madagascar Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Madagascar Total Obligation: $109,773,000 Total Quarterly Disbursement: $4,774,000 $37,803,000 Increase Land Titling and Security. $3,983,000 Finance Project ......................... mstockstill on PROD1PC66 with NOTICES Land Tenure Project ................. 35,888,000 Increase Competition in the Financial Sector. 3,507,000 VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 Measures Legislative proposal reflecting the National Land Tenure Program submitted to Parliament and passed. Number of land disputes reported and resolved in the target zones and sites of implementation. Percentage of land documents inventoried, restored, and/or digitized. Average time and cost required to carry out property transactions. Percent of reported land conflicts resolved on titled land in zone 3, 4, 5 during the title regularization operations. Percentage of land in the zones that is demarcated and ready for titling. The number of savings accounts and outstanding value of accounts from primary banks. Maximum check clearing delay. Volume of funds in payment system and number of transactions. Increased public awareness of new financial instruments as measured by surveys within intervention zones and large towns. The amount of government debt issued with maturities in excess of 52 weeks. The number of new individual investors buying government debt securities. The number of bank branches of the Central Bank of Madagascar capable of accepting auction tenders. Percentage of all loans included in the central database. E:\FR\FM\19DEN1.SGM 19DEN1 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices 71967 ASSISTANCE PROVIDED UNDER SECTION 605—Continued Projects Obligated Cumulative disbursements Objectives Agricultural Business Investment Project. 17,683,000 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. 4,488,000 Program Administration* and Control, Monitoring and Evaluation. Pending subsequent reports** .. 18,399,000 ................................................... 11,813,000 ........................ ................................................... ¥1,061,000 Projects Obligated Objectives $72,195,000 Increase the productivity and business skills of farmers who operate small and medium-size farms and their employees. $6,667,000 Transportation Project .............. 125,700,000 927,000 Program Administration* and Control, Monitoring and Evaluation. Pending subsequent reports** .. 17,105,000 Reduce transportation costs between targeted production centers and national, regional and global markets. ................................................... ........................ ................................................... Obligated $10,848,000 1,574,000 Cumulative disbursements Objectives Increase agricultural production in three targeted watershed areas on three islands. Increase integration of the internal market and reduce transportation costs. Infrastructure Improvement ...... 78,760,000 Private Sector Development ..... 7,200,000 Program Administration* and Control, Monitoring and Evaluation. Pending subsequent reports** .. 13,270,000 ........................ ................................................... Obligated 6,121,000 128,000 4,288,000 Cumulative disbursements Objectives $26,400,000 Increase Investment by strengthening property rights. $967,000 Transportation Project .............. 92,800,000 973,000 Rural Business Development Project. 33,500,000 Reduce transportation costs between Leon and Chinandega and national, regional and global markets. Increase the value added of farms and enterprises in the region. Jkt 214001 PO 00000 Frm 00097 Fmt 4703 Measures Total Obligation: $175,000,000 Total Quarterly Disbursement: $2,174,000 Property Regularization Project 21:40 Dec 18, 2007 Increase in horticultural productivity. Increase in annual income. Value-added for farms and agribusiness. Volume of goods shipped between Praia and other islands. Mobility Ratio: Percentage of beneficiary population who take at least 5 trips per month. Savings on transport costs from improvements. Value added in priority sectors above current trends. Volume of private investment in priority sectors above current trends. 2,977,000 Country: Nicaragua Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Nicaragua VerDate Aug<31>2005 Measures Total Obligation: $110,078,000 Total Quarterly Disbursement: $4,327,000 $417,000 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. ................................................... Projects Increase in farm income resulting from Rural Development Project. Funds lent by MCA-Honduras to financial institutions. Increase in employment income resulting from Rural Development Project. Number of Program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Freight shipment cost from Tegucigalpa to Puerto Cortes. Price of basic food basket. Number of days per year road is passable. 1,804,000 Country: Cape Verde Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Cape Verde Watershed and Agricultural Support. Measures Total Obligation: $215,000,000 Total Quarterly Disbursement: $1,688,000 Rural Development Project ...... Projects Number of rural producers receiving or soliciting information from Agricultural Business Centers about the opportunities. Intervention zones identified and description of beneficiaries within each zone submitted. Number of visitors receiving information from National Coordinating Center with respect to business opportunities. Change in farm income due to improved production and marketing practices. Change in enterprise income due to improved production and marketing practices. Number of farmers and business employing technical assistance received. Cumulative disbursements Country: Honduras Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Honduras mstockstill on PROD1PC66 with NOTICES Measures 2,852,000 Sfmt 4703 Value of investment on land. Value of urban land. Value of rural land. Number of days to conduct a land transaction. Total cost to conduct a land transaction. Price of a basket of goods. Travel Time. Annual percentage increase in value-added of clients of business office. Number of jobs created. E:\FR\FM\19DEN1.SGM 19DEN1 71968 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices Projects Obligated Cumulative disbursements Objectives Measures Number of program farm plots harvesting higher-value crops or reforesting under improvement of Water Supply Activities. Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. 22,300,000 ................................................... 3,438,000 ........................ ................................................... 1,445,000 Projects Obligated Objectives Cumulative disbursements Country: Georgia Year: 2007 Quarter 3 Entity to which the assistance is provided: MCA Georgia Total Obligation: $294,693,000 Total Quarterly Disbursement: $1,000,000 Regional Infrastructure Rehabilitation. $211,700,000 Key Regional Infrastructure Rehabilitated. $16,376,000 Regional Enterprise Development. 47,500,000 Enterprises in Regions Developed. 3,765,000 Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. 35,493,000 ................................................... 5,948,000 ........................ ................................................... Projects Obligated Transportation Infrastructure Project. Reduction in Akhalkalaki-Ninotsminda-Teleti journey time. Reduction in vehicle operating costs. Increase in internal regional traffic volumes. Decreased technical losses in gas through the main NorthSouth pipeline Reduction in the production of greenhouse gas emissions measured in tons of CO2 equivalent. Increased collection rate of the Georgian Gas Company (GOGC). Number of household beneficiaries served by Regional Infrastructure Development projects. Actual operations and maintenance expenditures. Increase in annual revenue in portfolio companies. Increase in number of portfolio company employees and number of local suppliers. Increase in portfolio companies’ wages and payments to local suppliers. Jobs created. Increase in aggregate incremental net revenue to project assisted firms. Direct household net income. Direct household net income for market information initiative beneficiaries. Number of beneficiaries. 3,948,000 Cumulative disbursements Objectives Country: Vanuatu Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Vanuatu Measures Total Obligation: $65,690,000 Total Quarterly Disbursement: $286,000 $60,690,000 Facilitate transportation to increase tourism and business development. $2,000 Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. 5,000,000 ................................................... ........................ ................................................... 714,000 Obligated Objectives Number of Tourists. Number of days per year road is closed. Number of S–W Bay, Malekula flights cancelled per year due to flooding. Vessel wait time at wharf. 1,291,000 Projects Cumulative disbursements Country: Armenia Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Armenia Irrigated Agriculture Project ...... mstockstill on PROD1PC66 with NOTICES Measures Rural Road Rehabilitation Project. VerDate Aug<31>2005 21:40 Dec 18, 2007 Total Obligation: $235,650,000 Total Quarterly Disbursement: $2,185,000 $145,680,000 Increase agricultural productivity and Improve Quality of Irrigation. $3,545,000 67,100,000 Better access to economic and social infrastructure. 914,000 Jkt 214001 PO 00000 Frm 00098 Fmt 4703 Measures Sfmt 4703 Increase in hectares covered by high value added horticultural and fruit crops. Percentage of respondents satisfied with irrigation services. Share of Water User Association water charges as percentage of Water User Association annual operations and maintenance costs. Number of farmers using improved on-farm water management practices. Annual increase in irrigated land in Project area. State budget expenditures on maintenance of irrigation system. Value of loans provided under the project. Government budgetary allocations for routine maintenance of the entire road network. Average daily traffic in Project area. Kilometers of Package 1 road sections rehabilitated. Kilometers of Package 2 road sections rehabilitated. Kilometers of Package 3 road sections rehabilitated. E:\FR\FM\19DEN1.SGM 19DEN1 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices Projects Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. Obligated Cumulative disbursements Objectives 22,870,000 ................................................... ........................ ................................................... Projects Obligated 1,987,000 1,488,000 Country: Benin Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Benin Measures Total Obligation: $307,298,000 Total Quarterly Disbursement: $8,104,000 Access to Financial Services ... $19,650,000 Expand Access to Financial Services. $490,000 Access to Justice ...................... 34,270,000 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims. 489,000 Access to Land ......................... 36,020,000 Strengthen property rights and increase investment in rural and urban land. 2,188,000 Access to Markets .................... 169,447,000 47,911,000 Improve Access to Markets through Improvements to the Port of Cotonou. ................................................... 1,117,000 Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. 3,458,000 ........................ ................................................... 5,685,000 Projects Obligated Objectives Operational self-sufficiency of participating microfinance institutions. Number of microfinance institutions supervised by the microfinance cellule. Total incremental increase in value of new credit extended and savings received by financial institutions participating in the project. Share value of all loans outstanding that have one or more installments of principal over 30 days past due. Total number of loans guaranteed by land titles per year. Number of cases processed at the arbitration center. Percentage of all cases in the ‘‘Tribunal de Premiere Instance’’ courts per year. Percentage of all cases resolved in court of appeals per year. Average distance to reach TPI. Number of enterprises registered through the registration center. Average number of days required to register an enterprise. Total value of additional investments in target rural land parcels. Total value of additional investments in target urban land parcels. Total metric tons of exports and imports passing through Port of Cotonou per year. Cumulative disbursements Country: Ghana Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Ghana Measures Total Obligation: $547,010,000 Total Quarterly Disbursement: $6,424,000 Agriculture Project .................... $242,352,000 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. $2,017,000 Rural Development ................... 101,288,000 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. 0 Transportation ........................... mstockstill on PROD1PC66 with NOTICES Measures Cumulative disbursements Objectives 71969 141,736,000 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. 20,000 Program Administration*, Due Diligence, Monitoring and Evaluation. Pending subsequent reports** .. 61,634,000 ................................................... 1,725,000 ........................ ................................................... 5,579,000 VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00099 Fmt 4703 Sfmt 4703 Number of hectares irrigated. Number of days to conduct a land transaction. Number of land disputes in the pilot registration districts. Registration of land rights in the pilot registration districts. Metric tons of products passing through post-harvest treatment. Portfolio-at-risk of agriculture loan fund. Value of loans disbursed to clients from agricultural loan fund. Number of additional loans. Vehicle operating costs on minor, medium and major rehabilitated roads. Time/quality per procurement. Score card of citizen satisfaction with services. Gross enrollment rates. Gender parity in school enrollment. Distance to collect water. Time to collect water. Distance to sanitation facility. Travel time to sanitation facility. Incidence of guinea worm, diarrhea or bilharzias. Average number of days lost due to guinea worm, diarrhea or bilharzias. Percentage of households, schools, and agricultural processing plants in target districts with electricity. Number of inter-bank transactions. Value of deposit accounts in rural banks. Volume capacity ratio. Vehicles per hour at peak hour. Travel time at peak hour. International roughness index. Annual average daily vehicle and passenger traffic. E:\FR\FM\19DEN1.SGM 19DEN1 71970 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices Projects Obligated Cumulative disbursements Objectives Country: El Salvador Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA El Salvador Human Development Project ... Total Obligation: $460,940,000 Total Quarterly Disbursement: $2,224,000 $91,675,000 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. $0 84,196,000 Productive Development Project. 0 0 2,224,000 Connectivity Project .................. 234,963,000 Program Administration* and Control, Monitoring and Evaluation. Pending Subsequent Report** 50,106,000 Increase production and employment in the Northern Zone. Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. ................................................... ........................ ................................................... Projects Obligated Objectives 0 $91,631,000 Weighted average of the International Roughness Index for the rehabilitation of the Transnational Highway. Weighted average of the International Roughness Index for the rehabilitation of the network of connecting roads. Measures Total Obligation: $460,684,000 Total Quarterly Disbursement: $2,054,000 Establish an independent and secure link to the regional and global economy. Develop a platform for industrial activity to be located within the Airport domain. Increase the agricultural production and productivity in the Alatona zone of the ON. $151,000 Industrial Park Project .............. 97,040,000 Alatona Irrigation Project .......... mstockstill on PROD1PC66 with NOTICES Number of students enrolled in the Chalatenango Center functioning as a MEGATEC institute. Graduation rate of students enrolled in the Chalatenango Center functioning as a MEGATEC institute. Number of students enrolled in participating middle technical schools. Graduation rate of students enrolled in participating middle technical schools. Number of students enrolled in non-formal training activites. Graduation rate of students enrolled in non-formal training activites. Number of households with access to water in the Northern Zone. Number of households with access to basic sanitation in the Northern Zone. Number of households with electricity in the Northern Zone. Number of individuals that benefit annually from the strategic infrastructure projects. Investment in productive chains by selected beneficiaries. Cumulative disbursements Country: Mali Year: 2007 Quarter 4 Entity to which the assistance is provided: MCA Mali ´ Bamako Senou Airport Improvement Project. Measures 234,608,000 Program Administration* and Control, Monitoring and Evaluation. Pending Subsequent Report** 37,405,000 ................................................... 1,608,000 ........................ ................................................... Number of weekly flight arrivals and departures. Average time for passengers to complete departures and arrivals procedures. Occupancy level. Average number of days required for operator to connect to Industrial Park water and electricity services. Weighted average of the International Roughness Index for the rehabilitation of the Niono-Goma Coura road. Annual average daily count of vehicles on the Niono-Goma Coura road. Total amount of land irrigated by the Project in the Alatona zone. Average water volume delivered at the farm level in the Alatona zone. Crop water requirements as a percentage share of water supply at the Canal headworks in the Alatona Zone. Number of 5 and 10 hectare farm plots allocated in the Alatona zone. Total market garden parcels allocated in the Alatona zone. Number of titles registered in the land registration office granted to households in the Alatona zone. Number of students enrolled in schools established by the Project. Graduation rate of students enrolled in schools established by the Project. Number of farms adopting at least one new extension technique as a percentage of all farms receiving technical assistance under the Project. Total amount of credit extended in loan portfolios by participating microfinance institutions and banks in the Alatona zone. Number of active clients of microfinance institutions and banks in the Alatona zone. 0 VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00100 Fmt 4703 295,000 0 Sfmt 4703 E:\FR\FM\19DEN1.SGM 19DEN1 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices Projects Obligated Cumulative disbursements Objectives 71971 Measures Country: Mozambique (CIF ONLY) Year: 2007 Quarter 4 Total Obligation: $25,346,000 Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursement: $0 Water and Sanitation Project ... N/A Increase access to reliable and quality water and sanitation facilities. N/A Road Rehabilitation Project ...... N/A Increase access to productive resources and markets. N/A Land Tenure Services Project .. N/A Establish efficient, secure land access for households and investors. N/A Farmer Income Support Project N/A Improve coconut productivity and diversification into cash crop. N/A Program Administration* and Control, Monitoring and Evaluation. Pending Subsequent Report** N/A ................................................... N/A ........................ ................................................... $0 Projects Obligated Objectives Value of productive days gained due to less diarrhea, cholera and/or malaria. School attendance days gained due to less diarrhea, cholera and/or malaria. Number (Percent) of businesses with access to improved water source. Reduction in time for rural/urban households to access improved water sources. Number (Percent) of urban households with access to improved water sources. Number (Percent) of rural households with access to improved water sources. Number (Percent) of urban households with access to improved sanitation facilities. Increase in agricultural production among communities affected by road rehabilitation works. Increase in the number of new businesses within 5 km of rehabilitated roads. Reduction in vehicle operating costs as a result of rehabilitated roads. Time savings due to a reduction in time to travel a fixed length of rehabilitated road. Weighted average of the International Roughness Index for the rehabilitation roads. Average annual daily traffic volume on rehabilitated roads disaggregated by vehicle type. Increase (Percent) in value of new investments on land. Number of new businesses. Reduction (Percent) in time to right to land usage. More efficient, free and secure land transfers/transactions. Increase (Percentage) in parcel-holder land value. Reduction (Percent) in costs to right to land usage. Reduction (Percentage) in loss of coconut production and coconut products’ sales. Increased income (Percentage) from sales from intercropping activities to small farm plot holders. Increased number (Percentage) of live coconut trees. Increased productive capacity (Percentage) of coconut trees. Cumulative disbursements Measures Country: Lesotho (CIF ONLY) Year: 2007 Quarter 4 Total Obligation: $15,668,000 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $0 $4,913,000 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. $0 Health Project ........................... mstockstill on PROD1PC66 with NOTICES Water Project ............................ 4,436,000 Increase access to life-extending ART and essential health services by providing a sustainable delivery platform. 0 VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 PO 00000 Frm 00101 Fmt 4703 Sfmt 4703 Increased urban access to potable water supply. Increase in volume of water delivered after treatment at Metolong site. Decrease in percentage of urban water that is not accounted for (non-revenue losses plus physical losses). Number of people covered per year in rural areas with MCC funded rural water supply. Number of new VIP latrines provided to households. Increase in the percentage of health facilities providing full package of standard services for level of center (MoHSW 2007 standard). Increase in TB treatment success rate. Increase in the percentage of health facilities staffed with standard number and type of qualified staff (MoHSW 2007 standard). Increase in the number of patients treated in health centers in Lesotho. Increase in mmunization rate (measles). Number of people receiving ARV treatment (number). Increase in annual enrollment at National Health Training College. Increase in average referred tests performed at the central laboratory per quarter during the past year. Increase in average number of blood units collected per quarter during the past year. E:\FR\FM\19DEN1.SGM 19DEN1 71972 Federal Register / Vol. 72, No. 243 / Wednesday, December 19, 2007 / Notices Projects Obligated Private Sector Development Project. Program Administration* and Control, Monitoring and Evaluation. Pending Subsequent Report** Cumulative disbursements Objectives 710,000 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. 0 5,609,000 ................................................... 0 ........................ ................................................... Measures Projects Obligated Increase in the percentage of the adult population listed by a private credit bureau with current information on repayment history, unpaid debts or credit outstanding. Increase in the number of payments associated with salaries and pensions made through EFT per year. Land used as collateral (number of mortgage bonds registered). Land transaction costs (percent of property value). Land transaction times (median number of days necessary to complete a procedure). Increase in the number of pending civil cases in the High Court. Gender equality index (percent change in index of knowledge, attitudes, and practices for supporting gender equality in economic rights). 0 Cumulative disbursements Objectives Measures Country: Morocco (CIF ONLY) Year: 2007 Quarter 4 Total Obligation: $32,400,000 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $0 Fruit Tree Productivity .............. Small Scale Fisheries ............... Artisan and Fez Medina ........... Financial Services .................... Enterprise Support .................... Program Administration* and Control, Monitoring and Evaluation. Pending Subsequent Report** $6,960,000 7,006,000 6,142,000 500,000 0 11,792,000 TBD TBD TBD TBD TBD TBD $0 0 0 0 0 0 TBD. TBD. TBD. TBD. TBD. TBD. TBD .......................................... 0 .......................................... .......................................... .......................................... .......................................... .......................................... .......................................... 0 TBD. * Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. ** These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). 619 Transfer Funds U.S. Agency to which funds were transferred Amount USAID ......................................................................................................................................................... Dated: December 14, 2007. William G. Anderson, Jr., Vice President and General Counsel, Millennium Challenge Corporation. [FR Doc. E7–24634 Filed 12–18–07; 8:45 am] BILLING CODE 9210–01–P THE NATIONAL FOUNDATION FOR THE ARTS AND THE HUMANITIES Notice of Proposed Information Collection: Analysis of Trends in Institute of Museum and Library Services Grants to States Institute of Museum and Library Services, National Foundation for the Arts and Humanities. ACTION: Notice. mstockstill on PROD1PC66 with NOTICES AGENCY: SUMMARY: The Institute of Museum and Library Service (IMLS) as part of its continuing effort to reduce paperwork and respondent burden, conducts a preclearance consultation program to provide the general public and federal agencies with an opportunity to comment on proposed and/or VerDate Aug<31>2005 21:40 Dec 18, 2007 Jkt 214001 continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA95)[44 U.S.C. 3508(2)(A)]. This program helps to ensure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently the Institute of Museum and Library Services is soliciting comments concerning the proposed study to assess the impact of access to computers and the Internet and to related services at public libraries on individuals, families, and communities. Written comments must be submitted to the office listed in the ADDRESSES section below on or before February 19, 2008. IMLS is particularly interested in comments that help the agency to: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including DATES: PO 00000 Frm 00102 Fmt 4703 Sfmt 4703 $24,294,350 Description of program or project Threshold Program whether the information will have practical utility; • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; • Enhance the quality, utility, and clarity of the information to be collected; and • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g. permitting electronic submissions of responses. ADDRESSES: Send comments to: Mamie Bittner, Director, Office of Policy, Planning, Research, and Communications, Institute of Museum and Library Services, 1800 M Street, NW., 9th floor, Washington, DC 20036, by telephone: 202–653–4630; fax: 202– 653–4625; or by e-mail at mbittner@imls.gov. SUPPLEMENTARY INFORMATION: E:\FR\FM\19DEN1.SGM 19DEN1

Agencies

[Federal Register Volume 72, Number 243 (Wednesday, December 19, 2007)]
[Notices]
[Pages 71966-71972]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-24634]


-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 07-14]


Notice of Quarterly Report (July 1, 2007-September 30, 2007)

AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter July 1, 2007 through September 30, 2007 with respect to 
both assistance provided under Section 605 of the Millennium Challenge 
Act of 2003 (Pub. L. 108-199, Division D (the Act)), and transfers of 
funds to other federal agencies pursuant to Section 619 of that Act. 
The following report shall be made available to the public by means of 
publication in the Federal Register and on the Internet website of the 
MCC (https://www.mcc.gov) in accordance with Section 612(b) of the Act.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2007 Quarter 4 Total Obligation: $109,773,000
       Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $4,774,000
----------------------------------------------------------------------------------------------------------------
Land Tenure Project..............     $37,803,000  Increase Land            $3,983,000  Legislative proposal
                                                    Titling and                          reflecting the National
                                                    Security.                            Land Tenure Program
                                                                                         submitted to Parliament
                                                                                         and passed.
                                                                                        Number of land disputes
                                                                                         reported and resolved
                                                                                         in the target zones and
                                                                                         sites of
                                                                                         implementation.
                                                                                        Percentage of land
                                                                                         documents inventoried,
                                                                                         restored, and/or
                                                                                         digitized.
                                                                                        Average time and cost
                                                                                         required to carry out
                                                                                         property transactions.
                                                                                        Percent of reported land
                                                                                         conflicts resolved on
                                                                                         titled land in zone 3,
                                                                                         4, 5 during the title
                                                                                         regularization
                                                                                         operations.
                                                                                        Percentage of land in
                                                                                         the zones that is
                                                                                         demarcated and ready
                                                                                         for titling.
Finance Project..................      35,888,000  Increase                  3,507,000  The number of savings
                                                    Competition in the                   accounts and
                                                    Financial Sector.                    outstanding value of
                                                                                         accounts from primary
                                                                                         banks.
                                                                                        Maximum check clearing
                                                                                         delay.
                                                                                        Volume of funds in
                                                                                         payment system and
                                                                                         number of transactions.
                                                                                        Increased public
                                                                                         awareness of new
                                                                                         financial instruments
                                                                                         as measured by surveys
                                                                                         within intervention
                                                                                         zones and large towns.
                                                                                        The amount of government
                                                                                         debt issued with
                                                                                         maturities in excess of
                                                                                         52 weeks.
                                                                                        The number of new
                                                                                         individual investors
                                                                                         buying government debt
                                                                                         securities.
                                                                                        The number of bank
                                                                                         branches of the Central
                                                                                         Bank of Madagascar
                                                                                         capable of accepting
                                                                                         auction tenders.
                                                                                        Percentage of all loans
                                                                                         included in the central
                                                                                         database.

[[Page 71967]]

 
Agricultural Business Investment       17,683,000  Improve                   4,488,000  Number of rural
 Project.                                           Agricultural                         producers receiving or
                                                    Projection                           soliciting information
                                                    Technologies and                     from Agricultural
                                                    Market Capacity in                   Business Centers about
                                                    Rural Areas.                         the opportunities.
                                                                                        Intervention zones
                                                                                         identified and
                                                                                         description of
                                                                                         beneficiaries within
                                                                                         each zone submitted.
                                                                                        Number of visitors
                                                                                         receiving information
                                                                                         from National
                                                                                         Coordinating Center
                                                                                         with respect to
                                                                                         business opportunities.
                                                                                        Change in farm income
                                                                                         due to improved
                                                                                         production and
                                                                                         marketing practices.
                                                                                        Change in enterprise
                                                                                         income due to improved
                                                                                         production and
                                                                                         marketing practices.
                                                                                        Number of farmers and
                                                                                         business employing
                                                                                         technical assistance
                                                                                         received.
Program Administration* and            18,399,000  ...................      11,813,000
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................      -1,061,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2007 Quarter 4 Total Obligation: $215,000,000
        Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $1,688,000
----------------------------------------------------------------------------------------------------------------
Rural Development Project........     $72,195,000  Increase the             $6,667,000  Increase in farm income
                                                    productivity and                     resulting from Rural
                                                    business skills of                   Development Project.
                                                    farmers who                         Funds lent by MCA-
                                                    operate small and                    Honduras to financial
                                                    medium-size farms                    institutions.
                                                    and their                           Increase in employment
                                                    employees.                           income resulting from
                                                                                         Rural Development
                                                                                         Project.
                                                                                        Number of Program
                                                                                         farmers harvesting high-
                                                                                         value horticulture
                                                                                         crops.
                                                                                        Number of hectares
                                                                                         harvesting high-value
                                                                                         horticulture crops.
Transportation Project...........     125,700,000  Reduce                      927,000  Freight shipment cost
                                                    transportation                       from Tegucigalpa to
                                                    costs between                        Puerto Cortes.
                                                    targeted                            Price of basic food
                                                    production centers                   basket.
                                                    and national,                       Number of days per year
                                                    regional and                         road is passable.
                                                    global markets.
Program Administration* and            17,105,000  ...................       1,804,000
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       1,574,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2007 Quarter 4 Total Obligation: $110,078,000
       Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $4,327,000
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $10,848,000  Increase                   $417,000  Increase in
 Support.                                           agricultural                         horticultural
                                                    production in                        productivity.
                                                    three targeted                      Increase in annual
                                                    watershed areas on                   income.
                                                    three islands.                      Value-added for farms
                                                                                         and agribusiness.
Infrastructure Improvement.......      78,760,000  Increase                  6,121,000  Volume of goods shipped
                                                    integration of the                   between Praia and other
                                                    internal market                      islands.
                                                    and reduce                          Mobility Ratio:
                                                    transportation                       Percentage of
                                                    costs.                               beneficiary population
                                                                                         who take at least 5
                                                                                         trips per month.
                                                                                        Savings on transport
                                                                                         costs from
                                                                                         improvements.
Private Sector Development.......       7,200,000  Spur private sector         128,000  Value added in priority
                                                    development on all                   sectors above current
                                                    islands through                      trends.
                                                    increased                           Volume of private
                                                    investment in the                    investment in priority
                                                    priority sectors                     sectors above current
                                                    and through                          trends.
                                                    financial sector
                                                    reform.
Program Administration* and            13,270,000  ...................       2,977,000
 Control, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       4,288,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2007 Quarter 4 Total Obligation: $175,000,000
       Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $2,174,000
----------------------------------------------------------------------------------------------------------------
Property Regularization Project..     $26,400,000  Increase Investment        $967,000  Value of investment on
                                                    by strengthening                     land.
                                                    property rights.                    Value of urban land.
                                                                                        Value of rural land.
                                                                                        Number of days to
                                                                                         conduct a land
                                                                                         transaction.
                                                                                        Total cost to conduct a
                                                                                         land transaction.
Transportation Project...........      92,800,000  Reduce                      973,000  Price of a basket of
                                                    transportation                       goods.
                                                    costs between Leon                  Travel Time.
                                                    and Chinandega and
                                                    national, regional
                                                    and global markets.
Rural Business Development             33,500,000  Increase the value        2,852,000  Annual percentage
 Project.                                           added of farms and                   increase in value-added
                                                    enterprises in the                   of clients of business
                                                    region.                              office.
                                                                                        Number of jobs created.

[[Page 71968]]

 
                                                                                        Number of program farm
                                                                                         plots harvesting higher-
                                                                                         value crops or
                                                                                         reforesting under
                                                                                         improvement of Water
                                                                                         Supply Activities.
Program Administration*, Due           22,300,000  ...................       3,438,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       1,445,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2007 Quarter 3 Total Obligation: $294,693,000
        Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $1,000,000
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $211,700,000  Key Regional            $16,376,000  Reduction in Akhalkalaki-
 Rehabilitation.                                    Infrastructure                       Ninotsminda-Teleti
                                                    Rehabilitated.                       journey time.
                                                                                        Reduction in vehicle
                                                                                         operating costs.
                                                                                        Increase in internal
                                                                                         regional traffic
                                                                                         volumes.
                                                                                        Decreased technical
                                                                                         losses in gas through
                                                                                         the main North-South
                                                                                         pipeline
                                                                                        Reduction in the
                                                                                         production of
                                                                                         greenhouse gas
                                                                                         emissions measured in
                                                                                         tons of CO2 equivalent.
                                                                                        Increased collection
                                                                                         rate of the Georgian
                                                                                         Gas Company (GOGC).
                                                                                        Number of household
                                                                                         beneficiaries served by
                                                                                         Regional Infrastructure
                                                                                         Development projects.
                                                                                        Actual operations and
                                                                                         maintenance
                                                                                         expenditures.
Regional Enterprise Development..      47,500,000  Enterprises in            3,765,000  Increase in annual
                                                    Regions Developed.                   revenue in portfolio
                                                                                         companies.
                                                                                        Increase in number of
                                                                                         portfolio company
                                                                                         employees and number of
                                                                                         local suppliers.
                                                                                        Increase in portfolio
                                                                                         companies' wages and
                                                                                         payments to local
                                                                                         suppliers.
                                                                                        Jobs created.
                                                                                        Increase in aggregate
                                                                                         incremental net revenue
                                                                                         to project assisted
                                                                                         firms.
                                                                                        Direct household net
                                                                                         income.
                                                                                        Direct household net
                                                                                         income for market
                                                                                         information initiative
                                                                                         beneficiaries.
                                                                                        Number of beneficiaries.
Program Administration*, Due           35,493,000  ...................       5,948,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       3,948,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2007 Quarter 4 Total Obligation: $65,690,000
         Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $286,000
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,690,000  Facilitate                   $2,000  Number of Tourists.
 Project.                                           transportation to                   Number of days per year
                                                    increase tourism                     road is closed.
                                                    and business                        Number of S-W Bay,
                                                    development.                         Malekula flights
                                                                                         cancelled per year due
                                                                                         to flooding.
                                                                                        Vessel wait time at
                                                                                         wharf.
Program Administration*, Due            5,000,000  ...................       1,291,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................         714,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2007 Quarter 4 Total Obligation: $235,650,000
        Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $2,185,000
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project....    $145,680,000  Increase                 $3,545,000  Increase in hectares
                                                    agricultural                         covered by high value
                                                    productivity and                     added horticultural and
                                                    Improve Quality of                   fruit crops.
                                                    Irrigation.                         Percentage of
                                                                                         respondents satisfied
                                                                                         with irrigation
                                                                                         services.
                                                                                        Share of Water User
                                                                                         Association water
                                                                                         charges as percentage
                                                                                         of Water User
                                                                                         Association annual
                                                                                         operations and
                                                                                         maintenance costs.
                                                                                        Number of farmers using
                                                                                         improved on-farm water
                                                                                         management practices.
                                                                                        Annual increase in
                                                                                         irrigated land in
                                                                                         Project area.
                                                                                        State budget
                                                                                         expenditures on
                                                                                         maintenance of
                                                                                         irrigation system.
                                                                                        Value of loans provided
                                                                                         under the project.
Rural Road Rehabilitation Project      67,100,000  Better access to            914,000  Government budgetary
                                                    economic and                         allocations for routine
                                                    social                               maintenance of the
                                                    infrastructure.                      entire road network.
                                                                                        Average daily traffic in
                                                                                         Project area.
                                                                                        Kilometers of Package 1
                                                                                         road sections
                                                                                         rehabilitated.
                                                                                        Kilometers of Package 2
                                                                                         road sections
                                                                                         rehabilitated.
                                                                                        Kilometers of Package 3
                                                                                         road sections
                                                                                         rehabilitated.

[[Page 71969]]

 
Program Administration*, Due           22,870,000  ...................       1,987,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       1,488,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2007 Quarter 4 Total Obligation: $307,298,000
         Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $8,104,000
----------------------------------------------------------------------------------------------------------------
Access to Financial Services.....     $19,650,000  Expand Access to           $490,000  Operational self-
                                                    Financial Services.                  sufficiency of
                                                                                         participating
                                                                                         microfinance
                                                                                         institutions.
                                                                                        Number of microfinance
                                                                                         institutions supervised
                                                                                         by the microfinance
                                                                                         cellule.
                                                                                        Total incremental
                                                                                         increase in value of
                                                                                         new credit extended and
                                                                                         savings received by
                                                                                         financial institutions
                                                                                         participating in the
                                                                                         project.
                                                                                        Share value of all loans
                                                                                         outstanding that have
                                                                                         one or more
                                                                                         installments of
                                                                                         principal over 30 days
                                                                                         past due.
                                                                                        Total number of loans
                                                                                         guaranteed by land
                                                                                         titles per year.
Access to Justice................      34,270,000  Improved Ability of         489,000  Number of cases
                                                    Justice System to                    processed at the
                                                    Enforce Contracts                    arbitration center.
                                                    and Reconcile                       Percentage of all cases
                                                    Claims.                              in the ``Tribunal de
                                                                                         Premiere Instance''
                                                                                         courts per year.
                                                                                        Percentage of all cases
                                                                                         resolved in court of
                                                                                         appeals per year.
                                                                                        Average distance to
                                                                                         reach TPI.
                                                                                        Number of enterprises
                                                                                         registered through the
                                                                                         registration center.
                                                                                        Average number of days
                                                                                         required to register an
                                                                                         enterprise.
Access to Land...................      36,020,000  Strengthen property       2,188,000  Total value of
                                                    rights and                           additional investments
                                                    increase                             in target rural land
                                                    investment in                        parcels.
                                                    rural and urban                     Total value of
                                                    land.                                additional investments
                                                                                         in target urban land
                                                                                         parcels.
Access to Markets................     169,447,000  Improve Access to         1,117,000  Total metric tons of
                                                    Markets through                      exports and imports
                                                    Improvements to                      passing through Port of
                                                    the Port of                          Cotonou per year.
                                                    Cotonou.
Program Administration*, Due           47,911,000  ...................       3,458,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       5,685,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2007 Quarter 4 Total Obligation: $547,010,000
         Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $6,424,000
----------------------------------------------------------------------------------------------------------------
Agriculture Project..............    $242,352,000  Enhance                  $2,017,000  Number of hectares
                                                    Profitability of                     irrigated.
                                                    cultivation,                        Number of days to
                                                    services to                          conduct a land
                                                    agriculture and                      transaction.
                                                    product handling                    Number of land disputes
                                                    in support of the                    in the pilot
                                                    expansion of                         registration districts.
                                                    commercial                          Registration of land
                                                    agriculture among                    rights in the pilot
                                                    groups of                            registration districts.
                                                    smallholder farms.                  Metric tons of products
                                                                                         passing through post-
                                                                                         harvest treatment.
                                                                                        Portfolio-at-risk of
                                                                                         agriculture loan fund.
                                                                                        Value of loans disbursed
                                                                                         to clients from
                                                                                         agricultural loan fund.
                                                                                        Number of additional
                                                                                         loans.
                                                                                        Vehicle operating costs
                                                                                         on minor, medium and
                                                                                         major rehabilitated
                                                                                         roads.
Rural Development................     101,288,000  Strengthen the                    0  Time/quality per
                                                    rural institutions                   procurement.
                                                    that provide                        Score card of citizen
                                                    services                             satisfaction with
                                                    complementary to,                    services.
                                                    and supportive of,                  Gross enrollment rates.
                                                    agricultural and                    Gender parity in school
                                                    agriculture                          enrollment.
                                                    business                            Distance to collect
                                                    development.                         water.
                                                                                        Time to collect water.
                                                                                        Distance to sanitation
                                                                                         facility.
                                                                                        Travel time to
                                                                                         sanitation facility.
                                                                                        Incidence of guinea
                                                                                         worm, diarrhea or
                                                                                         bilharzias.
                                                                                        Average number of days
                                                                                         lost due to guinea
                                                                                         worm, diarrhea or
                                                                                         bilharzias.
                                                                                        Percentage of
                                                                                         households, schools,
                                                                                         and agricultural
                                                                                         processing plants in
                                                                                         target districts with
                                                                                         electricity.
                                                                                        Number of inter-bank
                                                                                         transactions.
                                                                                        Value of deposit
                                                                                         accounts in rural
                                                                                         banks.
Transportation...................     141,736,000  Reduce the                   20,000  Volume capacity ratio.
                                                    transportation                      Vehicles per hour at
                                                    costs affecting                      peak hour.
                                                    agriculture                         Travel time at peak
                                                    commerce at sub-                     hour.
                                                    regional levels.                    International roughness
                                                                                         index.
                                                                                        Annual average daily
                                                                                         vehicle and passenger
                                                                                         traffic.
Program Administration*, Due           61,634,000  ...................       1,725,000
 Diligence, Monitoring and
 Evaluation.
Pending subsequent reports**.....  ..............  ...................       5,579,000
----------------------------------------------------------------------------------------------------------------


[[Page 71970]]


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2007 Quarter 4 Total Obligation: $460,940,000
      Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $2,224,000
----------------------------------------------------------------------------------------------------------------
Human Development Project........     $91,675,000  Increase human and               $0  Number of students
                                                    physical capital                     enrolled in the
                                                    of residents of                      Chalatenango Center
                                                    the Northern Zone                    functioning as a
                                                    to take advantage                    MEGATEC institute.
                                                    of employment and                   Graduation rate of
                                                    business                             students enrolled in
                                                    opportunities.                       the Chalatenango Center
                                                                                         functioning as a
                                                                                         MEGATEC institute.
                                                                                        Number of students
                                                                                         enrolled in
                                                                                         participating middle
                                                                                         technical schools.
                                                                                        Graduation rate of
                                                                                         students enrolled in
                                                                                         participating middle
                                                                                         technical schools.
                                                                                        Number of students
                                                                                         enrolled in non-formal
                                                                                         training activites.
                                                                                        Graduation rate of
                                                                                         students enrolled in
                                                                                         non-formal training
                                                                                         activites.
                                                                                        Number of households
                                                                                         with access to water in
                                                                                         the Northern Zone.
                                                                                        Number of households
                                                                                         with access to basic
                                                                                         sanitation in the
                                                                                         Northern Zone.
                                                                                        Number of households
                                                                                         with electricity in the
                                                                                         Northern Zone.
                                                                                        Number of individuals
                                                                                         that benefit annually
                                                                                         from the strategic
                                                                                         infrastructure
                                                                                         projects.
Productive Development Project...      84,196,000  Increase production               0  Investment in productive
                                                    and employment in                    chains by selected
                                                    the Northern Zone.                   beneficiaries.
Connectivity Project.............     234,963,000  Reduce travel cost                0  Weighted average of the
                                                    and time within                      International Roughness
                                                    the Northern Zone,                   Index for the
                                                    with the rest of                     rehabilitation of the
                                                    the country, and                     Transnational Highway.
                                                    within the region.                  Weighted average of the
                                                                                         International Roughness
                                                                                         Index for the
                                                                                         rehabilitation of the
                                                                                         network of connecting
                                                                                         roads.
Program Administration* and            50,106,000  ...................               0
 Control, Monitoring and
 Evaluation.
Pending Subsequent Report**......  ..............  ...................       2,224,000
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objectives       disbursements          Measures
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2007 Quarter 4 Total Obligation: $460,684,000
          Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $2,054,000
----------------------------------------------------------------------------------------------------------------
Bamako S[eacute]nou Airport           $91,631,000  Establish an               $151,000  Number of weekly flight
 Improvement Project.                               independent and                      arrivals and
                                                    secure link to the                   departures.
                                                    regional and                        Average time for
                                                    global economy.                      passengers to complete
                                                                                         departures and arrivals
                                                                                         procedures.
Industrial Park Project..........      97,040,000  Develop a platform          295,000  Occupancy level.
                                                    for industrial                      Average number of days
                                                    activity to be                       required for operator
                                                    located within the                   to connect to
                                                    Airport domain.                      Industrial Park water
                                                                                         and electricity
                                                                                         services.
Alatona Irrigation Project.......     234,608,000  Increase the                      0  Weighted average of the
                                                    agricultural                         International Roughness
                                                    production and                       Index for the
                                                    productivity in                      rehabilitation of the
                                                    the Alatona zone                     Niono-Goma Coura road.
                                                    of the ON.                          Annual average daily
                                                                                         count of vehicles on
                                                                                         the Niono-Goma Coura
                                                                                         road.
                                                                                        Total amount of land
                                                                                         irrigated by the
                                                                                         Project in the Alatona
                                                                                         zone.
                                                                                        Average water volume
                                                                                         delivered at the farm
                                                                                         level in the Alatona
                                                                                         zone.
                                                                                        Crop water requirements
                                                                                         as a percentage share
                                                                                         of water supply at the
                                                                                         Canal headworks in the
                                                                                         Alatona Zone.
                                                                                        Number of 5 and 10
                                                                                         hectare farm plots
                                                                                         allocated in the
                                                                                         Alatona zone.
                                                                                        Total market garden
                                                                                         parcels allocated in
                                                                                         the Alatona zone.
                                                                                        Number of titles
                                                                                         registered in the land
                                                                                         registration office
                                                                                         granted to households
                                                                                         in the Alatona zone.
                                                                                        Number of students
                                                                                         enrolled in schools
                                                                                         established by the
                                                                                         Project.
                                                                                        Graduation rate of
                                                                                         students enrolled in
                                                                                         schools established by
                                                                                         the Project.
                                                                                        Number of farms adopting
                                                                                         at least one new
                                                                                         extension technique as
                                                                                         a percentage of all
                                                                                         farms receiving
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.