FC Energy Services Company, LLC; Notice of Issuance of Order, 68872-68873 [E7-23620]
Download as PDF
68872
Federal Register / Vol. 72, No. 234 / Thursday, December 6, 2007 / Notices
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
December 10, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23624 Filed 12–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–22–000]
DCP Midstream, LP; Notice of Petition
for Declaratory Order
mstockstill on PROD1PC66 with NOTICES
November 28, 2007.
Take notice that on November 13,
2007, DCP Midstream, LP (DCP
Midstream) 370 17th Street, Suite 2500,
Denver, Colorado 80202 filed in Docket
No. CP08–22–000, under Rule 207(a)(2)
of the Commission’s Rules of Practice
and Procedure, 18 CFR
385.207(a)(2)(2007), a petition for a
declaratory order requesting that the
Commission disclaim jurisdiction over
certain natural gas facilities DCP
Midstream would purchase from
Transcontinental Gas Pipe Line
Corporation (Transco),1 because such
facilities perform a gathering function
and would be exempt from the
1 Transco filed an application with the
Commission in Docket No. CP08–25–000 on
November 13, 2007, requesting permission and
approval to abandon the subject facilities by sale to
DCP Midstream.
VerDate Aug<31>2005
18:57 Dec 05, 2007
Jkt 214001
Commission’s jurisdiction under section
1(b) of the Natural Gas Act.
DCP Midstream states that it would
purchase Transco’s South Texas
facilities, consisting of approximately
135.6 miles of natural gas pipelines and
related meter stations, valves,
miscellaneous field and tie-in piping,
other appurtenances along the pipeline
segments, and related realty and
easement rights. These facilities would
handle unprocessed natural gas in
Hidalgo, Willacy, Starr, Brooks, and Jim
Wells Counties, Texas, and would be
incorporated into DCP Midstream’s
existing south Texas gathering facilities
for processing at DCP Midstream’s
LaGloria Processing Plant.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Comment Date: December 19, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23618 Filed 12–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1247–000; ER07–1247–
001; ER07–1247–002]
FC Energy Services Company, LLC;
Notice of Issuance of Order
November 28, 2007.
FC Energy Services Company, LLC
(FC Energy) filed an application for
market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. FC Energy also requested waivers
of various Commission regulations. In
particular, FC Energy requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by FC Energy.
On November 28, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
FC Energy, should file a protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing protests is December
28, 2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, FC Energy is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of FC
Energy, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
E:\FR\FM\06DEN1.SGM
06DEN1
Federal Register / Vol. 72, No. 234 / Thursday, December 6, 2007 / Notices
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of FC Energy’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23620 Filed 12–5–07; 8:45 am]
BILLING CODE 6717–01–P
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC.
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 20, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23627 Filed 12–5–07; 8:45 am]
68873
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 6, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23621 Filed 12–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–66–012]
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1332–000; ER07–1332–
001; ER07–1332–002]
Louisiana Public Service Commission;
The Council of the City of New Orleans
v. Entergy Corporation; Notice of Filing
[Docket No. ES07–52–000]
Smoky Hills Wind Farm, LLC; Notice of
Issuance of Order
Northern Indiana Public Service
Company; Notice of Filing
November 29, 2007.
mstockstill on PROD1PC66 with NOTICES
November 29, 2007.
Take notice that on November 19,
2007, Entergy Services, Inc., acting as
agent for Entergy Operating Companies,
filed a refund report in compliance with
the Commission’s September 20, 2007
Order, Louisiana Public Service
Commission and the Council of the City
of New Orleans v. Entergy Corporation,
120 FERC ¶ 61,241 (2007).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
VerDate Aug<31>2005
18:57 Dec 05, 2007
Jkt 214001
November 28, 2007.
Take notice that on October 5, 2007,
Northern Indiana Public Service
Company tendered for filing certified
copies of documents to their July 31,
2007 application.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Smoky Hills Wind Farm, LLC (Smoky
Hills Wind Farm) filed an application
for market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy and
capacity at market-based rates. Smoky
Hills Wind Farm also requested waivers
of various Commission regulations. In
particular, Smoky Hills Wind Farm
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Smoky Hills
Wind Farm.
On November 29, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 72, Number 234 (Thursday, December 6, 2007)]
[Notices]
[Pages 68872-68873]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-23620]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER07-1247-000; ER07-1247-001; ER07-1247-002]
FC Energy Services Company, LLC; Notice of Issuance of Order
November 28, 2007.
FC Energy Services Company, LLC (FC Energy) filed an application
for market-based rate authority, with an accompanying rate schedule.
The proposed market-based rate schedule provides for the sale of
energy, capacity and ancillary services at market-based rates. FC
Energy also requested waivers of various Commission regulations. In
particular, FC Energy requested that the Commission grant blanket
approval under 18 CFR part 34 of all future issuances of securities and
assumptions of liability by FC Energy.
On November 28, 2007, pursuant to delegated authority, the
Director, Division of Tariffs and Market Development-West, granted the
requests for blanket approval under part 34 (Director's Order). The
Director's Order also stated that the Commission would publish a
separate notice in the Federal Register establishing a period of time
for the filing of protests. Accordingly, any person desiring to be
heard concerning the blanket approvals of issuances of securities or
assumptions of liability by FC Energy, should file a protest with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the deadline for filing protests is
December 28, 2007.
Absent a request to be heard in opposition to such blanket
approvals by the deadline above, FC Energy is authorized to issue
securities and assume obligations or liabilities as a guarantor,
indorser, surety, or otherwise in respect of any security of another
person; provided that such issuance or assumption is for some lawful
object within the corporate purposes of FC Energy, compatible with the
public interest, and is reasonably necessary or appropriate for such
purposes.
[[Page 68873]]
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of FC Energy's issuance of securities or
assumptions of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-23620 Filed 12-5-07; 8:45 am]
BILLING CODE 6717-01-P