BPUS Generation Development, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 68149-68150 [E7-23436]
Download as PDF
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices
mstockstill on PROD1PC66 with NOTICES
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23435 Filed 12–3–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
17:38 Dec 03, 2007
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12905–000]
BPUS Generation Development, LLC;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
November 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12905–000.
c. Date filed: July 30, 2007.
d. Applicant: BPUS Generation
Development, LLC.
e. Name of Project: Emsworth Locks &
Dam Hydroelectric Project.
f. Location: Ohio River in Allegheny
County, Pennsylvania. It would use the
U.S. Army Corps of Engineers’
Emsworth Locks & Dam.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jeffrey M.
Auser, P.E., BPUS Generation
Development, LLC, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088, (315) 413–2700.
i. FERC Contact: Robert Bell, (202)
502–4126.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12905–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the U.S. Army
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
68149
Corps of Engineers’ Emsworth Locks &
Dam and operated in a run-of-river
mode would consist of: (1) A new 200foot-long, 200-foot-wide, 50-foot-high
concrete powerhouse; (2) a new intake
channel and tailrace channel on the
southern bank of the main channel, on
Neville Island directly opposite the
existing locks structure; (3) five turbine/
generator units with a combined
installed capacity of 32.7 megawatts; (4)
a new 11,500-foot-long aboveground
transmission line extending from the
switchyard near the powerhouse to an
interconnection point with an existing
transmission line located southwest of
the powerhouse; and (5) appurtenant
facilities. The proposed Emsworth
Locks & Dam Project would have an
average annual generation of 141.3
gigawatt-hours.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
E:\FR\FM\04DEN1.SGM
04DEN1
mstockstill on PROD1PC66 with NOTICES
68150
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
VerDate Aug<31>2005
17:38 Dec 03, 2007
Jkt 214001
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23436 Filed 12–3–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12906–000]
BPUS Generation Development, LLC;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
November 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12906–000.
c. Date filed: July 30, 2007.
d. Applicant: BPUS Generation
Development, LLC.
e. Name of Project: Monongahela Lock
& Dam No. 4 Hydroelectric Project.
f. Location: Monongahela River in
Westmoreland County, Pennsylvania. It
would use the U.S. Army Corps of
Engineers’ Monongahela Lock & Dam
No. 4.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jeffrey M.
Auser, P.E., BPUS Generation
Development, LLC, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088, (315) 413–2700.
i. FERC Contact: Robert Bell, (202)
502–4126.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–12906–000) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the U.S. Army
Corps of Engineers’ Monongahela Lock
& Dam No. 4 and operated in a run-ofriver mode would consist of: (1) A new
200-foot-long, 250-foot-wide, 50-foot
high concrete powerhouse; (2) a new
intake channel and tailrace channel on
the southwest side of the river opposite
the existing lock structure; (3) four
turbine/generator units with a combined
installed capacity of 18.7 megawatts; (4)
a new 4,900-foot-long aboveground
transmission line extending from the
switchyard near the powerhouse to an
existing substation located southwest of
the powerhouse; and (5) appurtenant
facilities. The proposed Monongahela
Lock & Dam No. 4 Project would have
an average annual generation of 81.8
gigawatt-hours.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 72, Number 232 (Tuesday, December 4, 2007)]
[Notices]
[Pages 68149-68150]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-23436]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12905-000]
BPUS Generation Development, LLC; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene, Protests, and Comments
November 26, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12905-000.
c. Date filed: July 30, 2007.
d. Applicant: BPUS Generation Development, LLC.
e. Name of Project: Emsworth Locks & Dam Hydroelectric Project.
f. Location: Ohio River in Allegheny County, Pennsylvania. It would
use the U.S. Army Corps of Engineers' Emsworth Locks & Dam.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Jeffrey M. Auser, P.E., BPUS Generation
Development, LLC, 225 Greenfield Parkway, Suite 201, Liverpool, NY
13088, (315) 413-2700.
i. FERC Contact: Robert Bell, (202) 502-4126.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12905-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project using the U.S. Army
Corps of Engineers' Emsworth Locks & Dam and operated in a run-of-river
mode would consist of: (1) A new 200-foot-long, 200-foot-wide, 50-foot-
high concrete powerhouse; (2) a new intake channel and tailrace channel
on the southern bank of the main channel, on Neville Island directly
opposite the existing locks structure; (3) five turbine/generator units
with a combined installed capacity of 32.7 megawatts; (4) a new 11,500-
foot-long aboveground transmission line extending from the switchyard
near the powerhouse to an interconnection point with an existing
transmission line located southwest of the powerhouse; and (5)
appurtenant facilities. The proposed Emsworth Locks & Dam Project would
have an average annual generation of 141.3 gigawatt-hours.
l. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
e-mail FERCONLINESUPPORT@FERC.GOV. For TTY, call (202) 502-8659. A copy
is also available for inspection and reproduction at the address in
item h above.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
n. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license
[[Page 68150]]
application must conform with 18 CFR 4.30 and 4.36.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions To Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
r. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Federal Energy Regulatory Commission, at the above-mentioned address. A
copy of any notice of intent, competing application or motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
s. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-23436 Filed 12-3-07; 8:45 am]
BILLING CODE 6717-01-P