Appalachian Power Company; Notice of Application for Non-Project Use of Project Lands and Soliciting Comments, Motions To Intervene, and Protests, 68139-68140 [E7-23425]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices
Teays Valley High School, 3887 St.
Route 752, Ashville, OH 43103,
(740) 983–3131
January 9, 2008 6 p.m. to 10 p.m.
Presser Hall, 900 South Jefferson
Street, Mexico, MO, (573) 581–5592
Greenwood Community High School,
615 W Smith Valley Road,
Greenwood, IN 46142, (317) 889–
4000
Edgwood High School, 5005 Oxford
State Rd, Trenton, OH 45067, (513)
867–7425
Interested groups and individuals are
encouraged to attend and present oral
comments on the draft EIS. Transcripts
of the meetings will be prepared.
After the comments are reviewed, any
significant new issues are investigated,
and modifications are made to the draft
EIS, a final EIS will be published and
distributed by the FERC staff. The final
EIS will contain the staff’s responses to
timely comments received on the draft
EIS.
Comments will be considered by the
Commission and cooperating agencies
but will not serve to make the
commentor a party to the proceeding.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Anyone
may intervene in this proceeding based
on this draft EIS. Only intervenors have
the right to seek rehearing of the
Commission’s decision. You must file
your request to intervene as specified
above.1 You do not need intervenor
status to have your comments
considered.
The draft EIS has been placed in the
public files of the FERC and is available
for distribution and public inspection
at:
Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street, NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
A limited number of hardcopies and
CD-ROMs of the draft EIS are available
from the FERC’s Public Reference Room,
identified above. This draft EIS is also
available for public viewing on the
FERC’s Internet Web site at https://
www.ferc.gov. CD-ROM copies of the
draft EIS have been mailed to Federal,
State, and local agencies; public interest
groups; individuals and affected
landowners who requested a copy of the
draft EIS or provided comments during
scoping; libraries and newspapers in the
Project area; and parties to this
proceeding. Hard copy versions of the
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate Aug<31>2005
17:38 Dec 03, 2007
Jkt 214001
draft EIS were mailed to those
specifically requesting them.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number (e.g. CP07–208). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
link on the FERC Internet Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to the
eSubscription link on the FERC Internet
Web site.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23445 Filed 12–3–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2210–157]
Appalachian Power Company; Notice
of Application for Non-Project Use of
Project Lands and Soliciting
Comments, Motions To Intervene, and
Protests
November 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2210–157.
c. Date Filed: November 7, 2007.
d. Applicant: Appalachian Power
Company.
e. Name of Project: Smith Mountain
Pumped Storage Project.
f. Location: The project is located on
the Roanoke River, in Bedford,
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
68139
Pittsylvania, Franklin, and Roanoke
Counties, Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Elizabeth B.
Parcell, Environmental Coordinator I,
Appalachian Power Company, P.O. Box
2021, Roanoke, Virginia 24022–2121
(703) 985–2348.
i. FERC Contact: Any questions on
this notice should be addressed to Jade
Alvey, Telephone (202) 502–6849, and
e-mail: Jade.Alvey@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protest:
December 26, 2007.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request:
Appalachian Power Company (APC) is
seeking Commission approval to grant
permission to Grant Sutherland to
construct a single dock with 2 boat slips
adjacent to shoreline identified as an
Impact Mitigation Zone (IMZ), as
defined in the project’s shoreline
management plan (SMP). The proposed
dock would serve a single-family home
to be constructed on Christmas Tree
Island, located on the Blackwater River
near its confluence with the Roanoke
River on Smith Mountain Lake. The
licensee is requesting a variance as
required by the SMP for development
within the IMZ. In accordance with the
SMP, Grant Sutherland has developed a
plan to construct a single dock, the
length of which would not exceed a
water depth of 8 feet, and would retain
all vegetation within the project
boundary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
E:\FR\FM\04DEN1.SGM
04DEN1
mstockstill on PROD1PC66 with NOTICES
68140
Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–23425 Filed 12–3–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
17:38 Dec 03, 2007
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FFP Project 27, LLC ; Project No. 12846–
000]
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
November 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No: 12846–000.
c. Date Filed: July 25, 2007.
d. Applicant: FFP Project 27, LLC.
e. Name of Project: Duncan Point
Project.
f. Location: The project would be
located on the Mississippi River in West
Baton Rouge and East Baton Rouge
Parishes, Louisiana. The project uses no
dam or impoundment.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Dan Irvin,
FFP Project 27, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
i. FERC Contact: Mr. Robert Bell,
(202) 502–6062.
j. Deadline for filing motions to
intervene, protests and comments: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12846–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervener
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Competing Application: Project No.
12817–000, Date Filed: July 23, 2007,
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Date Issued: October 2, 2007, Due Date:
December 1, 2007.
l. Description of Project: The proposed
project consists of: (1) 2,250 proposed
20 kilowatt Free Flow generating units
having a total installed capacity of 43
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Project 27, LLC’s project would
have an average annual generation of
197.1 gigawatt-hours and be sold to a
local utility.
m. Locations of Applications: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
p. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 72, Number 232 (Tuesday, December 4, 2007)]
[NOTIC]
[Pages 68139-68140]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-23425]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2210-157]
Appalachian Power Company; Notice of Application for Non-Project
Use of Project Lands and Soliciting Comments, Motions To Intervene, and
Protests
November 26, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 2210-157.
c. Date Filed: November 7, 2007.
d. Applicant: Appalachian Power Company.
e. Name of Project: Smith Mountain Pumped Storage Project.
f. Location: The project is located on the Roanoke River, in
Bedford, Pittsylvania, Franklin, and Roanoke Counties, Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Elizabeth B. Parcell, Environmental
Coordinator I, Appalachian Power Company, P.O. Box 2021, Roanoke,
Virginia 24022-2121 (703) 985-2348.
i. FERC Contact: Any questions on this notice should be addressed
to Jade Alvey, Telephone (202) 502-6849, and e-mail:
Jade.Alvey@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protest:
December 26, 2007.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Appalachian Power Company (APC) is
seeking Commission approval to grant permission to Grant Sutherland to
construct a single dock with 2 boat slips adjacent to shoreline
identified as an Impact Mitigation Zone (IMZ), as defined in the
project's shoreline management plan (SMP). The proposed dock would
serve a single-family home to be constructed on Christmas Tree Island,
located on the Blackwater River near its confluence with the Roanoke
River on Smith Mountain Lake. The licensee is requesting a variance as
required by the SMP for development within the IMZ. In accordance with
the SMP, Grant Sutherland has developed a plan to construct a single
dock, the length of which would not exceed a water depth of 8 feet, and
would retain all vegetation within the project boundary.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at
[[Page 68140]]
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. You may also register online at https://
www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-23425 Filed 12-3-07; 8:45 am]
BILLING CODE 6717-01-P