TransCanada Power Marketing Ltd., Complainant v. ISO New England Inc., Respondent; Notice of Complaint Filing, 67601 [E7-23148]

Download as PDF Federal Register / Vol. 72, No. 229 / Thursday, November 29, 2007 / Notices Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on December 4, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–23150 Filed 11–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–12–000] PJM Industrial Customer Coalition, Complainant v. PJM Interconnection, L.L.C., Respondent; Notice of Complaint Filing rmajette on PROD1PC64 with NOTICES November 21, 2007. Take notice that on November 20, 2007, pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824e, and Rule 206 of the Rules of Practice and Procedure, 18 CFR 385.206, PJM Industrial Customer Coalition (Complainant) filed a formal complaint against PJM Interconnection, L.L.C. (Respondent) alleging that certain provisions in the Respondent’s tariff, that would ‘‘sunset’’ the existing payments for customer curtailment when locational marginal pricing exceeds a particular threshold, currently $75/MWh, are unjust and unreasonable. The Complainant has requested fast track processing. The Complainant states that a copy of the complaint has been served on all potentially affected parties. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and VerDate Aug<31>2005 14:52 Nov 28, 2007 Jkt 211001 interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on December 6, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–23149 Filed 11–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–11–000] TransCanada Power Marketing Ltd., Complainant v. ISO New England Inc., Respondent; Notice of Complaint Filing November 21, 2007. Take notice that on November 19, 2007, pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e, and Rule 206 of the Rules of Practice and Procedure, 18 CFR 385.206, TransCanada Power Marketing Ltd. (Complainant) filed a formal complaint against ISO New England Inc. (Respondent) alleging that the Respondent de-list a portion of the Complainant’s capacity, making that capacity ineligible to participate in the first Forward Capacity Auction (FCA) in the Forward Capacity Market (FCM) in contradiction of the rules that the Commission approved for qualifying capacity for the FCA for New England in Devon Power LLC, 115 FERC ¶ 61,340, order on reh’g, 117 FER ¶ 61,133 (2006). The Complainant is requesting the Commission to order the Respondent to accept the Complainant’s composite designation of 6.222 MW of qualified capacity as a Self-Supplied FCA Resource for participation in the first Forward Capacity Auction PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 67601 conducted in furtherance of the FCM that has been established for New England. The Complainant has requested fast track processing. The Complainant states that a copy of the complaint has been served on the Respondent. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on December 3, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–23148 Filed 11–28–07; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\29NON1.SGM 29NON1

Agencies

[Federal Register Volume 72, Number 229 (Thursday, November 29, 2007)]
[Notices]
[Page 67601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-23148]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL08-11-000]


TransCanada Power Marketing Ltd., Complainant v. ISO New England 
Inc., Respondent; Notice of Complaint Filing

November 21, 2007.
    Take notice that on November 19, 2007, pursuant to sections 206 and 
306 of the Federal Power Act, 16 U.S.C. 824e and 825e, and Rule 206 of 
the Rules of Practice and Procedure, 18 CFR 385.206, TransCanada Power 
Marketing Ltd. (Complainant) filed a formal complaint against ISO New 
England Inc. (Respondent) alleging that the Respondent de-list a 
portion of the Complainant's capacity, making that capacity ineligible 
to participate in the first Forward Capacity Auction (FCA) in the 
Forward Capacity Market (FCM) in contradiction of the rules that the 
Commission approved for qualifying capacity for the FCA for New England 
in Devon Power LLC, 115 FERC ] 61,340, order on reh'g, 117 FER ] 61,133 
(2006). The Complainant is requesting the Commission to order the 
Respondent to accept the Complainant's composite designation of 6.222 
MW of qualified capacity as a Self-Supplied FCA Resource for 
participation in the first Forward Capacity Auction conducted in 
furtherance of the FCM that has been established for New England.
    The Complainant has requested fast track processing.
    The Complainant states that a copy of the complaint has been served 
on the Respondent.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on December 3, 2007.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-23148 Filed 11-28-07; 8:45 am]