FFP Project 52, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 65722-65723 [E7-22827]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
65722
Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices
in the docket number field to access the
documents. For assistance, contact
FERC Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. Copies are also
available for inspection and
reproduction at the addresses in
paragraph h.
Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the applicants’ PADs and
Commission staff’s Scoping Document 1
(SD1), as well as study requests. All
comments on the PADs and SD1, and
study requests should be sent to the
addresses above in paragraph h. In
addition, all comments on the PADs and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential applications (original and
eight copies) must be filed with the
Commission at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
All filings with the Commission must
include, on the first page, the project
name (Scotland Hydroelectric Project)
and number (‘‘P–2662–009’’ for
FirstLight, and/or ‘‘P–12968–000’’ for
Norwich Public Utilities), and bear the
heading ‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PADs or SD1, and any agency
requesting cooperating status must do so
by December 31, 2007.
Comments on the PADs and SD1,
study requests, requests for cooperating
agency status, and other permissible
forms of communication with the
Commission or its staff may be filed
electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
The Commission strongly encourages
electronic filings.
p. At this time, Commission staff
intends to prepare an environmental
assessment (EA), in accordance with the
National Environmental Policy Act
(NEPA). The meetings outlined below
will satisfy the scoping requirements of
NEPA.
VerDate Aug<31>2005
16:16 Nov 21, 2007
Jkt 214001
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The evening meeting is primarily
for receiving input from the public,
while the daytime meeting will focus on
resource agency, Indian tribes, and nongovernmental organization concerns.
We invite all interested individuals,
organizations, and agencies to attend
one or both of the meetings, and to
assist staff in identifying particular
study needs, as well as the scope of
environmental issues to be addressed in
the environmental document. The times
and locations of these meetings are as
follows:
Evening Scoping Meeting:
Date: Monday, November 19, 2007.
Time: 7 p.m.
Location: Windham High School, 355
High Street, Willimantic, CT 06226,
Phone: (860) 465–2480.
Daytime Scoping Meeting:
Date: Tuesday, November 20, 2007.
Time: 8 a.m.
Location: Windham Town Hall, 979
Main Street, Willimantic, CT 06226,
Phone: (860) 465–3000.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list on October
30, 2007. Copies of SD1 will be
available at the scoping meetings, or
may be viewed on the Web at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Follow the directions for accessing
information in paragraph n. Based on all
oral and written comments, a Scoping
Document 2 (SD2) may be issued. SD2
will include any revisions to the list of
issues outlined in SD1 that are
identified during the scoping process,
and may include a revised process plan
and schedule.
Site Visit
The potential applicants and
Commission staff will conduct a site
visit of the project on Monday,
November 19, 2007, starting at 1p.m. All
participants should meet at the Scotland
Project dam, located on Station Road,
Windham, CT, 06280. All participants
are responsible for their own
transportation. Anyone with questions
about the site visit should contact Ms.
Rosemary Plue at (860) 350–3607.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PADs in
preparation for the scoping meetings.
Instructions on how to obtain copies of
the PADs and SD1 are included in item
n, above.
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22822 Filed 11–21–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12939–000]
FFP Project 52, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
November 14, 2007.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: P–12939–000.
c. Date Filed: August 6, 2007.
d. Applicant: FFP Project 52, LLC.
e. Name of the Project: Gale Light
Project.
f. Location: The project would be
located on the Mississippi River in Scott
and Cape Girardeau Counties, Missouri
and Alexander County, Illinois. The
project uses no dam or impoundment.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicants Contact: Mr. Dan Irvin,
FFP Project 52, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
E:\FR\FM\23NON1.SGM
23NON1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices
i. FERC Contact: Patricia W. Gillis,
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12939–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would consist of: (1)
1700 proposed 20-kilowatt Free Flow
generating units having a total installed
capacity of 34-megawatts, (2) a proposed
transmission line, and (3) appurtenant
facilities. The project would have an
average annual generation of 148.92gigawatt-hours and be sold to a local
utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
VerDate Aug<31>2005
16:16 Nov 21, 2007
Jkt 214001
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
65723
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
t. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22827 Filed 11–21–07; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 72, Number 225 (Friday, November 23, 2007)]
[Notices]
[Pages 65722-65723]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22827]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12939-000]
FFP Project 52, LLC; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
November 14, 2007.
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: P-12939-000.
c. Date Filed: August 6, 2007.
d. Applicant: FFP Project 52, LLC.
e. Name of the Project: Gale Light Project.
f. Location: The project would be located on the Mississippi River
in Scott and Cape Girardeau Counties, Missouri and Alexander County,
Illinois. The project uses no dam or impoundment.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicants Contact: Mr. Dan Irvin, FFP Project 52, LLC, 69
Bridge Street, Manchester, MA 01944, phone (978) 232-3536.
[[Page 65723]]
i. FERC Contact: Patricia W. Gillis, (202) 502-8735.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12939-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would consist of:
(1) 1700 proposed 20-kilowatt Free Flow generating units having a total
installed capacity of 34-megawatts, (2) a proposed transmission line,
and (3) appurtenant facilities. The project would have an average
annual generation of 148.92-gigawatt-hours and be sold to a local
utility.
l. Location of Application: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
o. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
p. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
s. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Federal Energy Regulatory Commission, at the above-mentioned address. A
copy of any notice of intent, competing application or motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
t. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-22827 Filed 11-21-07; 8:45 am]