Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices that is on file with the Commission and open to public inspection. The instant filing may be also viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding the application should be directed to: Richard L. Derryberry, Director of Regulatory Affairs, El Paso Natural Gas Company, P.O. Box 1087, Colorado Springs, Colorado 80944 at (719) 520– 3782 or by fax at (719) 667–7534. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: December 6, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–22801 Filed 11–21–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 65713 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG07–75–000, EG07–76–000, EG07–77–000 EG07–78–000, EG07–79–000] FH Opco LLC, Logan Wind Energy, LLC, Airtricity Champion Wind Farm, LLC, Airtricity Roscoe Wind Farm, LLC, NRG Texas Power LLC; Notice of Effectiveness of Exempt Wholesale Generator Status November 14, 2007. Take notice that during the month of October 2007, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Kimberly D. Bose, Secretary. [FR Doc. E7–22825 Filed 11–21–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–32–003] Gulf South Pipeline Company, LP; Notice of Amendment November 14, 2007. Take notice that on October 31, 2007, Gulf South Pipeline Company, LP (Gulf South), filed in Docket No. CP07–32– 003, an application pursuant to section 7(c) of the Natural Gas Act (NGA) to amend the September 28, 2007 Commission Order (120 FERC ¶ 61,291 (2007)) issuing Gulf South a certificate to construct and operate its Southeast Expansion Project. Specifically, to support the authorized Southeast Expansion Project services, Gulf South states that due to changing market conditions, it has identified that additional operational efficiencies could be gained by facility modifications, and is now proposing the construction of two smaller sized compressor units at the new Delhi Compressor Station, rather than the four larger units authorized in the September 28 Order, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The instant filing may be also viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the E:\FR\FM\23NON1.SGM 23NON1

Agencies

[Federal Register Volume 72, Number 225 (Friday, November 23, 2007)]
[Notices]
[Page 65713]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22825]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EG07-75-000, EG07-76-000, EG07-77-000 EG07-78-000, EG07-
79-000]


FH Opco LLC, Logan Wind Energy, LLC, Airtricity Champion Wind 
Farm, LLC, Airtricity Roscoe Wind Farm, LLC, NRG Texas Power LLC; 
Notice of Effectiveness of Exempt Wholesale Generator Status

November 14, 2007.
    Take notice that during the month of October 2007, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

Kimberly D. Bose,
Secretary.
[FR Doc. E7-22825 Filed 11-21-07; 8:45 am]
BILLING CODE 6717-01-P