FH Opco LLC, Logan Wind Energy, LLC, Airtricity Champion Wind Farm, LLC, Airtricity Roscoe Wind Farm, LLC, NRG Texas Power LLC; Notice of Effectiveness of Exempt Wholesale Generator Status, 65713 [E7-22825]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices
that is on file with the Commission and
open to public inspection. The instant
filing may be also viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call (866)
208–3676 or TTY, (202) 502–8659.
Any questions regarding the
application should be directed to:
Richard L. Derryberry, Director of
Regulatory Affairs, El Paso Natural Gas
Company, P.O. Box 1087, Colorado
Springs, Colorado 80944 at (719) 520–
3782 or by fax at (719) 667–7534.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the below listed
comment date, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
VerDate Aug<31>2005
16:16 Nov 21, 2007
Jkt 214001
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: December 6, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22801 Filed 11–21–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
65713
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EG07–75–000, EG07–76–000,
EG07–77–000 EG07–78–000, EG07–79–000]
FH Opco LLC, Logan Wind Energy,
LLC, Airtricity Champion Wind Farm,
LLC, Airtricity Roscoe Wind Farm,
LLC, NRG Texas Power LLC; Notice of
Effectiveness of Exempt Wholesale
Generator Status
November 14, 2007.
Take notice that during the month of
October 2007, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22825 Filed 11–21–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–32–003]
Gulf South Pipeline Company, LP;
Notice of Amendment
November 14, 2007.
Take notice that on October 31, 2007,
Gulf South Pipeline Company, LP (Gulf
South), filed in Docket No. CP07–32–
003, an application pursuant to section
7(c) of the Natural Gas Act (NGA) to
amend the September 28, 2007
Commission Order (120 FERC ¶ 61,291
(2007)) issuing Gulf South a certificate
to construct and operate its Southeast
Expansion Project. Specifically, to
support the authorized Southeast
Expansion Project services, Gulf South
states that due to changing market
conditions, it has identified that
additional operational efficiencies could
be gained by facility modifications, and
is now proposing the construction of
two smaller sized compressor units at
the new Delhi Compressor Station,
rather than the four larger units
authorized in the September 28 Order,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection.
The instant filing may be also viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
E:\FR\FM\23NON1.SGM
23NON1
Agencies
[Federal Register Volume 72, Number 225 (Friday, November 23, 2007)]
[Notices]
[Page 65713]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22825]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EG07-75-000, EG07-76-000, EG07-77-000 EG07-78-000, EG07-
79-000]
FH Opco LLC, Logan Wind Energy, LLC, Airtricity Champion Wind
Farm, LLC, Airtricity Roscoe Wind Farm, LLC, NRG Texas Power LLC;
Notice of Effectiveness of Exempt Wholesale Generator Status
November 14, 2007.
Take notice that during the month of October 2007, the status of
the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E7-22825 Filed 11-21-07; 8:45 am]
BILLING CODE 6717-01-P