Combined Notice of Filings #1, 65322-65323 [E7-22652]
Download as PDF
65322
Federal Register / Vol. 72, No. 223 / Tuesday, November 20, 2007 / Notices
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E7–22651 Filed 11–19–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
pwalker on PROD1PC71 with NOTICES
November 9, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER01–205–023,
ER98–2640–021, ER98–4590–019,
ER99–1610–027.
Applicants: Xcel Energy Services Inc.;
Northern States Power Company and
Northern States Power Company
(Wisconsin); Public Service Company of
VerDate Aug<31>2005
17:01 Nov 19, 2007
Jkt 214001
Colorado; Southwestern Public Service
Company.
Description: Xcel Energy Services Inc
et. al; submit a change in status report
relating to the market-based rate
authority.
Filed Date: 10/30/2007.
Accession Number: 20071105–0148.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 20, 2007.
Docket Numbers: ER03–583–007;
ER03–681–005; ER03–682–006; ER03–
744–005.
Applicants: Entergy Services, Inc.
Description: Entergy Services Inc on
behalf of Entergy Operating Companies
et. al, submits its compliance filing.
Filed Date: 11/06/2007.
Accession Number: 20071108–0021.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 27, 2007.
Docket Numbers: ER05–644–000.
Applicants: PSEG Energy Resources &
Trade LLC; PSEG Fossil LLC.
Description: Informational Filing
regarding Planned Project Investments
of PSEG Fossil LLC, and PSEG Energy
Resources & Trade LLC et. al.
Filed Date: 11/05/2007.
Accession Number: 20071105–5066.
Comment Date: 5 p.m. Eastern Time
on Monday, November 26, 2007.
Docket Numbers: ER07–1221–003.
Applicants: Rensselaer Cogeneration
LLC.
Description: Rensselaer Cogeneration
LLC submits a notice of succession and
triennial update market power analysis.
Filed Date: 11/06/2007.
Accession Number: 20071108–0273.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 27, 2007.
Docket Numbers: ER07–1278–002.
Applicants: Alpha Energy Master, Ltd.
Description: Alpha Energy Master, Ltd
submits Substitute Original Sheet No. 1
and 2 of a tariff.
Filed Date: 11/06/2007.
Accession Number: 20071107–0116.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 27, 2007.
Docket Numbers: ER08–2–000, ER08–
196–000.
Applicants: Avista Corporation.
Description: Avista Corp and
NorthWestern Corp submits a nonconforming Long-Term Service
Agreements, FERC Electric Rate
Schedule 484 and FERC Electric Rate
Schedule 248.
Filed Date: 10/01/2007.
Accession Number: 20071003–0033.
Comment Date: 5 p.m. Eastern Time
on Friday, November 23, 2007.
Docket Numbers: ER08–190–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc
submits its informational filing for
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
qualification in the Forward Capacity
Market.
Filed Date: 11/06/2007.
Accession Number: 20071108–0279.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 21, 2007.
Docket Numbers: ER08–191–000.
Applicants: Aquila, Inc.
Description: Aquila, Inc submits an
Amended and Restated Coordinating
Agreement for the Cooper-Fairport—St
Joseph 354 kV Interconnection with
Associated Electric Coop, Inc.
Filed Date: 11/06/2007.
Accession Number: 20071108–0272.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 27, 2007.
Docket Numbers: ER08–192–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits a Petition for Approval of
Agreement.
Filed Date: 11/06/2007.
Accession Number: 20071108–0271.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 27, 2007.
Docket Numbers: ER08–195–000.
Applicants: ISO New England Inc.
Description: Filing of ISO New
England, Inc of Revised Tariff Sheets for
Recovery of its 2008 Administrative
Costs.
Filed Date: 10/31/2007.
Accession Number: 20071102–0121.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 21, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
Time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
E:\FR\FM\20NON1.SGM
20NON1
Federal Register / Vol. 72, No. 223 / Tuesday, November 20, 2007 / Notices
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Acting Deputy Director.
[FR Doc. E7–22652 Filed 11–19–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2237–017]
that issuing a new license for the
project, with appropriate environmental
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the date of this notice and
should be addressed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please affix Project No. 2237–017 to all
comments. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘e-Filing’’ link. Project No. P–2237–017.
For further information, please
contact Janet Hutzel at (202) 502–8675
or at janet.hutzel@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22621 Filed 11–19–07; 8:45 am]
Georgia Power Company; Notice of
Availability of Environmental
Assessment
BILLING CODE 6717–01–P
pwalker on PROD1PC71 with NOTICES
November 9, 2007.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a New Major License for the Morgan
Falls Hydroelectric Project.
The Morgan Falls Project is located in
the metropolitan city of Atlanta area on
the Chattahoochee River, at river mile
312.6, and about 36 miles downstream
from the U.S. Army Corps of Engineers’
Buford dam (Lake Sidney Lanier) in
Cobb and Fulton Counties, Georgia. The
project occupies about 14.4 acres of
federal lands within the Chattahoochee
River National Recreation Area managed
by the National Park Service. Staff has
prepared an Environmental Assessment
(EA) for the project.
In the EA Commission, staff analyzed
the potential environmental effects of
relicensing the project and concludes
VerDate Aug<31>2005
18:20 Nov 19, 2007
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–405–000]
Texas Gas Transmission, LLC; Notice
of Availability of the Environmental
Assement for the Proposed Phase 3
Storage Expansion Project
November 13, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
by Texas Gas Transmission, LLC (Texas
Gas) in the above-referenced docket.
Texas Gas proposes to increase the
storage capacity of its existing Midland
Storage Field by constructing facilities
in Hanson and Muhlenberg Counties,
Kentucky.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
65323
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act of 1969. The
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The EA assesses the potential
environmental effects of the
construction and operation of the
proposed Phase 3 Storage Expansion
Project, which includes the following
wells, pipeline facilities, and
expansion/modifications of existing
compressor stations:
Midland Gas Storage Field
• Seven new injection/withdrawal
wells;
• Six new well pads;
• 80-foot-tall radio tower on an 8-foot
by 8-foot concrete pad and 6-foot by 6foot shelter;
Pipeline Facilities
• 10.5 miles of 30-inch-diameter
pipeline from Texas Gas’ Hanson
Compressor Station to its Midland III
Compressor Station;
• Construct 2,900 feet of 16-inchdiameter pipeline extending Texas Gas
existing E–9 Lateral pipeline;
• Construct 8 well laterals ranging
from 8 to 12 inches in diameter and 450
to 3,000 feet in length;
Midland III Compressor Station
• A new turbine/compressor
building;
• A new 5,488 horsepower turbinedriven compressor, including ancillary
equipment;
• Control system modifications to
allow two existing 1,250-horsepower
electric-driven compressors to operate at
1,500-horsepower;
• Retirement of two 2,000horsepower reciprocating compressor
units
• Piping modifications and
appurtenant facilities;
Slaughters Compressor Station
• Modification of the existing 12,090horsepower turbine-driven compressor
for a new suction and discharge
pressure; The purpose of the proposed
Phase 3 Storage Expansion Project is to
expand the daily withdrawal and
seasonal storage capability of the
Midland Gas Storage Field located in
Muhlenberg County, Kentucky.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 72, Number 223 (Tuesday, November 20, 2007)]
[Notices]
[Pages 65322-65323]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22652]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
November 9, 2007.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER01-205-023, ER98-2640-021, ER98-4590-019, ER99-
1610-027.
Applicants: Xcel Energy Services Inc.; Northern States Power
Company and Northern States Power Company (Wisconsin); Public Service
Company of Colorado; Southwestern Public Service Company.
Description: Xcel Energy Services Inc et. al; submit a change in
status report relating to the market-based rate authority.
Filed Date: 10/30/2007.
Accession Number: 20071105-0148.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 20, 2007.
Docket Numbers: ER03-583-007; ER03-681-005; ER03-682-006; ER03-744-
005.
Applicants: Entergy Services, Inc.
Description: Entergy Services Inc on behalf of Entergy Operating
Companies et. al, submits its compliance filing.
Filed Date: 11/06/2007.
Accession Number: 20071108-0021.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 27, 2007.
Docket Numbers: ER05-644-000.
Applicants: PSEG Energy Resources & Trade LLC; PSEG Fossil LLC.
Description: Informational Filing regarding Planned Project
Investments of PSEG Fossil LLC, and PSEG Energy Resources & Trade LLC
et. al.
Filed Date: 11/05/2007.
Accession Number: 20071105-5066.
Comment Date: 5 p.m. Eastern Time on Monday, November 26, 2007.
Docket Numbers: ER07-1221-003.
Applicants: Rensselaer Cogeneration LLC.
Description: Rensselaer Cogeneration LLC submits a notice of
succession and triennial update market power analysis.
Filed Date: 11/06/2007.
Accession Number: 20071108-0273.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 27, 2007.
Docket Numbers: ER07-1278-002.
Applicants: Alpha Energy Master, Ltd.
Description: Alpha Energy Master, Ltd submits Substitute Original
Sheet No. 1 and 2 of a tariff.
Filed Date: 11/06/2007.
Accession Number: 20071107-0116.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 27, 2007.
Docket Numbers: ER08-2-000, ER08-196-000.
Applicants: Avista Corporation.
Description: Avista Corp and NorthWestern Corp submits a non-
conforming Long-Term Service Agreements, FERC Electric Rate Schedule
484 and FERC Electric Rate Schedule 248.
Filed Date: 10/01/2007.
Accession Number: 20071003-0033.
Comment Date: 5 p.m. Eastern Time on Friday, November 23, 2007.
Docket Numbers: ER08-190-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc submits its informational filing
for qualification in the Forward Capacity Market.
Filed Date: 11/06/2007.
Accession Number: 20071108-0279.
Comment Date: 5 p.m. Eastern Time on Wednesday, November 21, 2007.
Docket Numbers: ER08-191-000.
Applicants: Aquila, Inc.
Description: Aquila, Inc submits an Amended and Restated
Coordinating Agreement for the Cooper-Fairport--St Joseph 354 kV
Interconnection with Associated Electric Coop, Inc.
Filed Date: 11/06/2007.
Accession Number: 20071108-0272.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 27, 2007.
Docket Numbers: ER08-192-000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc submits a Petition for Approval of
Agreement.
Filed Date: 11/06/2007.
Accession Number: 20071108-0271.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 27, 2007.
Docket Numbers: ER08-195-000.
Applicants: ISO New England Inc.
Description: Filing of ISO New England, Inc of Revised Tariff
Sheets for Recovery of its 2008 Administrative Costs.
Filed Date: 10/31/2007.
Accession Number: 20071102-0121.
Comment Date: 5 p.m. Eastern Time on Wednesday, November 21, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern Time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an
[[Page 65323]]
eRegistration account using the eRegistration link. Select the eFiling
link to log on and submit the intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Acting Deputy Director.
[FR Doc. E7-22652 Filed 11-19-07; 8:45 am]
BILLING CODE 6717-01-P