PS Energy Group, Inc.; Notice of Issuance of Order, 65318-65319 [E7-22625]

Download as PDF 65318 Federal Register / Vol. 72, No. 223 / Tuesday, November 20, 2007 / Notices using PDF, call the U.S. Government Printing Office (GPO), toll free, at 1– 888–293–6498; or in the Washington, DC, area at (202) 512–1530. Note: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available on GPO Access at: https://www.gpoaccess.gov/nara/ index.html. (Catalog of Federal Domestic Assistance Number 84.144 Migrant Education Coordination Program). Program Authority: 20 U.S.C. 6398(d). Dated: November 5, 2007. Kerri L. Briggs, Assistant Secretary for Elementary and Secondary Education. [FR Doc. E7–22680 Filed 11–19–07; 8:45 am] BILLING CODE 4000–01–P This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time November 15, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–22618 Filed 11–19–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. CP06–416–004] [Docket No. ER07–1378–000] Northwest Pipeline GP; Notice of Compliance Filing Providence Heights Wind, LLC; Notice of Issuance of Order November 9, 2007. November 13, 2007. Take notice that on October 31, 2007, Northwest Pipeline GP (Northwest) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff sheets, with an effective date of January 1, 2008: Providence Heights Wind, LLC (Providence) filed an application for market-based rate authority, with an accompanying rate schedule. The proposed market-based rate schedule provides for the sale of energy, capacity and ancillary services at market-based rates. Providence also requested waivers of various Commission regulations. In particular, Providence requested that the Commission grant blanket approval under 18 C.F.R. Part 34 of all future issuances of securities and assumptions of liability by Providence. On November 9, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development-West, granted the requests for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by Providence, should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). pwalker on PROD1PC71 with NOTICES Seventeenth Revised Sheet No. 7 First Revised Sheet No. 7–A Northwest states that the filing is being made in compliance with the Commission’s order issued on February 5, 2007 in Docket No. CP06–416–000. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Aug<31>2005 17:01 Nov 19, 2007 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Notice is hereby given that the deadline for filing protests is December 10, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, Providence is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Providence, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Providence’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–22623 Filed 11–19–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER07–1303–000; ER07–1303– 001; ER07–1303–002] PS Energy Group, Inc.; Notice of Issuance of Order November 13, 2007. PS Energy Group (PS Energy) filed an application for market-based rate authority, with an accompanying rate schedule. The proposed market-based rate schedule provides for the sale of energy and capacity at market-based rates. PS Energy also requested waivers of various Commission regulations. In particular, PS Energy requested that the Commission grant blanket approval under 18 CFR Part 34 of all future E:\FR\FM\20NON1.SGM 20NON1 pwalker on PROD1PC71 with NOTICES Federal Register / Vol. 72, No. 223 / Tuesday, November 20, 2007 / Notices issuances of securities and assumptions of liability by PS Energy. On November 9, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development-West, granted the requests for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by PS Energy, should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, D.C. 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is December 10, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, PS Energy is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of PS Energy, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of PS Energy’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–22625 Filed 11–19–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:01 Nov 19, 2007 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05–392–001] Texas Eastern Transmission, LP; Notice of Application November 13, 2007. Take notice that on November 1, 2007, Texas Eastern Transmission, LP (‘‘Texas Eastern’’), 5400 Westheimer Court, Houston, Texas 77056–5310, filed with the Federal Energy Regulatory Commission an application under section 7 of the Natural Gas Act to amend the Certificate of Public Convenience and Necessity issued to Texas Eastern on February 22, 2006, for the Accident Storage Enhancement Project, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Any questions regarding this application should be directed to Garth Johnson, Director, Certificates and Reporting, Texas Eastern Transmission, LP, 5400 Westheimer Court, Houston, Texas 77251 at (713) 627–5415. Pursuant to section 157.9 of the Commission’s rules, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA will remain in place PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 65319 to be used as a warehouse facility for pipe, equipment and supplies. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically E:\FR\FM\20NON1.SGM 20NON1

Agencies

[Federal Register Volume 72, Number 223 (Tuesday, November 20, 2007)]
[Notices]
[Pages 65318-65319]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22625]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER07-1303-000; ER07-1303-001; ER07-1303-002]


PS Energy Group, Inc.; Notice of Issuance of Order

November 13, 2007.
    PS Energy Group (PS Energy) filed an application for market-based 
rate authority, with an accompanying rate schedule. The proposed 
market-based rate schedule provides for the sale of energy and capacity 
at market-based rates. PS Energy also requested waivers of various 
Commission regulations. In particular, PS Energy requested that the 
Commission grant blanket approval under 18 CFR Part 34 of all future

[[Page 65319]]

issuances of securities and assumptions of liability by PS Energy.
    On November 9, 2007, pursuant to delegated authority, the Director, 
Division of Tariffs and Market Development-West, granted the requests 
for blanket approval under Part 34 (Director's Order). The Director's 
Order also stated that the Commission would publish a separate notice 
in the Federal Register establishing a period of time for the filing of 
protests. Accordingly, any person desiring to be heard concerning the 
blanket approvals of issuances of securities or assumptions of 
liability by PS Energy, should file a protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure. 18 CFR 385.211, 385.214 (2004).
    Notice is hereby given that the deadline for filing protests is 
December 10, 2007.
    Absent a request to be heard in opposition to such blanket 
approvals by the deadline above, PS Energy is authorized to issue 
securities and assume obligations or liabilities as a guarantor, 
indorser, surety, or otherwise in respect of any security of another 
person; provided that such issuance or assumption is for some lawful 
object within the corporate purposes of PS Energy, compatible with the 
public interest, and is reasonably necessary or appropriate for such 
purposes.
    The Commission reserves the right to require a further showing that 
neither public nor private interests will be adversely affected by 
continued approvals of PS Energy's issuance of securities or 
assumptions of liability.
    Copies of the full text of the Director's Order are available from 
the Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426. The Order may also be viewed on the Commission's 
Web site at https://www.ferc.gov, using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
filed to access the document. Comments, protests, and interventions may 
be filed electronically via the internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-22625 Filed 11-19-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.