Download as PDF pwalker on PROD1PC71 with NOTICES 64208 Federal Register / Vol. 72, No. 220 / Thursday, November 15, 2007 / Notices Company, LLC designated as First Revised Agreement 101. Filed Date: 10/30/2007. Accession Number: 20071101–0084. Comment Date: 5 p.m. Eastern Time on Tuesday, November 20, 2007. Docket Numbers: ER08–99–000. Applicants: MidAmerican Energy Company. Description: MidAmerican Energy Company submits an Engineering and Procurement Agreement with Generation Supply Function of MidAmerican (Interconnection Customer) and the Transmission Function of MidAmerican. Filed Date: 10/30/2007. Accession Number: 20071101–0083. Comment Date: 5 p.m. Eastern Time on Tuesday, November 20, 2007. Docket Numbers: ER08–100–000. Applicants: Sempra Energy Trading, LLC. Description: Sempra Energy Trading, LLC submits a notice of succession that reflects the name change that became effective 9/30/07 and Fourth Revised Rate Schedule 1, et al. Filed Date: 10/30/2007. Accession Number: 20071101–0082. Comment Date: 5 p.m. Eastern Time on Tuesday, November 20, 2007. Docket Numbers: ER08–108–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits revisions to its Open Access Transmission Tariff to reflect updated of annual values used in calculation of offer caps for all pivotal resources. Filed Date: 10/29/2007. Accession Number: 20071101–0099. Comment Date: 5 p.m. Eastern Time on Monday, November 19, 2007. Docket Numbers: ER08–109–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits proposed revisions to its Open Access Transmission and Energy Markets Tariff on Transition to Auction Revenue Rights, etc. Filed Date: 10/30/2007. Accession Number: 20071101–0097. Comment Date: 5 p.m. Eastern Time on Tuesday, November 20, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously VerDate Aug<31>2005 19:50 Nov 14, 2007 Jkt 214001 intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Acting Deputy Secretary. [FR Doc. E7–22276 Filed 11–14–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–447–000] Northern Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Ogden Compressor Replacement Project and Request for Comments on Environmental Issues November 7, 2007. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Ogden Compressor Replacement Project involving the abandonment of two compressor units by Northern Natural Gas Company (Northern) from an existing compressor station in Boone County, Iowa, and installation of a compressor unit at an existing compressor station within a gas storage field in Dallas County, Iowa.1 This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ was attached to the project notice that Northern provided to landowners with a residence within 1⁄2mile of the proposed facilities. This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https://www.ferc.gov). Summary of the Proposed Project Northern is proposing to optimize its ability to transport gas to and from the Redfield Gas Storage Field in Dallas County, Iowa by decreasing the amount of horsepower (hp) at the Ogden Compressor Station (Ogden) in Boone County, Iowa, and increasing the amount of hp at the Redfield Compressor Station (Redfield) in Dallas County, Iowa. Northern is proposing to abandon-in-place two 1,600-hp horizontal reciprocating compressor units at Ogden and install one 1,400-hp vertical reciprocating compressor unit at Redfield. The location of the project facilities is shown in Appendix 1.2 1 Northern’s application was filed with the Commission under section 7 of the Natural Gas Act. 2 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices, other than Appendix 1 (maps), are available on the Commission’s Web site at the Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\15NON1.SGM 15NON1 Federal Register / Vol. 72, No. 220 / Thursday, November 15, 2007 / Notices Land Requirements for Construction Construction of the proposed facilities would require about 2.1 acres of land within the existing compressor station yards. The EA Process pwalker on PROD1PC71 with NOTICES The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping’’. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, the Commission staff requests public comments on the scope of the issues to address in the EA. All comments received are considered during the preparation of the EA. State and local government representatives are encouraged to notify their constituents of this proposed action and encourage them to comment on their areas of concern. In the EA we 3 will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils. • Land use. • Water resources, fisheries, and wetlands. • Cultural resources. • Vegetation and wildlife. • Air quality and noise. • Endangered and threatened species. • Hazardous waste. • Public safety. We will also evaluate possible alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to federal, state, and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commission’s official service list for ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary refer to the last page of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. 3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental staff of the Office of Energy Projects (OEP). VerDate Aug<31>2005 19:50 Nov 14, 2007 Jkt 214001 this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the public participation section below. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. By becoming a commentor, your concerns will be addressed in the EA and considered by the Commission. You should focus on the potential environmental effects of the proposal, alternatives to the proposal, and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426. • Label one copy of the comments for the attention of Gas Branch 3. • Reference Docket No. CP07–447– 000. • Mail your comments so that they will be received in Washington, DC on or before December 12, 2007. The Commission strongly encourages electronic filing of any comments or interventions or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link and the link to the User’s Guide. Before you can file comments you will need to create a free account which can be created on-line. We may mail the EA for comment. If you are interested in receiving it, please return the Information Request (Appendix 3). If you do not return the Information Request, you will be taken off the mailing list. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding, or ‘‘intervenor’’. To become an intervenor you must file a motion to intervene according to Rule 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.214). Intervenors have the right to seek rehearing of the Commission’s decision. Motions to PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 64209 Intervene should be electronically submitted using the Commission’s eFiling system at https://www.ferc.gov. Persons without Internet access should send an original and 14 copies of their motion to the Secretary of the Commission at the address indicated previously. Persons filing Motions to Intervene on or before the comment deadline indicated above must send a copy of the motion to the Applicant. All filings, including late interventions, submitted after the comment deadline must be served on the Applicant and all other intervenors identified on the Commission’s service list for this proceeding. Persons on the service list with e-mail addresses may be served electronically; others must be served a hard copy of the filing. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your environmental comments considered. Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. By this notice we are also asking governmental agencies, especially those in Appendix 2, to express their interest in becoming cooperating agencies for the preparation of the EA. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all E:\FR\FM\15NON1.SGM 15NON1 64210 Federal Register / Vol. 72, No. 220 / Thursday, November 15, 2007 / Notices formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E7–22291 Filed 11–14–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12934–000; FFP Project 48, LLC] Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests pwalker on PROD1PC71 with NOTICES November 6, 2007. Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: P–12934–000. c. Date Filed: August 6, 2007. d. Applicant: FFP Project 48, LLC. e. Name of the Project: New Madrid Bend Project. f. Location: The project would be located on the Mississippi River in New Madrid County, Missouri and Fulton County, Kentucky. The project uses no dam or impoundment. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicants Contact: Mr. Dan Irvin, FFP Project 48, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. i. FERC Contact: Patricia W. Gillis, (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and. the instructions on the Commission’s Web VerDate Aug<31>2005 19:50 Nov 14, 2007 Jkt 214001 site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P–12934–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The proposed project would consist of: (1) 5350 proposed 20-kilowatt Free Flow generating units having a total installed capacity of 107-megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The project would have an average annual generation of 468.66-gigawatt-hours and be sold to a local utility. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform to 18 CFR 4.30 and 4.36. o. Competing Development Application—Any qualified PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform to 18 CFR 4.30 and 4.36. p. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title E:\FR\FM\15NON1.SGM 15NON1

Agencies

[Federal Register Volume 72, Number 220 (Thursday, November 15, 2007)]
[Notices]
[Pages 64208-64210]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22291]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. CP07-447-000]


Northern Natural Gas Company; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Ogden Compressor Replacement 
Project and Request for Comments on Environmental Issues

November 7, 2007.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Ogden Compressor Replacement 
Project involving the abandonment of two compressor units by Northern 
Natural Gas Company (Northern) from an existing compressor station in 
Boone County, Iowa, and installation of a compressor unit at an 
existing compressor station within a gas storage field in Dallas 
County, Iowa.\1\ This EA will be used by the Commission in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
---------------------------------------------------------------------------

    \1\ Northern's application was filed with the Commission under 
section 7 of the Natural Gas Act.
---------------------------------------------------------------------------

    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' was attached to the 
project notice that Northern provided to landowners with a residence 
within \1/2\-mile of the proposed facilities. This fact sheet addresses 
a number of typically asked questions, including the use of eminent 
domain and how to participate in the Commission's proceedings. It is 
available for viewing on the FERC Internet Web site (https://
www.ferc.gov).

Summary of the Proposed Project

    Northern is proposing to optimize its ability to transport gas to 
and from the Redfield Gas Storage Field in Dallas County, Iowa by 
decreasing the amount of horsepower (hp) at the Ogden Compressor 
Station (Ogden) in Boone County, Iowa, and increasing the amount of hp 
at the Redfield Compressor Station (Redfield) in Dallas County, Iowa. 
Northern is proposing to abandon-in-place two 1,600-hp horizontal 
reciprocating compressor units at Ogden and install one 1,400-hp 
vertical reciprocating compressor unit at Redfield. The location of the 
project facilities is shown in Appendix 1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of all appendices, other 
than Appendix 1 (maps), are available on the Commission's Web site 
at the ``eLibrary'' link or from the Commission's Public Reference 
Room, 888 First Street, NE., Washington, DC 20426, or call (202) 
502-8371. For instructions on connecting to eLibrary refer to the 
last page of this notice. Copies of the appendices were sent to all 
those receiving this notice in the mail.

---------------------------------------------------------------------------

[[Page 64209]]

Land Requirements for Construction

    Construction of the proposed facilities would require about 2.1 
acres of land within the existing compressor station yards.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as ``scoping''. The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this Notice of Intent, the Commission staff 
requests public comments on the scope of the issues to address in the 
EA. All comments received are considered during the preparation of the 
EA. State and local government representatives are encouraged to notify 
their constituents of this proposed action and encourage them to 
comment on their areas of concern.
    In the EA we \3\ will discuss impacts that could occur as a result 
of the construction and operation of the proposed project under these 
general headings:
---------------------------------------------------------------------------

    \3\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------

     Geology and soils.
     Land use.
     Water resources, fisheries, and wetlands.
     Cultural resources.
     Vegetation and wildlife.
     Air quality and noise.
     Endangered and threatened species.
     Hazardous waste.
     Public safety.
    We will also evaluate possible alternatives to the proposed project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be in the EA. Depending 
on the comments received during the scoping process, the EA may be 
published and mailed to federal, state, and local agencies, public 
interest groups, interested individuals, affected landowners, 
newspapers, libraries, and the Commission's official service list for 
this proceeding. A comment period will be allotted for review if the EA 
is published. We will consider all comments on the EA before we make 
our recommendations to the Commission.
    To ensure your comments are considered, please carefully follow the 
instructions in the public participation section below.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. By becoming a commentor, your 
concerns will be addressed in the EA and considered by the Commission. 
You should focus on the potential environmental effects of the 
proposal, alternatives to the proposal, and measures to avoid or lessen 
environmental impact. The more specific your comments, the more useful 
they will be. Please carefully follow these instructions to ensure that 
your comments are received in time and properly recorded:
     Send an original and two copies of your letter to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First St., NE., Room 1A, Washington, DC 20426.
     Label one copy of the comments for the attention of Gas 
Branch 3.
     Reference Docket No. CP07-447-000.
     Mail your comments so that they will be received in 
Washington, DC on or before December 12, 2007.
    The Commission strongly encourages electronic filing of any 
comments or interventions or protests to this proceeding. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
at https://www.ferc.gov under the ``e-Filing'' link and the link to the 
User's Guide. Before you can file comments you will need to create a 
free account which can be created on-line.
    We may mail the EA for comment. If you are interested in receiving 
it, please return the Information Request (Appendix 3). If you do not 
return the Information Request, you will be taken off the mailing list.

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an official party to the proceeding, or ``intervenor''. To 
become an intervenor you must file a motion to intervene according to 
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 
385.214). Intervenors have the right to seek rehearing of the 
Commission's decision. Motions to Intervene should be electronically 
submitted using the Commission's eFiling system at https://www.ferc.gov. 
Persons without Internet access should send an original and 14 copies 
of their motion to the Secretary of the Commission at the address 
indicated previously. Persons filing Motions to Intervene on or before 
the comment deadline indicated above must send a copy of the motion to 
the Applicant. All filings, including late interventions, submitted 
after the comment deadline must be served on the Applicant and all 
other intervenors identified on the Commission's service list for this 
proceeding. Persons on the service list with e-mail addresses may be 
served electronically; others must be served a hard copy of the filing.
    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your environmental comments considered.

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who own 
homes within distances defined in the Commission's regulations of 
certain aboveground facilities. By this notice we are also asking 
governmental agencies, especially those in Appendix 2, to express their 
interest in becoming cooperating agencies for the preparation of the 
EA.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all

[[Page 64210]]

formal issuances and submittals in specific dockets. This can reduce 
the amount of time you spend researching proceedings by automatically 
providing you with notification of these filings, document summaries 
and direct links to the documents. Go to https://www.ferc.gov/
esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-22291 Filed 11-14-07; 8:45 am]