Grand River Dam Authority; Notice of Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 64212-64213 [E7-22287]

Download as PDF 64212 Federal Register / Vol. 72, No. 220 / Thursday, November 15, 2007 / Notices In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing’’ link. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E7–22286 Filed 11–14–07; 8:45 am] pwalker on PROD1PC71 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 19:50 Nov 14, 2007 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494–325] Grand River Dam Authority; Notice of Amendment of License and Soliciting Comments, Motions To Intervene, and Protests November 6, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No.: 1494–325. c. Date Filed: October 18, 2007. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Project. f. Location: The project is located on Elk River in Delaware County, Oklahoma. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r) and 799 and 801. h. Applicant Contact: Ms. Tamara Jahnke, Grand River Dam Authority, P.O. Box 409, Vinita, OK 74301, (918) 256–5545. i. FERC Contact: Rebecca Martin at 202–502–6012, or e-mail Rebecca.martin@ferc.gov. j. Deadline for filing comments and or motions: December 7, 2007. All documents (original and eight copies) should be filed with: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC 20426. Please include the project number (P–1494–325) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Application: The licensee requests Commission approval to grant an after-the-fact permit to Grand View Village for four existing docks with a total of 30 slips on Elk River. The first dock is 72 feet by 26.5 feet with a PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 store on it. A second dock that is 24 feet by 24 feet dock is attached to the first dock. The third dock has 12 slips and is 30 feet by 159 feet. The fourth dock has 18 slips and is 150 feet by 70 feet. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an E:\FR\FM\15NON1.SGM 15NON1 Federal Register / Vol. 72, No. 220 / Thursday, November 15, 2007 / Notices agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–22287 Filed 11–14–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No: 2277–007] Union Electric Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests pwalker on PROD1PC71 with NOTICES November 6, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of license to delete certain nonjurisdictional transmission facilities from license. b. Project No.: 2277–007. c. Date Filed: October 12, 2007. d. Applicant: Union Electric Company (doing business as AmerenUE). e. Name of Project: Tom Sauk Pumped-Storage Project. f. Location: The project is located on the East Fork of the Black River in Reynolds County, Missouri. g. Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Thomas L. Hollenkamp, Manager Dam Safety & Hydro Engineering, AmerenUE, One Ameren Plaza, 1901 Chouteau Avenue, St. Louis, MO 63166–6149. i. FERC Contact: Any questions on this notice should be addressed to Mr. Vedula Sarma at (202) 502–6190, or email address: vedula.sarma@ferc.gov. j. Deadline for filing comments and or motions: December 7, 2007. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. VerDate Aug<31>2005 19:50 Nov 14, 2007 Jkt 214001 Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Union Electric Company dba AmerenUE proposes to delete from license a 30mile-long 138-kV transmission line extending from the switchyard at the Tom Sauk Pumped-Storage Project to the Rivermines Substation. According to AmerenUE the line is no longer a primary line for the project but functions as part of an integrated transmission system under the control of Midwest Independent System Operator and is used to transmit power from both project and non-project sources. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 64213 comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–22289 Filed 11–14–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice November 8, 2007. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: November 15, 2007, 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. *Note Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using E:\FR\FM\15NON1.SGM 15NON1

Agencies

[Federal Register Volume 72, Number 220 (Thursday, November 15, 2007)]
[Notices]
[Pages 64212-64213]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22287]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1494-325]


Grand River Dam Authority; Notice of Amendment of License and 
Soliciting Comments, Motions To Intervene, and Protests

November 6, 2007.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No.: 1494-325.
    c. Date Filed: October 18, 2007.
    d. Applicant: Grand River Dam Authority.
    e. Name of Project: Pensacola Project.
    f. Location: The project is located on Elk River in Delaware 
County, Oklahoma. The project does not occupy federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r) 
and 799 and 801.
    h. Applicant Contact: Ms. Tamara Jahnke, Grand River Dam Authority, 
P.O. Box 409, Vinita, OK 74301, (918) 256-5545.
    i. FERC Contact: Rebecca Martin at 202-502-6012, or e-mail 
Rebecca.martin@ferc.gov.
    j. Deadline for filing comments and or motions: December 7, 2007.
    All documents (original and eight copies) should be filed with: The 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington DC 20426. Please include the project number (P-1494-325) on 
any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Application: The licensee requests Commission 
approval to grant an after-the-fact permit to Grand View Village for 
four existing docks with a total of 30 slips on Elk River. The first 
dock is 72 feet by 26.5 feet with a store on it. A second dock that is 
24 feet by 24 feet dock is attached to the first dock. The third dock 
has 12 slips and is 30 feet by 159 feet. The fourth dock has 18 slips 
and is 150 feet by 70 feet.
    l. Location of Application: A copy of the application is available 
for inspection and reproduction at the Commission's Public Reference 
Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, 
or by calling (202) 502-8371. This filing may also be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filings must bear in all capital letters the title 
``COMMENTS'', RECOMMENDATIONS FOR TERMS AND CONDITIONS'', ``PROTEST'', 
or ``MOTION TO INTERVENE'', as applicable, and the Project Number of 
the particular application to which the filing refers. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an

[[Page 64213]]

agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-22287 Filed 11-14-07; 8:45 am]