Airworthiness Directives; McDonnell Douglas Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), and MD-88 Airplanes, 64008-64009 [07-5654]
Download as PDF
64008
Federal Register / Vol. 72, No. 219 / Wednesday, November 14, 2007 / Proposed Rules
Revision of the FAA-Approved Maintenance
Inspection Program
(g) Within 12 months after the effective
date of this AD, incorporte a revision into the
FAA-approved maintenance inspection
program that provides no less than the
required damage tolerance assessment/
analysis (DTA) for each structural significant
item (SSI) listed in the SSID. (The required
DTA value for each SSI is listed in the SSID.)
The revision to the maintenance inspection
program must include and must be
implemented in accordance with the
procedures in Section 5.0, ‘‘Damage
Tolerance Analysis Methodology,’’ and
Section 7.0, ‘‘Discrepancy Reporting,’’ of the
SSID. Under the provisions of the Paperwork
Reduction Act of 1980 (44 U.S.C. 3501, et
seq.), the Office of Management and Budget
(OMB) has approved the information
collection requirements contained in this AD
and has assigned OMB Control Number
2120–0056.
pwalker on PROD1PC71 with PROPOSALS
Initial and Repetitive Inspections
(h) At the later of the times specified in
paragraphs (h)(1) and (h)(2) of this AD,
except as provided by paragraphs (i) through
(m) of this AD: Do the applicable initial
inspections to detect cracks of all SSIs, in
accordance with the SSID. Repeat the
applicable inspections thereafter at intervals
not to exceed the ‘‘Recurring’’ intervals
specified in Section 6.0.0 of the SSID, except
as provided by paragraphs (k) through (m) of
this AD.
(1) Before the applicable ‘‘Initial’’
threshold specified in Section 6.0.0,
‘‘Structural Inspection Requirements’’ of the
SSID.
(2) Within 36 months after the effective
date of this AD, or within one ‘‘Recurring’’
interval measured from 12 months after the
effective date of the AD, whichever comes
first.
Exceptions to the SSID
(i) Where Section 6.0.0 of the SSID
specifies the ‘‘Initial’’ threshold in years
(since new), this AD requires compliance
within the specified year since the date of
issuance of the original standard
airworthiness certificate or the date of
issuance of the original export certificate of
airworthiness.
(j) Where Section 6.0 of the SSID specifies
the ‘‘Initial’’ threshold as ‘‘Special
Condition,’’ this AD requires compliance
within 24 months after the effective date of
this AD.
(k) Where Section 6.0 of the SSID specifies
the ‘‘Initial’’ threshold and ‘‘Recurring’’
interval as ‘‘FS 1041 Fitting Replacement,’’
this AD requires compliance within 24
months after the effective date of this AD and
thereafter at intervals not to exceed 12
months.
(l) Where Section 6.0 of the SSID specifies
the ‘‘Initial’’ threshold and ‘‘Recurring’’
interval as ‘‘Engine Change,’’ this AD
requires compliance within 24 months after
the effective date of this AD and thereafter at
intervals not to exceed 36 months.
(m) Where Section 6.0 of the SSID specifies
the ‘‘Initial’’ threshold and ‘‘Recurring’’
interval as ‘‘Aft Lord Mount Change,’’ this
VerDate Aug<31>2005
16:00 Nov 13, 2007
Jkt 214001
AD requires compliance within 24 months
after the effective date of this AD and
thereafter at intervals not to exceed 24
months.
Repair
(n) If any cracked structure is found during
any inspection required by paragraph (h) of
this AD, before further flight, repair the
cracked structure using a method approved
by the Manager, Atlanta Aircraft Certification
Office (ACO), FAA. For a repair method to
be approved by the Manager, Atlanta ACO,
as required by this paragraph, the Manager’s
approval letter must specifically refer to this
AD.
Inspection Program for Transferred
Airplanes
(o) Before any airplane that is subject to
this AD and that has exceeded the applicable
compliance times specified in paragraph (h)
of this AD can be added to an air carrier’s
operations specifications, a program for the
accomplishment of the inspections required
by this AD must be established in accordance
with paragraph (o)(1) or (o)(2) of this AD, as
applicable.
(1) For airplanes that have been inspected
in accordance with this AD: The inspection
of each SSI must be done by the new operator
in accordance with the previous operator’s
schedule and inspection method, or the new
operator’s schedule and inspection method,
at whichever time would result in the earlier
accomplishment for that SSI inspection. The
compliance time for accomplishment of this
inspection must be measured from the last
inspection accomplished by the previous
operator. After each inspection has been
done once, each subsequent inspection must
be performed in accordance with the new
operator’s schedule and inspection method.
(2) For airplanes that have not been
inspected in accordance with this AD: The
inspection of each SSI required by this AD
must be done either before adding the
airplane to the air carrier’s operations
specification, or in accordance with a
schedule and an inspection method approved
by the Manager, Atlanta Aircraft Certification
Office (ACO), FAA. After each inspection has
been done once, each subsequent inspection
must be done in accordance with the new
operator’s schedule.
Alternative Methods of Compliance
(AMOCs)
(p)(1) The Manager, Atlanta ACO, has the
authority to approve AMOCs for this AD, if
required in accordance with the procedures
found in 14 CFR 39.19.
(2) To request a different method of
compliance or a different compliance time
for this AD, follow the procedures in 14 CFR
39.19. Before using any approved AMOC on
any airplane to which the AMOC applies,
notify your appropriate principal inspector
(PI) in the FAA Flight Standards District
Office (FSDO), or lacking a PI, your local
FSDO.
PO 00000
Frm 00006
Fmt 4702
Sfmt 4702
Issued in Renton, Washington, on October
23, 2007.
Stephen P. Boyd,
Assistant Manager, Transport Airplane
Directorate, Aircraft Certification Service.
[FR Doc. 07–5595 Filed 11–13–07; 8:45 am]
BILLING CODE 4910–13–M
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2007–29335; Directorate
Identifier 2007–NM–045–AD]
RIN 2120–AA64
Airworthiness Directives; McDonnell
Douglas Model DC–9–81 (MD–81), DC–
9–82 (MD–82), DC–9–83 (MD–83), DC–
9–87 (MD–87), and MD–88 Airplanes
Federal Aviation
Administration (FAA), Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking
(NPRM); extension of comment period.
AGENCY:
SUMMARY: This document extends the
comment period for the abovereferenced NPRM, which proposes the
adoption of a new airworthiness
directive (AD) that applies to all
McDonnell Douglas Model DC–9–81
(MD–81), DC–9–82 (MD–82), DC–9–83
(MD–83), DC–9–87 (MD–87), and MD–
88 airplanes. The NPRM would require
repetitive inspections for cracking of the
overwing frames from stations 845 to
905 (MD–87 stations 731 to 791), left
and right sides, and corrective actions if
necessary. The NPRM results from
reports of cracked overwing frames.
This extension of the comment period is
necessary to ensure that all interested
persons have ample opportunity to
submit any written relevant data, views,
or arguments regarding the NPRM.
DATES: We must receive comments on
this NPRM by December 3, 2007.
ADDRESSES: You may send comments by
any of the following methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov. Follow the
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590.
• Hand Delivery: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
E:\FR\FM\14NOP1.SGM
14NOP1
Federal Register / Vol. 72, No. 219 / Wednesday, November 14, 2007 / Proposed Rules
For service information identified in
this AD, contact Boeing Commercial
Airplanes, Long Beach Division, 3855
Lakewood Boulevard, Long Beach,
California 90846, Attention: Data and
Service Management, Dept. C1–L5A
(D800–0024).
FOR FURTHER INFORMATION CONTACT:
Roger Durbin, Aerospace Engineer,
Airframe Branch, ANM–120L, FAA, Los
Angeles Aircraft Certification Office,
3960 Paramount Boulevard, Lakewood,
California 90712–4137; telephone (562)
627–5233; fax (562) 627–5210.
SUPPLEMENTARY INFORMATION: We
proposed to amend 14 CFR part 39 with
a notice of proposed rulemaking
(NPRM) for an AD (the ‘‘original
NPRM’’) for all McDonnell Douglas
Model DC–9–81 (MD–81), DC–9–82
(MD–82), DC–9–83 (MD–83), DC–9–87
(MD–87), and MD–88 airplanes. The
original NPRM was published in the
Federal Register on September 28, 2007
(72 FR 55111). The original NPRM
proposed to require repetitive
inspections for cracking of the overwing
frames from stations 845 to 905 (MD–87
stations 731 to 791), left and right sides,
and corrective actions if necessary. The
original NPRM also invites comments
on its overall regulatory, economic,
environmental, and energy aspects.
Events Leading to Extension of
Comment Period
Since we issued the NPRM, the DOT’s
Docket Management System (DMS) was
replaced by the Federal Docket
Management System (FDMS). FDMS is
a government-wide, electronic docket
management system, which contains the
public dockets and is the method used
for submitting comments on the overall
regulatory, economic, environmental,
and energy aspects of proposed
rulemaking actions. However, due to the
service disruption caused by the
transition from DOT’s DMS to the
FDMS, the docket material was not
posted on the FDMS until November 1,
2007. Therefore, we have determined
that the public was not provided
adequate opportunity to submit
comments on the NPRM. As a result, we
have decided to extend the comment
period for this NPRM until December 3,
2007, to receive additional comments.
pwalker on PROD1PC71 with PROPOSALS
FAA’s Determination
We have considered this issue and
find it appropriate to extend the
comment period to give all interested
persons additional time to examine the
proposed requirements of the original
NPRM and submit comments. After
evaluating the circumstances stated
previously, we have determined that
VerDate Aug<31>2005
16:00 Nov 13, 2007
Jkt 214001
extending the comment period until
December 3, 2007, will not compromise
the safety of these airplanes.
Extension of Comment Period
The comment period for Docket No.
FAA–2007–29335; Directorate Identifier
2007–NM–045–AD; has been revised.
The comment period now closes
December 3, 2007.
No other part of the regulatory
information has been changed;
therefore, the original NPRM is not
republished in the Federal Register.
Issued in Renton, Washington, on
November 7, 2007.
Ali Bahrami,
Manager, Transport Airplane Directorate,
Aircraft Certification Service.
[FR Doc. 07–5654 Filed 11–9–07; 10:10 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2007–29333; Directorate
Identifier 2007–NM–141–AD]
RIN 2120–AA64
Airworthiness Directives; Boeing
Model 737–600, –700, –700C, –800, and
–900 Series Airplanes
Federal Aviation
Administration (FAA), Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking
(NPRM); extension of comment period.
AGENCY:
SUMMARY: This document extends the
comment period for the abovereferenced NPRM, which proposes the
adoption of a new airworthiness
directive (AD) that applies to certain
Boeing Model 737–600, –700, –700C,
–800, and –900 series airplanes. The
NRPM would require various repetitive
inspections to detect cracks along the
chemically milled steps of the fuselage
skin or missing or loose fasteners in the
area of the preventative modification or
repairs, replacement of the time-limited
repair with the permanent repair if
applicable, and applicable corrective
actions if necessary, which would end
certain repetitive inspections. The
NPRM results from a fatigue test that
revealed numerous cracks in the upper
skin panel at the chemically milled step
above the lap joint. This extension of
the comment period is necessary to
ensure that all interested persons have
ample opportunity to submit any
written relevant data, views, or
arguments regarding the NPRM.
PO 00000
Frm 00007
Fmt 4702
Sfmt 4702
64009
We must receive comments on
this NPRM by December 3, 2007.
ADDRESSES: You may send comments by
any of the following methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov. Follow the
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590.
• Hand Delivery: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
For service information identified in
this AD, contact Boeing Commercial
Airplanes, P.O. Box 3707, Seattle,
Washington 98124–2207.
FOR FURTHER INFORMATION CONTACT:
Wayne Lockett, Aerospace Engineer,
Airframe Branch, ANM–120S, FAA,
Seattle Aircraft Certification Office,
1601 Lind Avenue, SW., Renton,
Washington 98057–3356; telephone
(425) 917–6447; fax (425) 917–6590.
SUPPLEMENTARY INFORMATION: We
proposed to amend 14 CFR part 39 with
a notice of proposed rulemaking
(NPRM) for an AD (the ‘‘original
NPRM’’) for certain Boeing Model 737–
600, –700, –700C, –800, and –900 series
airplanes. The original NPRM was
published in the Federal Register on
September 28, 2007 (72 FR 55118). The
original NPRM proposed to require
various repetitive inspections to detect
cracks along the chemically milled steps
of the fuselage skin or missing or loose
fasteners in the area of the preventative
modification or repairs, replacement of
the time-limited repair with the
permanent repair if applicable, and
applicable corrective actions if
necessary, which would end certain
repetitive inspections. The original
NPRM also invites comments on its
overall regulatory, economic,
environmental, and energy aspects.
DATES:
Events Leading to Extension of
Comment Period
Since we issued the NPRM, the DOT’s
Docket Management System (DMS) was
replaced by the Federal Docket
Management System (FDMS). FDMS is
a government-wide, electronic docket
management system, which contains the
public dockets and is the method used
for submitting comments on the overall
regulatory, economic, environmental,
and energy aspects of proposed
rulemaking actions. However, due to the
E:\FR\FM\14NOP1.SGM
14NOP1
Agencies
[Federal Register Volume 72, Number 219 (Wednesday, November 14, 2007)]
[Proposed Rules]
[Pages 64008-64009]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-5654]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2007-29335; Directorate Identifier 2007-NM-045-AD]
RIN 2120-AA64
Airworthiness Directives; McDonnell Douglas Model DC-9-81 (MD-
81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), and MD-88
Airplanes
AGENCY: Federal Aviation Administration (FAA), Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking (NPRM); extension of comment
period.
-----------------------------------------------------------------------
SUMMARY: This document extends the comment period for the above-
referenced NPRM, which proposes the adoption of a new airworthiness
directive (AD) that applies to all McDonnell Douglas Model DC-9-81 (MD-
81), DC-9-82 (MD-82), DC-9-83 (MD-83), DC-9-87 (MD-87), and MD-88
airplanes. The NPRM would require repetitive inspections for cracking
of the overwing frames from stations 845 to 905 (MD-87 stations 731 to
791), left and right sides, and corrective actions if necessary. The
NPRM results from reports of cracked overwing frames. This extension of
the comment period is necessary to ensure that all interested persons
have ample opportunity to submit any written relevant data, views, or
arguments regarding the NPRM.
DATES: We must receive comments on this NPRM by December 3, 2007.
ADDRESSES: You may send comments by any of the following methods:
Federal eRulemaking Portal: Go to https://
www.regulations.gov. Follow the instructions for submitting comments.
Fax: 202-493-2251.
Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590.
Hand Delivery: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
[[Page 64009]]
For service information identified in this AD, contact Boeing
Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard,
Long Beach, California 90846, Attention: Data and Service Management,
Dept. C1-L5A (D800-0024).
FOR FURTHER INFORMATION CONTACT: Roger Durbin, Aerospace Engineer,
Airframe Branch, ANM-120L, FAA, Los Angeles Aircraft Certification
Office, 3960 Paramount Boulevard, Lakewood, California 90712-4137;
telephone (562) 627-5233; fax (562) 627-5210.
SUPPLEMENTARY INFORMATION: We proposed to amend 14 CFR part 39 with a
notice of proposed rulemaking (NPRM) for an AD (the ``original NPRM'')
for all McDonnell Douglas Model DC-9-81 (MD-81), DC-9-82 (MD-82), DC-9-
83 (MD-83), DC-9-87 (MD-87), and MD-88 airplanes. The original NPRM was
published in the Federal Register on September 28, 2007 (72 FR 55111).
The original NPRM proposed to require repetitive inspections for
cracking of the overwing frames from stations 845 to 905 (MD-87
stations 731 to 791), left and right sides, and corrective actions if
necessary. The original NPRM also invites comments on its overall
regulatory, economic, environmental, and energy aspects.
Events Leading to Extension of Comment Period
Since we issued the NPRM, the DOT's Docket Management System (DMS)
was replaced by the Federal Docket Management System (FDMS). FDMS is a
government-wide, electronic docket management system, which contains
the public dockets and is the method used for submitting comments on
the overall regulatory, economic, environmental, and energy aspects of
proposed rulemaking actions. However, due to the service disruption
caused by the transition from DOT's DMS to the FDMS, the docket
material was not posted on the FDMS until November 1, 2007. Therefore,
we have determined that the public was not provided adequate
opportunity to submit comments on the NPRM. As a result, we have
decided to extend the comment period for this NPRM until December 3,
2007, to receive additional comments.
FAA's Determination
We have considered this issue and find it appropriate to extend the
comment period to give all interested persons additional time to
examine the proposed requirements of the original NPRM and submit
comments. After evaluating the circumstances stated previously, we have
determined that extending the comment period until December 3, 2007,
will not compromise the safety of these airplanes.
Extension of Comment Period
The comment period for Docket No. FAA-2007-29335; Directorate
Identifier 2007-NM-045-AD; has been revised. The comment period now
closes December 3, 2007.
No other part of the regulatory information has been changed;
therefore, the original NPRM is not republished in the Federal
Register.
Issued in Renton, Washington, on November 7, 2007.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 07-5654 Filed 11-9-07; 10:10 am]
BILLING CODE 4910-13-P