Download as PDF Federal Register / Vol. 72, No. 217 / Friday, November 9, 2007 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6692–7] mstockstill on PROD1PC66 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 10/29/2007 Through 11/02/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070464, Final EIS, FHW, VA, Harrisonburg Southeast Connector Location Study, Transportation Improvements from U.S. Route 11 to U.S. Route 33, Funding and US Army COE Section 404 Permit, City of Harrisonburg, Rockingham County, VA, Wait Period Ends: 12/10/2007, Contact: John Simkins 804–775–3342. EIS No. 20070465, Final EIS, FRA, CA, Los Angeles to San Diego (LOSSAN) Rail Corridor, Proposed Rail Corridor Improvement Studies, Increase of Intercity Travel for Faster, Safer, and Reliable Passenger Rail System, Los Angeles, Orange and San Diego Counties, CA, Wait Period Ends: 12/10/2007, Contact: Richard Dial 202–493–6368. EIS No. 20070466, Final EIS, FHW, WI, TIER 1–FEIS—United States Highway 8 Project, Construction from Wis 35 (N) to USH 53, Selected the Preferred Segment Alternative, Funding and Right-of-Way Permit, Polk and Barron Counties, WI, Wait Period Ends: 12/10/2007, Contact: Peter M. Garcia 608–829–7513. EIS No. 20070467, Final EIS, BLM, NM, Special Status Species Resource Management Plan Amendment, Managing Public Land and Federal Minerals in Portions of Chaves, Eddy, Lea and Roosevelt Counties, NM, Wait Period Ends: 12/10/2007, Contact: Howard Parman 505–627–0212. EIS No. 20070468, Final Supplement, SFW, CA, Coachella Valley, Revision to the Multiple Species Habitat Conservation Plan (MSHCP), Natural Community Conservation Plan, Santa Rosa and San Jacinto Mountains Trails Plan, Issuance of Incidental Take Permit, Riverside County, CA, Wait Period Ends: 12/10/2007, Contact: Therese O’Rourke 760–431– 9440. EIS No. 20070469, Draft EIS, NOA, 00, Snapper Grouper Amendment 15B, Fishery Management Plan, To Analyze the Effects of Updating Management Reference Points for Golden Tilefish (Lopholatilus VerDate Aug<31>2005 23:48 Nov 08, 2007 Jkt 214001 chamaeleonticeps); Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus), NC, SC, FL and GA, Comment Period Ends: 01/11/2008, Contact: Dr. Roy E. Crabtree 727–824– 5301 . EIS No. 20070470, Draft Supplement, AFS, ID, North Sheep Allotments— Sheep and Goat Allotment Management Plans, Additional Information on Analyses Concerning Management Indicator Species, Capable and Suitable Grazing Lands, and Adaptive Management Strategies, Authorization of Continued Sheep Grazing for Fisher Creek, Smiley Creek, North Fork-Boulder and Baker Creek Sheep and Goat Grazing Allotments, Sawtooth National Forest, Ketchum Ranger District, Sawtooth National Recreation Area, Blaine and Custer Counties, ID, Comment Period Ends: 12/24/2007, Contact: Carol Brown 208–727–5000 . EIS No. 20070471, Draft EIS, DOE, MN, Mesaba Energy Project, Proposes to Design, Construct and Operate a CoalBased Integrated Gasification Cycle(IGCC) Electric Power Generating Facility, Located in the Taconite Tax Relief Area (TTRA), Itasca and St. Louis Counties, MN, Comment Period Ends: 01/11/2008, Contact: Richard A. Hargis 412–386– 4604. EIS No. 20070472, Final EIS, DOE, WV, Western Greenbrier Co-Production Demonstration Project, Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, WV, Wait Period Ends: 12/10/2007, Contact: Roy Spears 304– 285–5460. EIS No. 20070473, Draft EIS, FHW, MT, US–212 Reconstruction Project, from Rockvale to Laurel, Proposes to Improve Safety for Local and Regional Traffic Area, Yellowstone and Carbon Counties, MT, Comment Period Ends: 12/26/2007, Contact: Theordore G. Burch 406–449–5302. EIS No. 20070474, Final EIS, COE, TN, Center Hill Dam and Lake Project, Changes to Operational Guide Curves Pool Elevations, Chancey Fork River and Cumberland River, Dekalb County, TN, Wait Period Ends: 12/10/ 2007, Contact: Joy Broach 615–736– 7956. EIS No. 20070475, Final EIS, FHW, KS, ADOPTION—Kansas Highway10 (commonly known as South Lawrence Trafficway) Relocation, Issuance or Denial of Section 404 Permit Request, Lawrence City, Douglas County, KS, Wait Period Ends: 12/10/2007, Contact: John Knowles 785–228–2544 Ext 211 Department of PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 63579 Transportation’s, Federal Highway Administration, has adopted the Corp of Engineers’s , FEIS #20030010, filed 01/07/2003. FHW was not a Cooperating Agency on the above FEIS. Under Section 1506.3(b) of the CEQ Regulations, the FEIS must be Recirculated for a 30-day Wait Period. EIS No. 20070476, Draft EIS, FRC, 00, Gulf Crossing Project, Construction and Operation of Natural Gas Pipeline to Facilitate the Transport of up to 1.73 Billion Cubic Feet Per Day of Natural Gas, Located in various Counties and Parishes in OK, TX, LA and MS, Comment Period Ends: 12/ 24/2007, Contact: Andy Black 1–866– 208–3372. EIS No. 20070477, Final EIS, MMS, 00, PROGRAMMATIC—Alternative Energy Development and Production and Alternate Use of Facilities on the Outer Continental Shelf, Implementation, Atlantic, Gulf of Mexico, Pacific and Alaska, Wait Period Ends: 12/10/2007, Contact: Mary Boatman 703–787–1662. EIS No. 20070478, Final EIS, AFS, AK, Helicopter Access to Conduct Forest Inventory and Analysis (FIA) in Wilderness, Implementation, Selected Preferred Alternative, 1 Tongass and Chugach National Forest, AK, Wait Period Ends: 12/10/2007, Contact: Ken Post 907–586–8796. EIS No. 20070479, Final EIS, GSA, DC, Armed Forces Retirement Home (AFRH–W), Proposed Master Plan for Campus Located 3700 North Capitol Street, NW., AFRH Trust Fund, Washington, DC, Wait Period Ends: 12/10/2007, Contact: Joe Woo 202– 730–3445. Amended Notices EIS No. 20070344, Draft EIS, FHW, VT, Circ-Williston Transportation Project, Improvements between I–89 and the Towns Williston and Essex and the Village of Essex Junction, City of Burlington, Chittenden County, VT, Comment Period Ends: 11/21/2007, Contact: Kenneth R. Sikora, Jr. 802– 828–4424 . Revision of FR Published 08/10/2007: Extending Comment Period from 11/08/2007 to 11/21/ 2007. EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and Improve to the I–94/1–69 Corridor, To Provide Safe, Efficient and Secure Movement of People and Goods across the Canadian—U.S. Border, Port Huron Area, St. Clair County, MI, Comment Period Ends: 12/10/2007, Contact: Ryan Rizzo 517–702–1833 . Revision to FR Published 09/21/2007: Extending Comment Period from 11/ 05/2007 to 12/10/2007. E:\FR\FM\09NON1.SGM 09NON1 63580 Federal Register / Vol. 72, No. 217 / Friday, November 9, 2007 / Notices EIS No. 20070422, Draft EIS, FHW, TN, US 127/ TN 28 Improvements, from 1–40 at Crossville to TN 62 at Clarkrange, Funding, U.S. Army COE Section 10 and 404 Permits, Cumberland and Fentress Counties, TN, Comment Period Ends: 12/11/ 2007, Contact: Leigh Ann Tribble 615–781–5760 . Revision of FR Published 10/12/2007: Correction to Comment Period from 11/26/2007 to 12/11/2007. EIS No. 20070441, Draft Supplement, IBR, CA, Environmental Water Account (EWA) Project, Updated Information to Provide an Evaluation of 2004 Final EIS/EIR Environmental Water Account (EWA) and Effects Associated with Extending the Current EWA’s through 2011, CA, Comment Period Ends: 12/10/2007, Contact: Ms. Sammie Cervantes 916– 978–5189. Revision of FR Published 10/26/2007: Correction to Title and Contact Telephone Number. EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G, Proposed Mine Expansion, Caribou County, ID, Wait Period Ends: 12/26/ 2007, Contact: Bill Stout 208–478– 6367. Revision of FR Published 10/26/ 2007: Extending Comment Period from 11/26/2007 to 12/26/2007. Dated: November 6, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–22038 Filed 11–8–07; 8:45 am] FEDERAL ELECTION COMMISSION Sunshine Act Meeting mstockstill on PROD1PC66 with NOTICES DATE & TIME: Wednesday, November 14, 2007 at 10 a.m. PLACE: 999 E Street, NW., Washington, DC. STATUS: This meeting will be closed to the public. Items To Be Discussed Compliance matters pursuant to 2 U.S.C. 437g. Audits conducted pursuant to 2 U.S.C. 437g, 438(b), and Title 26, U.S.C. Matters concerning participation in civil actions or proceedings or arbitration. Internal personnel rules and procedures or matters affecting a particular employee. * * * * * DATE & TIME: Thursday, November 15, 2007 at 10 a.m. PLACE: 999 E Street, NW., Washington, DC. 23:48 Nov 08, 2007 This hearing will be open to the public. Matters Before the Commission Notice of proposed rulemaking for candidate travel. DATE & TIME: Thursday, November 15, 2007, Open Meeting to be held at the conclusion of the hearing. PLACE: 999 E Street, NW., Washington, DC (Ninth Floor). STATUS: This meeting will be open to the public. Items To Be Discussed Correction and Approval of Minutes. Advisory Opinion 2007–19: Renaissance Health Service Corporation, by counsel, Timothy Sawyer Knowlton. Agency Strategic Plan FY 2008–2013. Management and Administrative Matters. PERSON TO CONTACT FOR INFORMATION: Mr. Robert Biersack, Press Officer, Telephone: (202) 694–1220. Mary W. Dove, Secretary of the Commission. [FR Doc. 07–5631 Filed 11–7–07; 12:43 pm] BILLING CODE 6715–01–M FEDERAL HOUSING FINANCE BOARD Sunshine Act Meeting Notice; Announcing a Partially Open Meeting of the Board of Directors The open meeting of the Board of Directors is scheduled to begin at 10 a.m. on Wednesday, November 14, 2007. The closed portion of the meeting will follow immediately the open portion of the meeting. PLACE: Board Room, First Floor, Federal Housing Finance Board, 1625 Eye Street, NW., Washington DC 20006. STATUS: The first portion of the meeting will be open to the public. The final portion of the meeting will be closed to the public. TIME AND DATE: BILLING CODE 6560–50–P VerDate Aug<31>2005 STATUS: Jkt 214001 Matter to be Considered at the Open Portion FY 2008 Annual Performance Budget. Matter to be Considered at the Closed Portion Periodic Update of Examination Program Development and Supervisory Findings. Contact Person for More Information: Shelia Willis, Paralegal Specialist, Office of General Counsel, at 202–408–2876 or williss@fhfb.gov. SUPPLEMENTARY INFORMATION: Dated: November 6, 2007. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 By the Federal Housing Finance Board. Neil R. Crowley, Acting General Counsel. [FR Doc. 07–5630 Filed 11–7–07; 12:43 pm] BILLING CODE 6725–01–P FEDERAL RESERVE SYSTEM Proposed Agency Information Collection Activities; Comment Request Board of Governors of the Federal Reserve System. SUMMARY: Background. On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its approval authority under the Paperwork Reduction Act (PRA), as per 5 CFR 1320.16, to approve of and assign OMB control numbers to collection of information requests and requirements conducted or sponsored by the Board under conditions set forth in 5 CFR 1320 Appendix A.1. Boardapproved collections of information are incorporated into the official OMB inventory of currently approved collections of information. Copies of the Paperwork Reduction Act Submission, supporting statements and approved collection of information instruments are placed into OMB’s public docket files. The Federal Reserve may not conduct or sponsor, and the respondent is not required to respond to, an information collection that has been extended, revised, or implemented on or after October 1, 1995, unless it displays a currently valid OMB control number. AGENCY: Request for Comment on Information Collection Proposals The following information collections, which are being handled under this delegated authority, have received initial Board approval and are hereby published for comment. At the end of the comment period, the proposed information collections, along with an analysis of comments and recommendations received, will be submitted to the Board for final approval under OMB delegated authority. Comments are invited on the following: a. Whether the proposed collection of information is necessary for the proper performance of the Federal Reserve’s functions; including whether the information has practical utility; b. The accuracy of the Federal Reserve’s estimate of the burden of the proposed information collection, including the validity of the methodology and assumptions used; E:\FR\FM\09NON1.SGM 09NON1

Agencies

[Federal Register Volume 72, Number 217 (Friday, November 9, 2007)]
[Notices]
[Pages 63579-63580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22038]



[[Page 63579]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6692-7]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements
Filed 10/29/2007 Through 11/02/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070464, Final EIS, FHW, VA, Harrisonburg Southeast Connector 
Location Study, Transportation Improvements from U.S. Route 11 to U.S. 
Route 33, Funding and US Army COE Section 404 Permit, City of 
Harrisonburg, Rockingham County, VA, Wait Period Ends: 12/10/2007, 
Contact: John Simkins 804-775-3342.
EIS No. 20070465, Final EIS, FRA, CA, Los Angeles to San Diego (LOSSAN) 
Rail Corridor, Proposed Rail Corridor Improvement Studies, Increase of 
Intercity Travel for Faster, Safer, and Reliable Passenger Rail System, 
Los Angeles, Orange and San Diego Counties, CA, Wait Period Ends: 12/
10/2007, Contact: Richard Dial 202-493-6368.
EIS No. 20070466, Final EIS, FHW, WI, TIER 1-FEIS--United States 
Highway 8 Project, Construction from Wis 35 (N) to USH 53, Selected the 
Preferred Segment Alternative, Funding and Right-of-Way Permit, Polk 
and Barron Counties, WI, Wait Period Ends: 12/10/2007, Contact: Peter 
M. Garcia 608-829-7513.
EIS No. 20070467, Final EIS, BLM, NM, Special Status Species Resource 
Management Plan Amendment, Managing Public Land and Federal Minerals in 
Portions of Chaves, Eddy, Lea and Roosevelt Counties, NM, Wait Period 
Ends: 12/10/2007, Contact: Howard Parman 505-627-0212.
EIS No. 20070468, Final Supplement, SFW, CA, Coachella Valley, Revision 
to the Multiple Species Habitat Conservation Plan (MSHCP), Natural 
Community Conservation Plan, Santa Rosa and San Jacinto Mountains 
Trails Plan, Issuance of Incidental Take Permit, Riverside County, CA, 
Wait Period Ends: 12/10/2007, Contact: Therese O'Rourke 760-431-9440.
EIS No. 20070469, Draft EIS, NOA, 00, Snapper Grouper Amendment 15B, 
Fishery Management Plan, To Analyze the Effects of Updating Management 
Reference Points for Golden Tilefish (Lopholatilus chamaeleonticeps); 
Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus), NC, 
SC, FL and GA, Comment Period Ends: 01/11/2008, Contact: Dr. Roy E. 
Crabtree 727-824-5301 .
EIS No. 20070470, Draft Supplement, AFS, ID, North Sheep Allotments--
Sheep and Goat Allotment Management Plans, Additional Information on 
Analyses Concerning Management Indicator Species, Capable and Suitable 
Grazing Lands, and Adaptive Management Strategies, Authorization of 
Continued Sheep Grazing for Fisher Creek, Smiley Creek, North Fork-
Boulder and Baker Creek Sheep and Goat Grazing Allotments, Sawtooth 
National Forest, Ketchum Ranger District, Sawtooth National Recreation 
Area, Blaine and Custer Counties, ID, Comment Period Ends: 12/24/2007, 
Contact: Carol Brown 208-727-5000 .
EIS No. 20070471, Draft EIS, DOE, MN, Mesaba Energy Project, Proposes 
to Design, Construct and Operate a Coal-Based Integrated Gasification 
Cycle(IGCC) Electric Power Generating Facility, Located in the Taconite 
Tax Relief Area (TTRA), Itasca and St. Louis Counties, MN, Comment 
Period Ends: 01/11/2008, Contact: Richard A. Hargis 412-386-4604.
EIS No. 20070472, Final EIS, DOE, WV, Western Greenbrier Co-Production 
Demonstration Project, Construction and Demonstration of a 98 megawatt 
(MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, 
Rainelle, WV, Wait Period Ends: 12/10/2007, Contact: Roy Spears 304-
285-5460.
EIS No. 20070473, Draft EIS, FHW, MT, US-212 Reconstruction Project, 
from Rockvale to Laurel, Proposes to Improve Safety for Local and 
Regional Traffic Area, Yellowstone and Carbon Counties, MT, Comment 
Period Ends: 12/26/2007, Contact: Theordore G. Burch 406-449-5302.
EIS No. 20070474, Final EIS, COE, TN, Center Hill Dam and Lake Project, 
Changes to Operational Guide Curves Pool Elevations, Chancey Fork River 
and Cumberland River, Dekalb County, TN, Wait Period Ends: 12/10/2007, 
Contact: Joy Broach 615-736-7956.
EIS No. 20070475, Final EIS, FHW, KS, ADOPTION--Kansas Highway10 
(commonly known as South Lawrence Trafficway) Relocation, Issuance or 
Denial of Section 404 Permit Request, Lawrence City, Douglas County, 
KS, Wait Period Ends: 12/10/2007, Contact: John Knowles 785-228-2544 
Ext 211 Department of Transportation's, Federal Highway Administration, 
has adopted the Corp of Engineers's , FEIS 20030010, filed 01/
07/2003. FHW was not a Cooperating Agency on the above FEIS. Under 
Section 1506.3(b) of the CEQ Regulations, the FEIS must be Recirculated 
for a 30-day Wait Period.
EIS No. 20070476, Draft EIS, FRC, 00, Gulf Crossing Project, 
Construction and Operation of Natural Gas Pipeline to Facilitate the 
Transport of up to 1.73 Billion Cubic Feet Per Day of Natural Gas, 
Located in various Counties and Parishes in OK, TX, LA and MS, Comment 
Period Ends: 12/24/2007, Contact: Andy Black 1-866-208-3372.
EIS No. 20070477, Final EIS, MMS, 00, PROGRAMMATIC--Alternative Energy 
Development and Production and Alternate Use of Facilities on the Outer 
Continental Shelf, Implementation, Atlantic, Gulf of Mexico, Pacific 
and Alaska, Wait Period Ends: 12/10/2007, Contact: Mary Boatman 703-
787-1662.
EIS No. 20070478, Final EIS, AFS, AK, Helicopter Access to Conduct 
Forest Inventory and Analysis (FIA) in Wilderness, Implementation, 
Selected Preferred Alternative, 1 Tongass and Chugach National Forest, 
AK, Wait Period Ends: 12/10/2007, Contact: Ken Post 907-586-8796.
EIS No. 20070479, Final EIS, GSA, DC, Armed Forces Retirement Home 
(AFRH-W), Proposed Master Plan for Campus Located 3700 North Capitol 
Street, NW., AFRH Trust Fund, Washington, DC, Wait Period Ends: 12/10/
2007, Contact: Joe Woo 202-730-3445.

Amended Notices

EIS No. 20070344, Draft EIS, FHW, VT, Circ-Williston Transportation 
Project, Improvements between I-89 and the Towns Williston and Essex 
and the Village of Essex Junction, City of Burlington, Chittenden 
County, VT, Comment Period Ends: 11/21/2007, Contact: Kenneth R. 
Sikora, Jr. 802-828-4424 . Revision of FR Published 08/10/2007: 
Extending Comment Period from 11/08/2007 to 11/21/2007.
EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and 
Improve to the I-94/1-69 Corridor, To Provide Safe, Efficient and 
Secure Movement of People and Goods across the Canadian--U.S. Border, 
Port Huron Area, St. Clair County, MI, Comment Period Ends: 12/10/2007, 
Contact: Ryan Rizzo 517-702-1833 . Revision to FR Published 09/21/2007: 
Extending Comment Period from 11/05/2007 to 12/10/2007.

[[Page 63580]]

EIS No. 20070422, Draft EIS, FHW, TN, US 127/ TN 28 Improvements, from 
1-40 at Crossville to TN 62 at Clarkrange, Funding, U.S. Army COE 
Section 10 and 404 Permits, Cumberland and Fentress Counties, TN, 
Comment Period Ends: 12/11/2007, Contact: Leigh Ann Tribble 615-781-
5760 . Revision of FR Published 10/12/2007: Correction to Comment 
Period from 11/26/2007 to 12/11/2007.
EIS No. 20070441, Draft Supplement, IBR, CA, Environmental Water 
Account (EWA) Project, Updated Information to Provide an Evaluation of 
2004 Final EIS/EIR Environmental Water Account (EWA) and Effects 
Associated with Extending the Current EWA's through 2011, CA, Comment 
Period Ends: 12/10/2007, Contact: Ms. Sammie Cervantes 916-978-5189. 
Revision of FR Published 10/26/2007: Correction to Title and Contact 
Telephone Number.
EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G, 
Proposed Mine Expansion, Caribou County, ID, Wait Period Ends: 12/26/
2007, Contact: Bill Stout 208-478-6367. Revision of FR Published 10/26/
2007: Extending Comment Period from 11/26/2007 to 12/26/2007.

    Dated: November 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-22038 Filed 11-8-07; 8:45 am]
BILLING CODE 6560-50-P