Conference on Enforcement Policy; Third Notice of Conference, 63576-63577 [E7-22028]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
63576
Federal Register / Vol. 72, No. 217 / Friday, November 9, 2007 / Notices
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001 (a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
VerDate Aug<31>2005
23:48 Nov 08, 2007
Jkt 214001
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
t. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–22027 Filed 11–8–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD07–13–000]
Conference on Enforcement Policy;
Third Notice of Conference
November 2, 2007.
As announced in the ‘‘First Notice of
Conference on Enforcement,’’ issued on
July 11, 2007, the Federal Energy
Regulatory Commission (Commission)
will hold a conference on November 16,
2007, to examine the implementation of
its enforcement authority as expanded
by the Energy Policy Act of 2005 (EPAct
2005).1 The conference will be held in
the Commission Meeting Room at the
Commission’s headquarters located at
888 First Street, NE., Washington, DC
20426. Hearing Room 1 will be available
for over flow.
As stated in the previous notices, the
purpose of the conference is to assess
the enforcement program implemented
by the Commission during the first two
years after passage of EPAct 2005
primarily as it pertains to the additional
subject matter authority and the
expanded civil penalty authority in Part
II of the Federal Power Act 2 and the
Natural Gas Act.3 Standards of conduct,
1 Pub.
L. 109–58, 119 Stat. 594 (2005).
U.S.C. 791a et seq. (2000).
3 15 U.S.C. 717 et seq. (2000).
2 16
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
market monitoring, transparency, and
market manipulation will not be
discussed as they are involved in or
implicated by pending Commission
proceedings. The Commission will
accept comments filed within 30 days
after the conference.
As indicated in the Second Notice of
Conference, issued on October 4, 2007
(Second Notice), this further notice sets
forth the final conference format and
schedule. The agenda has changed
slightly from the concept described in
the Second Notice.4 To begin the
conference, we have added a
presentation by the staff from the Office
of Enforcement. This presentation will
present an overview of the
Commission’s actions and related
enforcement activities during the first
two years of EPAct Enforcement.
Following the staff panel, the second
panel, consisting of former members of
the Commission, will focus on an
overview of enforcement from a broad
policy perspective as well as from their
perspectives of advising clients on how
to comply with the Commission’s rules
and regulations. The discussion will
examine how the Commission can best
achieve compliance with regulatory
requirements, and how it evaluates
enforcement cases, including selfreported violations and matters that
result in no penalty, and how
companies subject to investigation can
best respond to the Commission.
The third panel will address similar
topics, but from the more specific
perspective of energy practitioners.
Since the key goal of enforcement is to
encourage compliance, the panel will
discuss the challenges of working with
clients to comply with the
Commission’s regulations. In that
regard, the panel will include a
presentation from a representative of a
company that, pursuant to a stipulation
and agreement with Commission staff,
developed and implemented a ‘‘best in
class’’ model for regulatory
compliance.5 In addition, the
Commission would like to hear how
practitioners counsel clients on how to
respond to the Commission’s
enforcement staff during an
investigation, including the factors
weighed in the decision to self report.
The fourth panel will focus on
reliability issues and includes
representatives from the Electric
Reliability Organization (the North
American Electric Reliability
Corporation), regional entities, and a
utility. This discussion will look at how
4 See
Attached agenda.
Energy Resources, L.P., 110 FERC ¶
61,205, at P14 (2005).
5 Coral
E:\FR\FM\09NON1.SGM
09NON1
Federal Register / Vol. 72, No. 217 / Friday, November 9, 2007 / Notices
the Regional Entities and the Electric
Reliability Organization are processing
self-reported violations and other
compliance matters, as well as provide
a utility perspective regarding
compliance with the new mandatory
reliability standards. The panel will
address emerging practical issues of
enforcement as well as the
Commission’s own authority to enforce
mandatory reliability standards and its
interest in the most effective way to
achieve compliance with the standards.
As previously noted, all interested
persons are invited to attend the
conference, and there is no registration
fee to attend. The conference will not be
transcribed but will be web cast. A free
web cast of this event will be available
through https://www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
https://www.ferc.gov’s Calendar of Events
and locating this event in the Calendar.
The event will contain a link to its web
cast. The Capitol Connection provides
technical support for the web casts and
offers access to the meeting via phone
bridge for a fee. If you have any
questions, you may visit https://
www.CapitolConnection.org or contact
Danelle Perkowski or David Reininger at
703–993–3100.
FERC conferences and meetings are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an e-mail to accessibility@ferc.gov
or call toll free (866) 208–3372 (voice)
or 202–502–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
Kimberly D. Bose,
Secretary.
mstockstill on PROD1PC66 with NOTICES
Agenda
9–9:15 a.m. Opening Remarks by
Members of the Commission.
9:15–9:45 Panel I: The First Two Years
of EPAct Enforcement.
Susan J. Court, Director, Office of
Enforcement. Anna V. Cochrane, Deputy
Director, Office of Enforcement. Robert
Pease, Director, Division of
Investigations. Lee Ann Watson, Deputy
Director, Division of Investigations.
Stephen J. Harvey, Director, Division of
Energy Market Oversight. Bryan K.
Craig, Director, Division of Audits.
9:45–11 a.m. Panel II: Enforcement
Policy—Broad Policy Perspective.
William L. Massey, Covington and
Burling LLP. Clifford (Mike) M. Naeve,
Skadden, Arps, Slate, Meagher & Flom.
Donald F. Santa, President, Interstate
Natural Gas Association of America.
11–11:10 Break.
VerDate Aug<31>2005
23:48 Nov 08, 2007
Jkt 214001
11:10–12:45 Panel III: Enforcement
Policy—the Practitioners’ View.
Mark Hanafin, CEO, Shell Energy
North America. Barbara K. Heffernan,
Schiff Hardin LLP. Paul Korman, Van
Ness Feldman. Richard Meyer, Senior
Regulatory Counsel, National Rural
Electric Cooperative Association. Mark
Perlis, Dickstein Shapiro LLP. Andrea
Wolfman, Thelen Reid Brown Raysman
& Steiner LLP.
12:45–1:45 Lunch Break.
1:45–3:15 Panel IV: Enforcement of
Reliability Standards.
David W. Hilt, Vice President and
Director of Compliance, North American
Electric Reliability Corporation. Louise
McCarren, CEO, Western Electricity
Coordinating Council. Raymond J.
Palmieri, Vice President & Director—
Compliance, ReliabilityFirst
Corporation. Robert S. (Scott) Henry,
Vice President, Electric System
Operations, Duke Energy.
3:15–3:30 Closing Remarks by
Members of the Commission.
[FR Doc. E7–22028 Filed 11–8–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD08–2–000]
Interconnection Queuing Practices;
Notice of Technical Conference
November 2, 2007.
Take notice that a staff-led technical
conference will be held on Tuesday,
December 11, 2007 from approximately
9 a.m. to 4 p.m. (EST) in the
Commission Meeting Room of the
Federal Energy Regulatory Commission
at 888 First Street NE., Washington, DC
20426. Commissioners may attend. An
additional notice of this technical
conference will be issued at a later date
finalizing the agenda.
In 2003, the Commission issued Order
No. 2003 to standardize the agreements
and procedures related to the
interconnection of large generating
facilities.1 The industry has now had
1 Standardization of Generator Interconnection
Agreements and Procedures, Order No. 2003, 18
CFR § 35, FERC Stats. & Regs. ¶ 31,146 (2003), order
on reh’g, Order No. 2003–A, FERC Stats. & Regs.
¶ 31,160, order on reh’g, Order No. 2003–B, FERC
Stats. & Regs. ¶ 31,171 (2004), order on reh’g, Order
No. 2003–C, FERC Stats. & Regs. ¶ 31,190 (2005),
aff’d sub nom. Nat’l Ass’n of Regulatory Util.
Comm’rs v. FERC, 475 F.3d 1277 (D.C. Cir. 2007).
See also Standardization of Small Generator
Interconnection Agreements and Procedures, Order
No. 2006, FERC Stats. & Regs. ¶ 31,180, order on
reh’g, Order No. 2006–A, FERC Stats. & Regs.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
63577
four years of experience with the
management of interconnection queues
since the issuance of Order No. 2003,
during which time a number of queuerelated issues have arisen. The
Commission understands that a large
amount of new generation is planned to
be added to the nation’s elecrtric system
in the near future, including
unprecedented levels of renewable
generation that may face queue-related
challenges in addition to those faced by
traditional generation.
Through this conference, Commission
staff seeks information as to any queue
issues that may have arisen since
issuance of Order No. 2003 and
solutions that may have been developed
or proposed to deal with those queue
issues. Staff wishes to explore any
existing practices that have proven
effective in addressing interconnection
queue problems experienced by both
traditional and renewable generation.
Commission staff is now soliciting
nominations for speakers at the
technical conference. Persons wishing
to nominate themselves as speakers
should do so using the following
electronic link: https://www.ferc.gov/
whats-new/registration/inter-queuingpractices-12–11-speaker-form.asp. Such
nominations must be made before the
close of business on Friday, November
15, 2007, so that an agenda for the
technical conference can be drafted and
published. Speakers may propose
specific topics that they believe should
be addressed at the conference.
Transcripts of the conference will be
immediately available from Ace
Reporting Company (202–347–3700 or
1–800–336–6646) for a fee. They will be
available for the public on the
Commission’s eLibrary system seven
calendar days after FERC receives the
transcript.
A free webcast of this event will be
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar
of Events and locating this event in the
Calendar. The event will contain a link
to its Web cast. The Capitol Connection
provides technical support for the free
Web casts. It also offers access to this
event via television in the DC area and
via phone bridge for a fee. If you have
any questions, visit https://
www.CapitolConnection.org or contact
¶ 31,196 (2005), order granting clarification, Order
No. 2006–B, FERC Stats. & Regs. ¶ 31,221 (2006),
appeal pending sub nom. Consol. Edison Co. of
N.Y., Inc. v. FERC, Nos. 06–1275, et al. (D.C. Cir.
filed July 14, 2006 and later); Interconnection for
Wind Energy, Order No. 661, FERC Stats. & Regs.
¶ 31,186 (2005), order on reh’g, Order No. 661–A,
FERC Stats. & Regs. ¶ 31,198 (2005).
E:\FR\FM\09NON1.SGM
09NON1
Agencies
[Federal Register Volume 72, Number 217 (Friday, November 9, 2007)]
[Notices]
[Pages 63576-63577]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-22028]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD07-13-000]
Conference on Enforcement Policy; Third Notice of Conference
November 2, 2007.
As announced in the ``First Notice of Conference on Enforcement,''
issued on July 11, 2007, the Federal Energy Regulatory Commission
(Commission) will hold a conference on November 16, 2007, to examine
the implementation of its enforcement authority as expanded by the
Energy Policy Act of 2005 (EPAct 2005).\1\ The conference will be held
in the Commission Meeting Room at the Commission's headquarters located
at 888 First Street, NE., Washington, DC 20426. Hearing Room 1 will be
available for over flow.
---------------------------------------------------------------------------
\1\ Pub. L. 109-58, 119 Stat. 594 (2005).
---------------------------------------------------------------------------
As stated in the previous notices, the purpose of the conference is
to assess the enforcement program implemented by the Commission during
the first two years after passage of EPAct 2005 primarily as it
pertains to the additional subject matter authority and the expanded
civil penalty authority in Part II of the Federal Power Act \2\ and the
Natural Gas Act.\3\ Standards of conduct, market monitoring,
transparency, and market manipulation will not be discussed as they are
involved in or implicated by pending Commission proceedings. The
Commission will accept comments filed within 30 days after the
conference.
---------------------------------------------------------------------------
\2\ 16 U.S.C. 791a et seq. (2000).
\3\ 15 U.S.C. 717 et seq. (2000).
---------------------------------------------------------------------------
As indicated in the Second Notice of Conference, issued on October
4, 2007 (Second Notice), this further notice sets forth the final
conference format and schedule. The agenda has changed slightly from
the concept described in the Second Notice.\4\ To begin the conference,
we have added a presentation by the staff from the Office of
Enforcement. This presentation will present an overview of the
Commission's actions and related enforcement activities during the
first two years of EPAct Enforcement.
---------------------------------------------------------------------------
\4\ See Attached agenda.
---------------------------------------------------------------------------
Following the staff panel, the second panel, consisting of former
members of the Commission, will focus on an overview of enforcement
from a broad policy perspective as well as from their perspectives of
advising clients on how to comply with the Commission's rules and
regulations. The discussion will examine how the Commission can best
achieve compliance with regulatory requirements, and how it evaluates
enforcement cases, including self-reported violations and matters that
result in no penalty, and how companies subject to investigation can
best respond to the Commission.
The third panel will address similar topics, but from the more
specific perspective of energy practitioners. Since the key goal of
enforcement is to encourage compliance, the panel will discuss the
challenges of working with clients to comply with the Commission's
regulations. In that regard, the panel will include a presentation from
a representative of a company that, pursuant to a stipulation and
agreement with Commission staff, developed and implemented a ``best in
class'' model for regulatory compliance.\5\ In addition, the Commission
would like to hear how practitioners counsel clients on how to respond
to the Commission's enforcement staff during an investigation,
including the factors weighed in the decision to self report.
---------------------------------------------------------------------------
\5\ Coral Energy Resources, L.P., 110 FERC ] 61,205, at P14
(2005).
---------------------------------------------------------------------------
The fourth panel will focus on reliability issues and includes
representatives from the Electric Reliability Organization (the North
American Electric Reliability Corporation), regional entities, and a
utility. This discussion will look at how
[[Page 63577]]
the Regional Entities and the Electric Reliability Organization are
processing self-reported violations and other compliance matters, as
well as provide a utility perspective regarding compliance with the new
mandatory reliability standards. The panel will address emerging
practical issues of enforcement as well as the Commission's own
authority to enforce mandatory reliability standards and its interest
in the most effective way to achieve compliance with the standards.
As previously noted, all interested persons are invited to attend
the conference, and there is no registration fee to attend. The
conference will not be transcribed but will be web cast. A free web
cast of this event will be available through https://www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to https://www.ferc.gov's Calendar of Events and locating
this event in the Calendar. The event will contain a link to its web
cast. The Capitol Connection provides technical support for the web
casts and offers access to the meeting via phone bridge for a fee. If
you have any questions, you may visit https://www.CapitolConnection.org
or contact Danelle Perkowski or David Reininger at 703-993-3100.
FERC conferences and meetings are accessible under section 508 of
the Rehabilitation Act of 1973. For accessibility accommodations please
send an e-mail to accessibility@ferc.gov or call toll free (866) 208-
3372 (voice) or 202-502-8659 (TTY), or send a fax to 202-208-2106 with
the required accommodations.
Kimberly D. Bose,
Secretary.
Agenda
9-9:15 a.m. Opening Remarks by Members of the Commission.
9:15-9:45 Panel I: The First Two Years of EPAct Enforcement.
Susan J. Court, Director, Office of Enforcement. Anna V. Cochrane,
Deputy Director, Office of Enforcement. Robert Pease, Director,
Division of Investigations. Lee Ann Watson, Deputy Director, Division
of Investigations. Stephen J. Harvey, Director, Division of Energy
Market Oversight. Bryan K. Craig, Director, Division of Audits.
9:45-11 a.m. Panel II: Enforcement Policy--Broad Policy Perspective.
William L. Massey, Covington and Burling LLP. Clifford (Mike) M.
Naeve, Skadden, Arps, Slate, Meagher & Flom. Donald F. Santa,
President, Interstate Natural Gas Association of America.
11-11:10 Break.
11:10-12:45 Panel III: Enforcement Policy--the Practitioners' View.
Mark Hanafin, CEO, Shell Energy North America. Barbara K.
Heffernan, Schiff Hardin LLP. Paul Korman, Van Ness Feldman. Richard
Meyer, Senior Regulatory Counsel, National Rural Electric Cooperative
Association. Mark Perlis, Dickstein Shapiro LLP. Andrea Wolfman, Thelen
Reid Brown Raysman & Steiner LLP.
12:45-1:45 Lunch Break.
1:45-3:15 Panel IV: Enforcement of Reliability Standards.
David W. Hilt, Vice President and Director of Compliance, North
American Electric Reliability Corporation. Louise McCarren, CEO,
Western Electricity Coordinating Council. Raymond J. Palmieri, Vice
President & Director--Compliance, ReliabilityFirst Corporation. Robert
S. (Scott) Henry, Vice President, Electric System Operations, Duke
Energy.
3:15-3:30 Closing Remarks by Members of the Commission.
[FR Doc. E7-22028 Filed 11-8-07; 8:45 am]