Download as PDF 60846 Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices rmajette on PROD1PC64 with NOTICES clarification of impacts to migratory birds, regeneration of big sagebrush, and mitigation of impacts from illegal ORV use. Rating LO. EIS No. 20070315, ERP No. D–NOA– L91029–AK, Alaska Eskimo Whaling Commission for a Subsistence Hunt on Bowhead Whale for the Years 2008 through 2012 for Issuing Annual Quotas, Proposes to Authorize Subsistence Harvests of the Western Arctic Stock of Bowhead Whales, Bering, Chukchi and Beaufort Seas, AK. Summary: While EPA does not object to the proposed action, it requested clarification on the exchange of nonfood portions of the whales between native villages as a commodity. Rating LO EIS No. 20070365, ERP No. D–USA– A15000–00, PROGRAMMATIC— Army Growth and Force Structure Realignment, Implementation, Nationwide. Summary: EPA does not object to the proposed action. Rating LO. EIS No. 20070393, ERP No. DS–AFS– J65424–MT, Fishtrap Project, Updated Information on Past Maintenance/ Restorative Treatments within Old Growth Stands, 200 Timber Harvest, Prescribed Burning, Road Construction and Other Restoration Activities, Lolo National Forest, Plains/Thompson Falls Ranger District, Sanders County, MT. Summary: EPA does not object to the proposed action. Rating LO. Final EISs EIS No. 20070260, ERP No. F–COE– K36142–CA, PROGRAMMATIC—San Luis Obispo Creek Watershed, Waterway Management Plan, Stream Maintenance and Management Plan, City of San Luis Obispo and County of San Luis Obispo, Community of Avila Beach, San Luis Obispo County, CA. Summary: EPA’s previous issues have been resolved; therefore, EPA does not object to the proposed action. EIS No. 20070292, ERP No. F–COE– K36055–CA, San Luis Rey Flood Control Project, Operation and Maintenance of the Vegetation and Sediment Management, from College Blvd to the Pacific Ocean, San Diego County, CA. Summary: EPA continues to have environmental concerns because the preferred alternative may not represent the least environmentally damaging practicable alternative, as required under the Clean Water Act section 404(b)(1) Guidelines. VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 EIS No. 20070318, ERP No. F–FHW– K40257–CA, Los Banos Bypass Project, Construct from CA–152 in Merced County beginning near Volta Road west to Los Banos, bypassing Los Banos, ending near the Santa Fe Grade Road, U.S. Army COE Section 404 Permit, Merced County, CA. Summary: EPA continues to have environmental concerns about the proposed project related to induced growth. Also, EPA recommends that the project sponsor develop a strategy to facilitate protection of valuable habitat areas. EIS No. 20070379, ERP No. F–AFS– L65525–AK, Baht Timber Sale Project, Proposes to Harvest Timber and Temporary Road Construction on Zarembo Island, Wrangell Ranger District, Tongass National Forest, AK. Summary: EPA continues to have concerns about potential impacts to water quality and impacts to old growth habitat, and recommends water quality monitoring, preservation of riparian buffers and reduced new road construction. EIS No. 20070402, ERP No. F–FRC– K03030–00, Phoenix Expansion Project, Construction and Operation of Existing Natural Gas Transmission Pipeline, Right-of-Way Grant and Temporary Use Permit, San Juan and McKinley Counties, NM and Pinal and Maricopa Counties, AZ. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070058, ERP No. FA–FHW– E40325–NC, Western Section of the Winston-Salem Northern Beltway, Updated Information, U.S. 158 north to U.S. 52, TIP Project No. R–2247, Forsyth County, NC. (THIS EIS #20070058 AND EIS #20070057 ARE COMBINED IN A SINGLE DOCUMENT.) Summary: EPA continues to have environmental concerns about the large bypass regarding 7–8 linear miles of stream impacts, sedimentation and erosion control, terrestrial forest habitat losses and impacts to migratory birds. EPA requests that the Record of Decision disclose plans to mitigate these adverse impacts. EIS No. 20070384, ERP No. FS–FHW– E40714–GA, U.S. 411 Connector, From U.S. 411/GA–20 Interchange with U.S. 41 to U.S. 411 Interchange with I–75, Updated Information, Funding and U.S. Army COE Section 404 Permit, Bartow County, GA. Summary: EPA continues to have environmental concerns about the preferred alternative regarding impacts to jurisdictional wetlands, regulatory PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 floodplains, and the loss of upland forest habitat. However, EPA supports the mitigation measures and monitoring programs as described in the Final Supplemental EIS. Dated: October 23, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–21089 Filed 10–25–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6692–3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 10/15/2007 through 10/19/2007. Pursuant to 40 CFR 1506.9. EIS No. 20070435, Draft EIS, BLM, UT, Richfield Field Office Resource Management Plan, Implementation, Future Management of the Public Lands and Resource, Glen Canyon National Recreation Area, Capitol Reef and Canyonlands National Parks, Sanpete, Sevier, Piute, Wayne and Garfield Counties, UT. Comment Period Ends: 01/24/2008. Contact: Wayne Wetzel, 435–896–1500. EIS No. 20070436, Draft EIS, FHW, ME, Wiscasset Route 1 Corridor Study Project, To Relieve Traffic Congestion and Improve Safety, U.S. Army COE section 404 Permit, Wiscasset and Edgecomb Counties, ME. Comment Period Ends: 12/21/2007. Contact: Mark Asselmann, 207622–8350. EIS No. 20070437, Draft EIS, NPS, HI, PROGRAMMATIC EIS—Ala Kahakai National Historic Trail Comprehensive Management Plan, To Provide Long-Term Direction for Natural and Cultural Resource, Island of Hawii, HI. Comment Period Ends: 12/26/2007. Contact: Aric Arakaki 808–326–6012. EIS No. 20070438, Final Supplement, NOA, NC, Atlantic Sea Scallop Fishery Management Plan (FMP), Amendment 11, Implementation to Control Capacity and Mortality in the General Category Scallop Fishery, Gulf of Maine, Georges Bank, NC. Wait Period Ends: 11/26/2007. Contact: Patricia A. Kurkal, 978–281– 9250. EIS No. 20070439, Draft EIS, BOP, AL, Aliceville, Alabama Area, Proposed E:\FR\FM\26OCN1.SGM 26OCN1 rmajette on PROD1PC64 with NOTICES Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices Federal Correctional Complex, To Address the Growing Federal Inmate Population, Pickens County, AL. Comment Period Ends: 12/10/2007. Contact: Pamela J. Candler, 202–514– 6470. EIS No. 20070440, Draft EIS, FHW, UT, Mountain View Corridor (MVC) Project, Proposed Transportation Improvement 2030 Travel Demand in Western Salt Lake County south of I– 80 and west of Bangerter Highway and in northwestern Utah County of I–15, south of the Salt Lake County Line, and north of Utah Lake, Salt Lake and Utah County, UT. Comment Period Ends: 12/24/2007. Contact: Edward Woolford, P.E. 801–963– 0182. EIS No. 20070441, Draft Supplement, IBR, CA, PROGRAMMATIC— Environmental Water Account (EWA) Project, Updated Information to Provide an Evaluation of 2004 Final EIS/EIR Environmental Water Account (EWA) and Effects Associated with Extending the Current EWA’s through 2011, CALFED Bay-Delta Programs, Endangered Species Act section 7 and U.S. Army COE Section 10 Permit, CA. Comment Period Ends: 12/10/ 2007. Contact: Ms. Sammie Cervantes, 916–978–5104. EIS No. 20070442, Final EIS, FHW, CA, Interstate 5/Cosumnes River Boulevard Interchange Project, Extension of Cosumnes River Boulevard from Franklin Boulevard to Freeport Boulevard with an Interchange at Interstate 5, South of the Pocket/Meadowview Road Interchange and North of the Laguna Boulevard Interchange, City of Sacramento, Sacramento County, CA. Wait Period Ends: 11/26/2007. Contact: Cesar E. Perez, 916–498– 5065. EIS No. 20070443, Draft Supplement, FTA, CA, Third Street Light Rail Phase 2, Updated Information on the Central Subway Project Area, Funding, San Francisco Municipal Transportation Agency, in the City and County San Francisco, CA. Comment Period Ends: 12/10/2007. Contact: Ray Sukys, 415–744–3133. EIS No. 20070444, Final EIS, USA, GA, Fort Benning U.S. Army Infantry Center, Base Realignment and Closure (BRAC) 2005 and Transformation Actions, Implementation, Chattahoochee and Muscogee Counties, GA. Wait Period Ends: 11/ 26/2007. Contact: John Brent, 706– 545–2180. EIS No. 20070445, Draft EIS, USN, 00, Shock Trail of the MESA VERDE (LPD 19), San Antonio (LPD 17) Class Ship VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 designated as the Shock Ship for Proposed Shock Trail, Possible Offshore Locations are Naval Station Norfolk, VA; Naval Station Mayport, FL; and Naval Air Station Pensacola, FL. Comment Period Ends: 12/10/ 2007. Contact: Donald Shaver, 703– 412–7521. EIS No. 20070446, Final EIS, FHW, IN, I–69 Evansville to Indianapolis Project, I–69 Tier 2 Section 1: Evansville to Oakland City, from 1–64 to IN–64, Preferred Alternative is 4, Gibson and Warrick Counties, IN. Wait Period Ends: 11/26/2007. Contact: Anthony DeSimone, 317– 226–5307. EIS No. 20070447, Draft EIS, FHW, CA, Marin-Sonoma Narrows (MSN) HOV Widening Project, Propose to Relieve Recurrent Congestion along U.S. 101 south of the Route 37 Interchange in the City of Novato (Marin County) and ends north of the Corona Road Overcrossing in the City of Petaluma (Sonoma County), Marin and Sonoma Counties, CA. Comment Period Ends: 12/14/2007. Contact: Cesar E. Perez, 916–498–5065. EIS No. 20070448, Final EIS, USA, 00, PROGRAMMATIC—Army Growth and Force Structure Realignment, Implementation, Nationwide. Wait Period Ends: 11/26/2007. Contact: Mike Ackerman, 410–436–2522. EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G, Proposed Mine Expansion, Caribou County, ID. Wait Period Ends: 11/26/ 2007. Contact: Bill Stout 208–478– 6367. EIS No. 20070450, Draft Supplement, WPA, 00, Big Stone II Power Plant and Transmission Project, Addresses the Impacts of Changes to the Proposed Action relative to Cooling Alternatives and the Use of Groundwater as Backup Water Source, U.S. Army COE Section 10 and 404 Permits, Grant County, SD and Big Stone County, MN. Comment Period Ends: 12/10/2007. Contact: Nancy Werdel, 720–962–7251. EIS No. 20070451, Draft EIS, AFS, UT, Indian Springs Road Realignment, Reducing Adverse Impacts to Watershed and Fisheries, U.S. Army COE Section 404 Permit, Uinta National Forest, Heber Ranger District, Wasatch County, UT. Comment Period Ends: 12/10/2007. Contact: Jim Percy, 435–654–0470. Dated: October 23, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–21102 Filed 10–25–07; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 60847 ENVIRONMENTAL PROTECTION AGENCY [Docket# EPA–RO4–SFUND–2007–1052; FRL–8487–9] B&B Manufacturing Superfund Site; Mobile, Mobile County, AL; Notice of Settlements Environmental Protection Agency (EPA). ACTION: Notice of settlements. AGENCY: SUMMARY: Under Section 122(h) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the United States Environmental Protection Agency has entered into three separate settlements for reimbursement of past response costs concerning the B&B Manufacturing Superfund Site located in Mobile, Mobile County, Alabama. DATES: The Agency will consider public comments on the settlements until November 26, 2007. The Agency will consider all comments received and may modify or withdraw its consent to the settlements if comments received disclose facts or considerations which indicate that the settlements are inappropriate, improper, or inadequate. ADDRESSES: Copies of the settlements are available from Ms. Paula V. Batchelor. Submit your comments, identified by Docket ID No. EPA–RO4– SFUND–2007–1052 or Site name B&B Manufacturing Superfund Site by one of the following methods: • https://www.regulations.gov: Follow the on-line instructions for submitting comments. • E-mail: Batchelor.Paula@epa.gov. • Fax: 404/562–8842/Attn: Paula V. Batchelor. Mail: Ms. Paula V. Batchelor, U.S. EPA Region 4, SD–SEIMB, 61 Forsyth Street, SW., Atlanta, Georgia 30303. ‘‘In addition, please mail a copy of your comments on the information collection provisions to the Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attn: Desk Officer for EPA, 725 17th St., NW., Washington, DC 20503. Instructions: Direct your comments to Docket ID No. EPA–RO4–SFUND–2007– 1052. EPA’s policy is that all comments received will be included in the public docket without change and may be made available online at www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you E:\FR\FM\26OCN1.SGM 26OCN1

Agencies

[Federal Register Volume 72, Number 207 (Friday, October 26, 2007)]
[Notices]
[Pages 60846-60847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-21102]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6692-3]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 10/15/2007 through 10/19/2007.
Pursuant to 40 CFR 1506.9.

EIS No. 20070435, Draft EIS, BLM, UT, Richfield Field Office Resource 
Management Plan, Implementation, Future Management of the Public Lands 
and Resource, Glen Canyon National Recreation Area, Capitol Reef and 
Canyonlands National Parks, Sanpete, Sevier, Piute, Wayne and Garfield 
Counties, UT. Comment Period Ends: 01/24/2008. Contact: Wayne Wetzel, 
435-896-1500.
EIS No. 20070436, Draft EIS, FHW, ME, Wiscasset Route 1 Corridor Study 
Project, To Relieve Traffic Congestion and Improve Safety, U.S. Army 
COE section 404 Permit, Wiscasset and Edgecomb Counties, ME. Comment 
Period Ends: 12/21/2007. Contact: Mark Asselmann, 207622-8350.
EIS No. 20070437, Draft EIS, NPS, HI, PROGRAMMATIC EIS--Ala Kahakai 
National Historic Trail Comprehensive Management Plan, To Provide Long-
Term Direction for Natural and Cultural Resource, Island of Hawii, HI. 
Comment Period Ends: 12/26/2007. Contact: Aric Arakaki 808-326-6012.
EIS No. 20070438, Final Supplement, NOA, NC, Atlantic Sea Scallop 
Fishery Management Plan (FMP), Amendment 11, Implementation to Control 
Capacity and Mortality in the General Category Scallop Fishery, Gulf of 
Maine, Georges Bank, NC. Wait Period Ends: 11/26/2007. Contact: 
Patricia A. Kurkal, 978-281-9250.
EIS No. 20070439, Draft EIS, BOP, AL, Aliceville, Alabama Area, 
Proposed

[[Page 60847]]

Federal Correctional Complex, To Address the Growing Federal Inmate 
Population, Pickens County, AL. Comment Period Ends: 12/10/2007. 
Contact: Pamela J. Candler, 202-514-6470.
EIS No. 20070440, Draft EIS, FHW, UT, Mountain View Corridor (MVC) 
Project, Proposed Transportation Improvement 2030 Travel Demand in 
Western Salt Lake County south of I-80 and west of Bangerter Highway 
and in northwestern Utah County of I-15, south of the Salt Lake County 
Line, and north of Utah Lake, Salt Lake and Utah County, UT. Comment 
Period Ends: 12/24/2007. Contact: Edward Woolford, P.E. 801-963-0182.
EIS No. 20070441, Draft Supplement, IBR, CA, PROGRAMMATIC--
Environmental Water Account (EWA) Project, Updated Information to 
Provide an Evaluation of 2004 Final EIS/EIR Environmental Water Account 
(EWA) and Effects Associated with Extending the Current EWA's through 
2011, CALFED Bay-Delta Programs, Endangered Species Act section 7 and 
U.S. Army COE Section 10 Permit, CA. Comment Period Ends: 12/10/2007. 
Contact: Ms. Sammie Cervantes, 916-978-5104.
EIS No. 20070442, Final EIS, FHW, CA, Interstate 5/Cosumnes River 
Boulevard Interchange Project, Extension of Cosumnes River Boulevard 
from Franklin Boulevard to Freeport Boulevard with an Interchange at 
Interstate 5, South of the Pocket/Meadowview Road Interchange and North 
of the Laguna Boulevard Interchange, City of Sacramento, Sacramento 
County, CA. Wait Period Ends: 11/26/2007. Contact: Cesar E. Perez, 916-
498-5065.
EIS No. 20070443, Draft Supplement, FTA, CA, Third Street Light Rail 
Phase 2, Updated Information on the Central Subway Project Area, 
Funding, San Francisco Municipal Transportation Agency, in the City and 
County San Francisco, CA. Comment Period Ends: 12/10/2007. Contact: Ray 
Sukys, 415-744-3133.
EIS No. 20070444, Final EIS, USA, GA, Fort Benning U.S. Army Infantry 
Center, Base Realignment and Closure (BRAC) 2005 and Transformation 
Actions, Implementation, Chattahoochee and Muscogee Counties, GA. Wait 
Period Ends: 11/26/2007. Contact: John Brent, 706-545-2180.
EIS No. 20070445, Draft EIS, USN, 00, Shock Trail of the MESA VERDE 
(LPD 19), San Antonio (LPD 17) Class Ship designated as the Shock Ship 
for Proposed Shock Trail, Possible Offshore Locations are Naval Station 
Norfolk, VA; Naval Station Mayport, FL; and Naval Air Station 
Pensacola, FL. Comment Period Ends: 12/10/2007. Contact: Donald Shaver, 
703-412-7521.
EIS No. 20070446, Final EIS, FHW, IN, I-69 Evansville to Indianapolis 
Project, I-69 Tier 2 Section 1: Evansville to Oakland City, from 1-64 
to IN-64, Preferred Alternative is 4, Gibson and Warrick Counties, IN. 
Wait Period Ends: 11/26/2007. Contact: Anthony DeSimone, 317-226-5307.
EIS No. 20070447, Draft EIS, FHW, CA, Marin-Sonoma Narrows (MSN) HOV 
Widening Project, Propose to Relieve Recurrent Congestion along U.S. 
101 south of the Route 37 Interchange in the City of Novato (Marin 
County) and ends north of the Corona Road Overcrossing in the City of 
Petaluma (Sonoma County), Marin and Sonoma Counties, CA. Comment Period 
Ends: 12/14/2007. Contact: Cesar E. Perez, 916-498-5065.
EIS No. 20070448, Final EIS, USA, 00, PROGRAMMATIC--Army Growth and 
Force Structure Realignment, Implementation, Nationwide. Wait Period 
Ends: 11/26/2007. Contact: Mike Ackerman, 410-436-2522.
EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G, 
Proposed Mine Expansion, Caribou County, ID. Wait Period Ends: 11/26/
2007. Contact: Bill Stout 208-478-6367.
EIS No. 20070450, Draft Supplement, WPA, 00, Big Stone II Power Plant 
and Transmission Project, Addresses the Impacts of Changes to the 
Proposed Action relative to Cooling Alternatives and the Use of 
Groundwater as Backup Water Source, U.S. Army COE Section 10 and 404 
Permits, Grant County, SD and Big Stone County, MN. Comment Period 
Ends: 12/10/2007. Contact: Nancy Werdel, 720-962-7251.
EIS No. 20070451, Draft EIS, AFS, UT, Indian Springs Road Realignment, 
Reducing Adverse Impacts to Watershed and Fisheries, U.S. Army COE 
Section 404 Permit, Uinta National Forest, Heber Ranger District, 
Wasatch County, UT. Comment Period Ends: 12/10/2007. Contact: Jim 
Percy, 435-654-0470.

    Dated: October 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-21102 Filed 10-25-07; 8:45 am]