Environmental Impacts Statements; Notice of Availability, 60846-60847 [E7-21102]
Download as PDF
60846
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices
rmajette on PROD1PC64 with NOTICES
clarification of impacts to migratory
birds, regeneration of big sagebrush, and
mitigation of impacts from illegal ORV
use. Rating LO.
EIS No. 20070315, ERP No. D–NOA–
L91029–AK, Alaska Eskimo Whaling
Commission for a Subsistence Hunt
on Bowhead Whale for the Years 2008
through 2012 for Issuing Annual
Quotas, Proposes to Authorize
Subsistence Harvests of the Western
Arctic Stock of Bowhead Whales,
Bering, Chukchi and Beaufort Seas,
AK.
Summary: While EPA does not object
to the proposed action, it requested
clarification on the exchange of nonfood portions of the whales between
native villages as a commodity. Rating
LO
EIS No. 20070365, ERP No. D–USA–
A15000–00, PROGRAMMATIC—
Army Growth and Force Structure
Realignment, Implementation,
Nationwide.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20070393, ERP No. DS–AFS–
J65424–MT, Fishtrap Project, Updated
Information on Past Maintenance/
Restorative Treatments within Old
Growth Stands, 200 Timber Harvest,
Prescribed Burning, Road
Construction and Other Restoration
Activities, Lolo National Forest,
Plains/Thompson Falls Ranger
District, Sanders County, MT.
Summary: EPA does not object to the
proposed action. Rating LO.
Final EISs
EIS No. 20070260, ERP No. F–COE–
K36142–CA, PROGRAMMATIC—San
Luis Obispo Creek Watershed,
Waterway Management Plan, Stream
Maintenance and Management Plan,
City of San Luis Obispo and County
of San Luis Obispo, Community of
Avila Beach, San Luis Obispo County,
CA.
Summary: EPA’s previous issues have
been resolved; therefore, EPA does not
object to the proposed action.
EIS No. 20070292, ERP No. F–COE–
K36055–CA, San Luis Rey Flood
Control Project, Operation and
Maintenance of the Vegetation and
Sediment Management, from College
Blvd to the Pacific Ocean, San Diego
County, CA.
Summary: EPA continues to have
environmental concerns because the
preferred alternative may not represent
the least environmentally damaging
practicable alternative, as required
under the Clean Water Act section
404(b)(1) Guidelines.
VerDate Aug<31>2005
15:23 Oct 25, 2007
Jkt 214001
EIS No. 20070318, ERP No. F–FHW–
K40257–CA, Los Banos Bypass
Project, Construct from CA–152 in
Merced County beginning near Volta
Road west to Los Banos, bypassing
Los Banos, ending near the Santa Fe
Grade Road, U.S. Army COE Section
404 Permit, Merced County, CA.
Summary: EPA continues to have
environmental concerns about the
proposed project related to induced
growth. Also, EPA recommends that the
project sponsor develop a strategy to
facilitate protection of valuable habitat
areas.
EIS No. 20070379, ERP No. F–AFS–
L65525–AK, Baht Timber Sale Project,
Proposes to Harvest Timber and
Temporary Road Construction on
Zarembo Island, Wrangell Ranger
District, Tongass National Forest, AK.
Summary: EPA continues to have
concerns about potential impacts to
water quality and impacts to old growth
habitat, and recommends water quality
monitoring, preservation of riparian
buffers and reduced new road
construction.
EIS No. 20070402, ERP No. F–FRC–
K03030–00, Phoenix Expansion
Project, Construction and Operation
of Existing Natural Gas Transmission
Pipeline, Right-of-Way Grant and
Temporary Use Permit, San Juan and
McKinley Counties, NM and Pinal
and Maricopa Counties, AZ.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070058, ERP No. FA–FHW–
E40325–NC, Western Section of the
Winston-Salem Northern Beltway,
Updated Information, U.S. 158 north
to U.S. 52, TIP Project No. R–2247,
Forsyth County, NC. (THIS EIS
#20070058 AND EIS #20070057 ARE
COMBINED IN A SINGLE
DOCUMENT.)
Summary: EPA continues to have
environmental concerns about the large
bypass regarding 7–8 linear miles of
stream impacts, sedimentation and
erosion control, terrestrial forest habitat
losses and impacts to migratory birds.
EPA requests that the Record of
Decision disclose plans to mitigate these
adverse impacts.
EIS No. 20070384, ERP No. FS–FHW–
E40714–GA, U.S. 411 Connector,
From U.S. 411/GA–20 Interchange
with U.S. 41 to U.S. 411 Interchange
with I–75, Updated Information,
Funding and U.S. Army COE Section
404 Permit, Bartow County, GA.
Summary: EPA continues to have
environmental concerns about the
preferred alternative regarding impacts
to jurisdictional wetlands, regulatory
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
floodplains, and the loss of upland
forest habitat. However, EPA supports
the mitigation measures and monitoring
programs as described in the Final
Supplemental EIS.
Dated: October 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–21089 Filed 10–25–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6692–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 10/15/2007 through 10/19/2007.
Pursuant to 40 CFR 1506.9.
EIS No. 20070435, Draft EIS, BLM, UT,
Richfield Field Office Resource
Management Plan, Implementation,
Future Management of the Public
Lands and Resource, Glen Canyon
National Recreation Area, Capitol
Reef and Canyonlands National Parks,
Sanpete, Sevier, Piute, Wayne and
Garfield Counties, UT. Comment
Period Ends: 01/24/2008. Contact:
Wayne Wetzel, 435–896–1500.
EIS No. 20070436, Draft EIS, FHW, ME,
Wiscasset Route 1 Corridor Study
Project, To Relieve Traffic Congestion
and Improve Safety, U.S. Army COE
section 404 Permit, Wiscasset and
Edgecomb Counties, ME. Comment
Period Ends: 12/21/2007. Contact:
Mark Asselmann, 207622–8350.
EIS No. 20070437, Draft EIS, NPS, HI,
PROGRAMMATIC EIS—Ala Kahakai
National Historic Trail
Comprehensive Management Plan, To
Provide Long-Term Direction for
Natural and Cultural Resource, Island
of Hawii, HI. Comment Period Ends:
12/26/2007. Contact: Aric Arakaki
808–326–6012.
EIS No. 20070438, Final Supplement,
NOA, NC, Atlantic Sea Scallop
Fishery Management Plan (FMP),
Amendment 11, Implementation to
Control Capacity and Mortality in the
General Category Scallop Fishery,
Gulf of Maine, Georges Bank, NC.
Wait Period Ends: 11/26/2007.
Contact: Patricia A. Kurkal, 978–281–
9250.
EIS No. 20070439, Draft EIS, BOP, AL,
Aliceville, Alabama Area, Proposed
E:\FR\FM\26OCN1.SGM
26OCN1
rmajette on PROD1PC64 with NOTICES
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices
Federal Correctional Complex, To
Address the Growing Federal Inmate
Population, Pickens County, AL.
Comment Period Ends: 12/10/2007.
Contact: Pamela J. Candler, 202–514–
6470.
EIS No. 20070440, Draft EIS, FHW, UT,
Mountain View Corridor (MVC)
Project, Proposed Transportation
Improvement 2030 Travel Demand in
Western Salt Lake County south of I–
80 and west of Bangerter Highway
and in northwestern Utah County of
I–15, south of the Salt Lake County
Line, and north of Utah Lake, Salt
Lake and Utah County, UT. Comment
Period Ends: 12/24/2007. Contact:
Edward Woolford, P.E. 801–963–
0182.
EIS No. 20070441, Draft Supplement,
IBR, CA, PROGRAMMATIC—
Environmental Water Account (EWA)
Project, Updated Information to
Provide an Evaluation of 2004 Final
EIS/EIR Environmental Water
Account (EWA) and Effects
Associated with Extending the
Current EWA’s through 2011,
CALFED Bay-Delta Programs,
Endangered Species Act section 7 and
U.S. Army COE Section 10 Permit,
CA. Comment Period Ends: 12/10/
2007. Contact: Ms. Sammie Cervantes,
916–978–5104.
EIS No. 20070442, Final EIS, FHW, CA,
Interstate 5/Cosumnes River
Boulevard Interchange Project,
Extension of Cosumnes River
Boulevard from Franklin Boulevard to
Freeport Boulevard with an
Interchange at Interstate 5, South of
the Pocket/Meadowview Road
Interchange and North of the Laguna
Boulevard Interchange, City of
Sacramento, Sacramento County, CA.
Wait Period Ends: 11/26/2007.
Contact: Cesar E. Perez, 916–498–
5065.
EIS No. 20070443, Draft Supplement,
FTA, CA, Third Street Light Rail
Phase 2, Updated Information on the
Central Subway Project Area,
Funding, San Francisco Municipal
Transportation Agency, in the City
and County San Francisco, CA.
Comment Period Ends: 12/10/2007.
Contact: Ray Sukys, 415–744–3133.
EIS No. 20070444, Final EIS, USA, GA,
Fort Benning U.S. Army Infantry
Center, Base Realignment and Closure
(BRAC) 2005 and Transformation
Actions, Implementation,
Chattahoochee and Muscogee
Counties, GA. Wait Period Ends: 11/
26/2007. Contact: John Brent, 706–
545–2180.
EIS No. 20070445, Draft EIS, USN, 00,
Shock Trail of the MESA VERDE (LPD
19), San Antonio (LPD 17) Class Ship
VerDate Aug<31>2005
15:23 Oct 25, 2007
Jkt 214001
designated as the Shock Ship for
Proposed Shock Trail, Possible
Offshore Locations are Naval Station
Norfolk, VA; Naval Station Mayport,
FL; and Naval Air Station Pensacola,
FL. Comment Period Ends: 12/10/
2007. Contact: Donald Shaver, 703–
412–7521.
EIS No. 20070446, Final EIS, FHW, IN,
I–69 Evansville to Indianapolis
Project, I–69 Tier 2 Section 1:
Evansville to Oakland City, from 1–64
to IN–64, Preferred Alternative is 4,
Gibson and Warrick Counties, IN.
Wait Period Ends: 11/26/2007.
Contact: Anthony DeSimone, 317–
226–5307.
EIS No. 20070447, Draft EIS, FHW, CA,
Marin-Sonoma Narrows (MSN) HOV
Widening Project, Propose to Relieve
Recurrent Congestion along U.S. 101
south of the Route 37 Interchange in
the City of Novato (Marin County) and
ends north of the Corona Road
Overcrossing in the City of Petaluma
(Sonoma County), Marin and Sonoma
Counties, CA. Comment Period Ends:
12/14/2007. Contact: Cesar E. Perez,
916–498–5065.
EIS No. 20070448, Final EIS, USA, 00,
PROGRAMMATIC—Army Growth
and Force Structure Realignment,
Implementation, Nationwide. Wait
Period Ends: 11/26/2007. Contact:
Mike Ackerman, 410–436–2522.
EIS No. 20070449, Final EIS, BLM, ID,
Smoky Canyon Mine Panels F & G,
Proposed Mine Expansion, Caribou
County, ID. Wait Period Ends: 11/26/
2007. Contact: Bill Stout 208–478–
6367.
EIS No. 20070450, Draft Supplement,
WPA, 00, Big Stone II Power Plant and
Transmission Project, Addresses the
Impacts of Changes to the Proposed
Action relative to Cooling
Alternatives and the Use of
Groundwater as Backup Water
Source, U.S. Army COE Section 10
and 404 Permits, Grant County, SD
and Big Stone County, MN. Comment
Period Ends: 12/10/2007. Contact:
Nancy Werdel, 720–962–7251.
EIS No. 20070451, Draft EIS, AFS, UT,
Indian Springs Road Realignment,
Reducing Adverse Impacts to
Watershed and Fisheries, U.S. Army
COE Section 404 Permit, Uinta
National Forest, Heber Ranger
District, Wasatch County, UT.
Comment Period Ends: 12/10/2007.
Contact: Jim Percy, 435–654–0470.
Dated: October 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–21102 Filed 10–25–07; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
60847
ENVIRONMENTAL PROTECTION
AGENCY
[Docket# EPA–RO4–SFUND–2007–1052;
FRL–8487–9]
B&B Manufacturing Superfund Site;
Mobile, Mobile County, AL; Notice of
Settlements
Environmental Protection
Agency (EPA).
ACTION: Notice of settlements.
AGENCY:
SUMMARY: Under Section 122(h) of the
Comprehensive Environmental
Response, Compensation and Liability
Act (CERCLA), the United States
Environmental Protection Agency has
entered into three separate settlements
for reimbursement of past response
costs concerning the B&B
Manufacturing Superfund Site located
in Mobile, Mobile County, Alabama.
DATES: The Agency will consider public
comments on the settlements until
November 26, 2007. The Agency will
consider all comments received and
may modify or withdraw its consent to
the settlements if comments received
disclose facts or considerations which
indicate that the settlements are
inappropriate, improper, or inadequate.
ADDRESSES: Copies of the settlements
are available from Ms. Paula V.
Batchelor. Submit your comments,
identified by Docket ID No. EPA–RO4–
SFUND–2007–1052 or Site name B&B
Manufacturing Superfund Site by one of
the following methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• E-mail: Batchelor.Paula@epa.gov.
• Fax: 404/562–8842/Attn: Paula V.
Batchelor.
Mail: Ms. Paula V. Batchelor, U.S.
EPA Region 4, SD–SEIMB, 61 Forsyth
Street, SW., Atlanta, Georgia 30303. ‘‘In
addition, please mail a copy of your
comments on the information collection
provisions to the Office of Information
and Regulatory Affairs, Office of
Management and Budget (OMB), Attn:
Desk Officer for EPA, 725 17th St., NW.,
Washington, DC 20503.
Instructions: Direct your comments to
Docket ID No. EPA–RO4–SFUND–2007–
1052. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
E:\FR\FM\26OCN1.SGM
26OCN1
Agencies
[Federal Register Volume 72, Number 207 (Friday, October 26, 2007)]
[Notices]
[Pages 60846-60847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-21102]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6692-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/15/2007 through 10/19/2007.
Pursuant to 40 CFR 1506.9.
EIS No. 20070435, Draft EIS, BLM, UT, Richfield Field Office Resource
Management Plan, Implementation, Future Management of the Public Lands
and Resource, Glen Canyon National Recreation Area, Capitol Reef and
Canyonlands National Parks, Sanpete, Sevier, Piute, Wayne and Garfield
Counties, UT. Comment Period Ends: 01/24/2008. Contact: Wayne Wetzel,
435-896-1500.
EIS No. 20070436, Draft EIS, FHW, ME, Wiscasset Route 1 Corridor Study
Project, To Relieve Traffic Congestion and Improve Safety, U.S. Army
COE section 404 Permit, Wiscasset and Edgecomb Counties, ME. Comment
Period Ends: 12/21/2007. Contact: Mark Asselmann, 207622-8350.
EIS No. 20070437, Draft EIS, NPS, HI, PROGRAMMATIC EIS--Ala Kahakai
National Historic Trail Comprehensive Management Plan, To Provide Long-
Term Direction for Natural and Cultural Resource, Island of Hawii, HI.
Comment Period Ends: 12/26/2007. Contact: Aric Arakaki 808-326-6012.
EIS No. 20070438, Final Supplement, NOA, NC, Atlantic Sea Scallop
Fishery Management Plan (FMP), Amendment 11, Implementation to Control
Capacity and Mortality in the General Category Scallop Fishery, Gulf of
Maine, Georges Bank, NC. Wait Period Ends: 11/26/2007. Contact:
Patricia A. Kurkal, 978-281-9250.
EIS No. 20070439, Draft EIS, BOP, AL, Aliceville, Alabama Area,
Proposed
[[Page 60847]]
Federal Correctional Complex, To Address the Growing Federal Inmate
Population, Pickens County, AL. Comment Period Ends: 12/10/2007.
Contact: Pamela J. Candler, 202-514-6470.
EIS No. 20070440, Draft EIS, FHW, UT, Mountain View Corridor (MVC)
Project, Proposed Transportation Improvement 2030 Travel Demand in
Western Salt Lake County south of I-80 and west of Bangerter Highway
and in northwestern Utah County of I-15, south of the Salt Lake County
Line, and north of Utah Lake, Salt Lake and Utah County, UT. Comment
Period Ends: 12/24/2007. Contact: Edward Woolford, P.E. 801-963-0182.
EIS No. 20070441, Draft Supplement, IBR, CA, PROGRAMMATIC--
Environmental Water Account (EWA) Project, Updated Information to
Provide an Evaluation of 2004 Final EIS/EIR Environmental Water Account
(EWA) and Effects Associated with Extending the Current EWA's through
2011, CALFED Bay-Delta Programs, Endangered Species Act section 7 and
U.S. Army COE Section 10 Permit, CA. Comment Period Ends: 12/10/2007.
Contact: Ms. Sammie Cervantes, 916-978-5104.
EIS No. 20070442, Final EIS, FHW, CA, Interstate 5/Cosumnes River
Boulevard Interchange Project, Extension of Cosumnes River Boulevard
from Franklin Boulevard to Freeport Boulevard with an Interchange at
Interstate 5, South of the Pocket/Meadowview Road Interchange and North
of the Laguna Boulevard Interchange, City of Sacramento, Sacramento
County, CA. Wait Period Ends: 11/26/2007. Contact: Cesar E. Perez, 916-
498-5065.
EIS No. 20070443, Draft Supplement, FTA, CA, Third Street Light Rail
Phase 2, Updated Information on the Central Subway Project Area,
Funding, San Francisco Municipal Transportation Agency, in the City and
County San Francisco, CA. Comment Period Ends: 12/10/2007. Contact: Ray
Sukys, 415-744-3133.
EIS No. 20070444, Final EIS, USA, GA, Fort Benning U.S. Army Infantry
Center, Base Realignment and Closure (BRAC) 2005 and Transformation
Actions, Implementation, Chattahoochee and Muscogee Counties, GA. Wait
Period Ends: 11/26/2007. Contact: John Brent, 706-545-2180.
EIS No. 20070445, Draft EIS, USN, 00, Shock Trail of the MESA VERDE
(LPD 19), San Antonio (LPD 17) Class Ship designated as the Shock Ship
for Proposed Shock Trail, Possible Offshore Locations are Naval Station
Norfolk, VA; Naval Station Mayport, FL; and Naval Air Station
Pensacola, FL. Comment Period Ends: 12/10/2007. Contact: Donald Shaver,
703-412-7521.
EIS No. 20070446, Final EIS, FHW, IN, I-69 Evansville to Indianapolis
Project, I-69 Tier 2 Section 1: Evansville to Oakland City, from 1-64
to IN-64, Preferred Alternative is 4, Gibson and Warrick Counties, IN.
Wait Period Ends: 11/26/2007. Contact: Anthony DeSimone, 317-226-5307.
EIS No. 20070447, Draft EIS, FHW, CA, Marin-Sonoma Narrows (MSN) HOV
Widening Project, Propose to Relieve Recurrent Congestion along U.S.
101 south of the Route 37 Interchange in the City of Novato (Marin
County) and ends north of the Corona Road Overcrossing in the City of
Petaluma (Sonoma County), Marin and Sonoma Counties, CA. Comment Period
Ends: 12/14/2007. Contact: Cesar E. Perez, 916-498-5065.
EIS No. 20070448, Final EIS, USA, 00, PROGRAMMATIC--Army Growth and
Force Structure Realignment, Implementation, Nationwide. Wait Period
Ends: 11/26/2007. Contact: Mike Ackerman, 410-436-2522.
EIS No. 20070449, Final EIS, BLM, ID, Smoky Canyon Mine Panels F & G,
Proposed Mine Expansion, Caribou County, ID. Wait Period Ends: 11/26/
2007. Contact: Bill Stout 208-478-6367.
EIS No. 20070450, Draft Supplement, WPA, 00, Big Stone II Power Plant
and Transmission Project, Addresses the Impacts of Changes to the
Proposed Action relative to Cooling Alternatives and the Use of
Groundwater as Backup Water Source, U.S. Army COE Section 10 and 404
Permits, Grant County, SD and Big Stone County, MN. Comment Period
Ends: 12/10/2007. Contact: Nancy Werdel, 720-962-7251.
EIS No. 20070451, Draft EIS, AFS, UT, Indian Springs Road Realignment,
Reducing Adverse Impacts to Watershed and Fisheries, U.S. Army COE
Section 404 Permit, Uinta National Forest, Heber Ranger District,
Wasatch County, UT. Comment Period Ends: 12/10/2007. Contact: Jim
Percy, 435-654-0470.
Dated: October 23, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-21102 Filed 10-25-07; 8:45 am]
BILLING CODE 6560-50-P