Notice of Filings, 60340-60341 [E7-20903]
Download as PDF
yshivers on PROD1PC62 with NOTICES
60340
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Notices
Applicants: National Grid USA.
Description: Amendment to and
Notice of Partial Withdrawal of
Application for Authorization to Issue
Securities Under Section 204 of the
Federal Power Act, and Motion for
Waiver of 15–Day Waiting Period Under
Commission Rule 216 of National Grid
USA.
Filed Date: 10/15/2007.
Accession Number: 20071015–5140.
Comment Date: 5 p.m. Eastern Time
on Monday, November 5, 2007.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–90–001.
Applicants: MidAmerican Energy
Company.
Description: Mid American Energy’s
substitute tariff sheet to reflect the
correct methodology for calculation of
transmission reserve margin in its Open
Access Transmission Tariff—
Attachment C filed September 11, 2007.
Filed Date: 10/16/2007.
Accession Number: 20071016–5040.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 6, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
VerDate Aug<31>2005
15:33 Oct 23, 2007
Jkt 214001
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Acting Deputy Secretary.
[FR Doc. E7–20902 Filed 10–23–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filings
October 18, 2007.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG08–8–000.
Applicants: Plum Point Energy
Associates, L.L.C.
Description: Notice of Self
Certification of Exempt Wholesale
Generator Status of Plum Point Energy
Associates, L.L.C.
Filed Date: 10/17/2007.
Accession Number: 20071017–5029.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 07, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER03–534–003.
Applicants: Ingenco Wholesale
Power, L.L.C.
Description: Notice of Change in
Status of Ingenco Wholesale Power,
L.L.C.
Filed Date: 10/17/2007.
Accession Number: 20071017–5014.
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 07, 2007.
Docket Numbers: ER07–1318–001.
Applicants: Wellsboro Electric
Company.
Description: Wellsboro Electric Co
submits a Supplement to the Petition for
Acceptance of Initial Tariff, Waivers and
Blanket Authority.
Filed Date: 10/17/2007.
Accession Number: 20071018–0077.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Comment Date: 5 p.m. Eastern Time
on Wednesday, November 07, 2007.
Docket Numbers: ER08–38–001.
Applicants: Northern Renewable
Energy (USA) Ltd.
Description: Northern Renewable
Energy (USA) Ltd submits Appendix A
to its 10/10/07 submittal of an
application.
Filed Date: 10/16/2007.
Accession Number: 20071018–0084.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 23, 2007.
Docket Numbers: ER08–40–001.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection LLC
requests that the language in footnote 2
of the 10/11/07 transmittal letter be
replaced.
Filed Date: 10/16/2007.
Accession Number: 20071018–0098.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 06, 2007.
Docket Numbers: ER08–62–000.
Applicants: Peetz Table Wind Energy,
LLC.
Description: Peetz Table Wind Energy,
LLC submits a Jurisdictional Agreement
with Logan Wind Energy, LLC.
Filed Date: 10/16/2007.
Accession Number: 20071018–0086.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 06, 2007.
Docket Numbers: ER08–63–000.
Applicants: Lincoln Generating
Facility, LLC.
Description: Lincoln Generating
Facility, LLC submits a tariff pursuant to
which it will provide up to 320 MW of
black start capacity in the
Commonwealth Edison Co.
Filed Date: 10/16/2007.
Accession Number: 20071018–0087.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 06, 2007.
Docket Numbers: ER08–64–000.
Applicants: California Independent
System Operator C.
Description: California Independent
System Operator submits proposed
amendment to the currently-effective
ISO Tariff.
Filed Date: 10/16/2007.
Accession Number: 20071018–0085.
Comment Date: 5 p.m. Eastern Time
on Tuesday, November 06, 2007.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES07–26–004.
Applicants: Entergy Gulf States, Inc.
Description: Entergy Gulf States Inc et
al. submits additional information with
respect to their request for relief under
FPA.
Filed Date: 10/16/2007.
Accession Number: 20071018–0088.
E:\FR\FM\24OCN1.SGM
24OCN1
yshivers on PROD1PC62 with NOTICES
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Notices
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 23, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis,
Acting Deputy Secretary.
[FR Doc. E7–20903 Filed 10–23–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
15:33 Oct 23, 2007
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF07–15–000]
Algonquin Gas Transmission, LLC;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed East to West Hubline
Expansion Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Meetings
October 16, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will identify and address the
environmental impacts that could result
from the construction and operation of
the East to West HubLine Expansion
Project (E2W Project or Project). The
E2W Project is proposed by Algonquin
Gas Transmission, LLC (Algonquin),
which is an indirect wholly owned
subsidiary of Spectra Energy Corp. The
Commission will use the EIS in its
decision-making process to determine
whether or not to authorize the Project.
This notice describes the proposed
Project facilities and explains the
scoping process that will be used to
gather input from the public and
interested agencies on the Project. Your
input will help determine the issues
that need to be evaluated in the EIS.
Please note that the scoping period for
the Project will close on November 21,
2007.
Comments on the Project may be
submitted in written form or verbally. In
lieu of or in addition to sending written
comments, you are invited to attend the
public scoping meetings that have been
scheduled in the Project area. These
meetings are scheduled for November 5,
2007 in Randolph, Massachusetts;
November 7, 2007 in North Andover,
Massachusetts; and November 8, 2007
in Norwich, Connecticut. Further
instructions on how to submit
comments and additional details of the
public scoping meetings are provided in
the Public Participation section of this
notice.
The FERC will be the lead federal
agency for the preparation of the EIS
and will prepare the document to satisfy
the requirements of the National
Environmental Policy Act (NEPA). The
document will be used by the FERC to
consider the environmental impacts that
could result if it authorizes Algonquin’s
Project by issuing a Certificate of Public
Convenience and Necessity under
section 7 of the Natural Gas Act. It is the
FERC’s goal that other federal agencies
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
60341
will participate in the environmental
review process as cooperating agencies
to satisfy their respective NEPA
responsibilities.
The Project must also undergo an
environmental review pursuant to the
Massachusetts Environmental Policy
Act (MEPA). The Massachusetts
Executive Office of Energy and
Environmental Affairs (MEEA) is the
lead state agency with responsibility for
ensuring compliance with the MEPA
regulations for interstate natural gas
pipeline projects. The MEPA regulations
allow use of a Special Review Procedure
that would establish a coordinated
review of the Project by the FERC and
the MEEA. Establishment of a
coordinated review would enable the
NEPA EIS (plus an addendum
document) to serve as the
Environmental Impact Report (EIR)
required by MEPA. It is anticipated that
the FERC and the MEEA will conduct a
coordinated NEPA/MEPA review of the
E2W Project to the maximum extent
feasible.
The Massachusetts Energy Facility
Siting Board (MEFSB) is an independent
board that licenses major energy
facilities in Massachusetts and is
charged with ensuring a reliable energy
supply for the Commonwealth with a
minimum impact on the environment at
the lowest possible cost. The MEFSB
has no authority over the siting of
interstate natural gas facilities; however,
it represents the citizens of
Massachusetts before the FERC on cases
involving the construction of applicable
energy infrastructure in Massachusetts.
The two Massachusetts public scoping
meetings announced in this notice will
be joint scoping meetings with
participation by the MEFSB.
The Connecticut Siting Council (CSC)
is an independent board that licenses
major energy facilities in Connecticut.
The CSC regulates facility siting to
balance the need for adequate and
reliable public services at the lowest
reasonable cost to consumers with the
need to protect the environment and
ecology of the state. Similar to the
MEFSB, the CSC has no authority over
the siting of interstate natural gas
facilities; however, it may become a
party before the FERC on cases
involving the construction of applicable
energy infrastructure in Connecticut.
The CSC will participate in the FERC’s
Connecticut scoping meeting and will
announce independent hearings at a
later date.
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 72, Number 205 (Wednesday, October 24, 2007)]
[Notices]
[Pages 60340-60341]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-20903]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Filings
October 18, 2007.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG08-8-000.
Applicants: Plum Point Energy Associates, L.L.C.
Description: Notice of Self Certification of Exempt Wholesale
Generator Status of Plum Point Energy Associates, L.L.C.
Filed Date: 10/17/2007.
Accession Number: 20071017-5029.
Comment Date: 5 p.m. Eastern Time on Wednesday, November 07, 2007.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER03-534-003.
Applicants: Ingenco Wholesale Power, L.L.C.
Description: Notice of Change in Status of Ingenco Wholesale Power,
L.L.C.
Filed Date: 10/17/2007.
Accession Number: 20071017-5014.
Comment Date: 5 p.m. Eastern Time on Wednesday, November 07, 2007.
Docket Numbers: ER07-1318-001.
Applicants: Wellsboro Electric Company.
Description: Wellsboro Electric Co submits a Supplement to the
Petition for Acceptance of Initial Tariff, Waivers and Blanket
Authority.
Filed Date: 10/17/2007.
Accession Number: 20071018-0077.
Comment Date: 5 p.m. Eastern Time on Wednesday, November 07, 2007.
Docket Numbers: ER08-38-001.
Applicants: Northern Renewable Energy (USA) Ltd.
Description: Northern Renewable Energy (USA) Ltd submits Appendix A
to its 10/10/07 submittal of an application.
Filed Date: 10/16/2007.
Accession Number: 20071018-0084.
Comment Date: 5 p.m. Eastern Time on Tuesday, October 23, 2007.
Docket Numbers: ER08-40-001.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection LLC requests that the language in
footnote 2 of the 10/11/07 transmittal letter be replaced.
Filed Date: 10/16/2007.
Accession Number: 20071018-0098.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 06, 2007.
Docket Numbers: ER08-62-000.
Applicants: Peetz Table Wind Energy, LLC.
Description: Peetz Table Wind Energy, LLC submits a Jurisdictional
Agreement with Logan Wind Energy, LLC.
Filed Date: 10/16/2007.
Accession Number: 20071018-0086.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 06, 2007.
Docket Numbers: ER08-63-000.
Applicants: Lincoln Generating Facility, LLC.
Description: Lincoln Generating Facility, LLC submits a tariff
pursuant to which it will provide up to 320 MW of black start capacity
in the Commonwealth Edison Co.
Filed Date: 10/16/2007.
Accession Number: 20071018-0087.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 06, 2007.
Docket Numbers: ER08-64-000.
Applicants: California Independent System Operator C.
Description: California Independent System Operator submits
proposed amendment to the currently-effective ISO Tariff.
Filed Date: 10/16/2007.
Accession Number: 20071018-0085.
Comment Date: 5 p.m. Eastern Time on Tuesday, November 06, 2007.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES07-26-004.
Applicants: Entergy Gulf States, Inc.
Description: Entergy Gulf States Inc et al. submits additional
information with respect to their request for relief under FPA.
Filed Date: 10/16/2007.
Accession Number: 20071018-0088.
[[Page 60341]]
Comment Date: 5 p.m. Eastern Time on Tuesday, October 23, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC.
There is an eSubscription link on the Web site that enables
subscribers to receive e-mail notification when a document is added to
a subscribed dockets(s). For assistance with any FERC Online service,
please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Nathaniel J. Davis,
Acting Deputy Secretary.
[FR Doc. E7-20903 Filed 10-23-07; 8:45 am]
BILLING CODE 6717-01-P