Sunshine Act Meeting Notice, 58840-58841 [E7-20392]
Download as PDF
58840
Federal Register / Vol. 72, No. 200 / Wednesday, October 17, 2007 / Notices
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
Room 2C, 888 First Street, NE.,
Washington, DC 20426.
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PLACE:
Nathaniel J. Davis, Sr.,
Acting Deputy Secretary.
[FR Doc. E7–20391 Filed 10–16–07; 8:45 am]
STATUS:
BILLING CODE 6717–01–P
Open.
Agenda. *
Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
October 11, 2007.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: October 18, 2007, 10
a.m.
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
923RD—MEETING REGULAR MEETING
[October 18, 2007, 10 a.m.]
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ................................................
AD02–7–000 ................................................
AD06–3–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
ELECTRIC
E–1 ........
EL00–95–164 ..............................................
E–2 ........
E–3 ........
RR07–16–000 .............................................
EC07–39–000, EC07–39–001, EC07–39–
002.
EC07–45–000, EC07–45–001, EC07–45–
002.
EC07–99–000 ..............................................
EL07–75–000 ..............................................
EC06–166–000, EC06–166–001 ................
ER07–478–001, ER07–478–003 ................
ER07–478–002 ............................................
RR06–1–010 ...............................................
OMITTED.
ER07–1186–000 ..........................................
ER07–1251–000, ER07–1251–001 ............
ER07–1245–000 ..........................................
RC07–1–000 ...............................................
RC07–2–000 ...............................................
ER07–995–000, ER07–995–001 ................
ER07–546–002 ............................................
ER07–546–003, ER07–547–001 ................
EL07–31–000 ..............................................
OMITTED.
ER07–805–001, ER07–805–002, ER07–
1304–000.
ER97–4166–024, ER96–780–017, EL04–
124–005.
ER07–748–001 ............................................
ER07–541–002 ............................................
ER05–231–005, ER05–231–006 ................
ER05–163–005, ER05–163–006 ................
EL05–76–002 ..............................................
ER07–525–002 ............................................
ER06–1218–005 ..........................................
E–4 ........
E–5 ........
E–6 ........
E–7 ........
E–8 ........
E–9 ........
E–10 ......
E–11 ......
E–12 ......
E–13 ......
E–14 ......
E–15 ......
E–16 ......
E–17 ......
E–18 ......
E–19 ......
sroberts on PROD1PC70 with NOTICES
E–20 ......
E–21
E–22
E–23
E–24
E–25
E–26
E–27
......
......
......
......
......
......
......
VerDate Aug<31>2005
19:05 Oct 16, 2007
Jkt 214001
PO 00000
San Diego Gas & Electric Company (Bonneville Power Administration v. Federal Energy Regulatory Commission).
North American Electric Reliability Corporation.
The Goldman Sachs Group, Inc.
Morgan Stanley.
Great Plains Energy Incorporated.
Kansas City Power & Light Company Aquila, Inc., Black Hills Corporation.
Legg Mason, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
North American Electric Reliability Corporation.
PJM Interconnection, L.L.C.
Northern Maine Independent System Administrator, Inc.
ISO New England Inc. and New England Power Pool.
Mosaic Fertilizer, LLC.
City of Tampa, Florida.
New York Independent System Operator, Inc.
ISO New England Inc.
New England Power Pool.
DTE Pontiac North LLC.
California Independent System Operator Corporation.
Southern Company Energy Marketing, L.P. and Southern Company Services, Inc.
New York Independent System Operator, Inc.
Entergy Services, Inc.
PSEG Power Connecticut, LLC.
Milford Power Company, LLC.
The United Illuminating Company v. Dominion Energy Marketing, Inc.
Entergy Services, Inc.
PJM Interconnection, L.L.C.
Frm 00037
Fmt 4703
Sfmt 4703
E:\FR\FM\17OCN1.SGM
17OCN1
Federal Register / Vol. 72, No. 200 / Wednesday, October 17, 2007 / Notices
58841
923RD—MEETING REGULAR MEETING—Continued
[October 18, 2007, 10 a.m.]
Item No.
E–28 ......
Docket No.
Company
OMITTED.
MISCELLANEOUS
M–1 ........
OMITTED.
GAS
G–1 ........
G–2 ........
G–3 ........
G–4 ........
G–5 ........
OMITTED.
RP07–500–000, RP07–500–001, RP07–
500–002.
RP07–509–000, RP07–509–001, RP07–
509–002.
RP07–179–002, RP07–179–001 ................
RP07–473–000 ............................................
Columbia Gulf Transmission Company.
Columbia Gas Transmission Corporation.
Gulf South Pipeline Company, LP.
National Energy and Trade LP v. Texas Gas Transmission LLC and Gulf South Pipeline LP.
HYDRO
H–1
H–2
H–3
H–4
H–5
H–6
........
........
........
........
........
........
P–11437–022 ..............................................
P–12484–002 ..............................................
P–9401–066 ................................................
P–12911–001, P–12911–002 ......................
P–1494–300 ................................................
P–233–105 ..................................................
Hydro Matrix Limited Partnership.
Metro Hydroelectric Company, LLC.
Mt. Hope Waterpower Project, L.L.P.
Electric Plant Board of the City of Paducah, Kentucky
Grand River Dam Authority.
Pacific Gas and Electric Company.
CERTIFICATES
C–1 ........
C–2 ........
C–3 ........
C–4 ........
C–5 ........
OMITTED.
CP07–88–000 ..............................................
CP05–357–006 ............................................
CP07–426–000 ............................................
CP07–395–000 ............................................
RM07–17–000 .............................................
Egan Hub Storage, LLC.
Cheniere Creole Trail Pipeline, L.P.
Cheniere Sabine Pass Pipeline, L.P.
Wyoming Interstate Company, Ltd.
Revisions to Landowner Notification and Blanket Certificate Regulations.
sroberts on PROD1PC70 with NOTICES
Kimberly D. Bose,
Secretary.
not be telecast through the Capitol
Connection service.
A free Web cast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar of
Events and locating this event in the
Calendar. The event will contain a link
to its Web cast. The Capitol Connection
provides technical support for the free
Web casts. It also offers access to this
event via television in the DC area and
via phone bridge for a fee. If you have
any questions, visit https://
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
[FR Doc. E7–20392 Filed 10–16–07; 8:45 am]
VerDate Aug<31>2005
19:05 Oct 16, 2007
Jkt 214001
BILLING CODE 6717–01–P
Rick
Westlund (202) 566–1682, or e-mail at
westlund.rick@epa.gov and please refer
to the appropriate EPA Information
Collection Request (ICR) Number.
SUPPLEMENTARY INFORMATION:
FOR FURTHER INFORMATION CONTACT:
ENVIRONMENTAL PROTECTION
AGENCY
OMB Responses to Agency Clearance
Requests
[FRL–8483–5]
OMB Approvals
Agency Information Collection
Activities OMB Responses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This document announces the
Office of Management and Budget’s
(OMB) responses to Agency Clearance
requests, in compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et. seq). An agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations are listed in 40 CFR part 9
and 48 CFR chapter 15.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
EPA ICR Number 1713.06; Federal
Operating Permit Regulations
(Renewal); in 40 CFR part 71; was
approved 09/12/2007; OMB Number
2060–0336; expires 09/30/2010.
EPA ICR Number 1587.07; State
Operating Permit Regulations
(Renewal); in 40 CFR part 70; was
approved 09/12/2007; OMB Number
2060–0243; expires 09/30/2010. EPA
ICR Number 1967.03; NESHAP for
Stationary Combustion Turbines
(Renewal); in 40 CFR part 63, subpart
YYYY; was approved 09/19/2007; OMB
Number 2060–0540; expires 09/30/2010.
EPA ICR Number 2243.04; Procedures
for Implementing the National
Environmental Policy Act (NEPA) and
Assessing Environmental Effects Abroad
of EPA Actions (Final Rule); was
E:\FR\FM\17OCN1.SGM
17OCN1
Agencies
[Federal Register Volume 72, Number 200 (Wednesday, October 17, 2007)]
[Notices]
[Pages 58840-58841]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-20392]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
October 11, 2007.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date And Time: October 18, 2007, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda. * Note--Items listed on the agenda
may be deleted without further notice.
Contact Person For More Information: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
923rd--Meeting Regular Meeting
[October 18, 2007, 10 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1..................... AD02-1-000...................... Agency Administrative Matters.
A-2..................... AD02-7-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD06-3-000...................... Energy Market Update.
----------------------------------------------------------------------------------------------------------------
ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1..................... EL00-95-164..................... San Diego Gas & Electric Company (Bonneville Power
Administration v. Federal Energy Regulatory
Commission).
E-2..................... RR07-16-000..................... North American Electric Reliability Corporation.
E-3..................... EC07-39-000, EC07-39-001, EC07- The Goldman Sachs Group, Inc.
39-002.
E-4..................... EC07-45-000, EC07-45-001, EC07- Morgan Stanley.
45-002.
E-5..................... EC07-99-000..................... Great Plains Energy Incorporated.
EL07-75-000..................... Kansas City Power & Light Company Aquila, Inc.,
Black Hills Corporation.
E-6..................... EC06-166-000, EC06-166-001...... Legg Mason, Inc.
E-7..................... ER07-478-001, ER07-478-003...... Midwest Independent Transmission System Operator,
Inc.
E-8..................... ER07-478-002.................... Midwest Independent Transmission System Operator,
Inc.
E-9..................... RR06-1-010...................... North American Electric Reliability Corporation.
E-10.................... OMITTED.........................
E-11.................... ER07-1186-000................... PJM Interconnection, L.L.C.
E-12.................... ER07-1251-000, ER07-1251-001.... Northern Maine Independent System Administrator,
Inc.
E-13.................... ER07-1245-000................... ISO New England Inc. and New England Power Pool.
E-14.................... RC07-1-000...................... Mosaic Fertilizer, LLC.
RC07-2-000...................... City of Tampa, Florida.
E-15.................... ER07-995-000, ER07-995-001...... New York Independent System Operator, Inc.
E-16.................... ER07-546-002.................... ISO New England Inc.
ER07-546-003, ER07-547-001...... New England Power Pool.
E-17.................... EL07-31-000..................... DTE Pontiac North LLC.
E-18.................... OMITTED.........................
E-19.................... ER07-805-001, ER07-805-002, ER07- California Independent System Operator Corporation.
1304-000.
E-20.................... ER97-4166-024, ER96-780-017, Southern Company Energy Marketing, L.P. and Southern
EL04-124-005. Company Services, Inc.
E-21.................... ER07-748-001.................... New York Independent System Operator, Inc.
E-22.................... ER07-541-002.................... Entergy Services, Inc.
E-23.................... ER05-231-005, ER05-231-006...... PSEG Power Connecticut, LLC.
E-24.................... ER05-163-005, ER05-163-006...... Milford Power Company, LLC.
E-25.................... EL05-76-002..................... The United Illuminating Company v. Dominion Energy
Marketing, Inc.
E-26.................... ER07-525-002.................... Entergy Services, Inc.
E-27.................... ER06-1218-005................... PJM Interconnection, L.L.C.
[[Page 58841]]
E-28.................... OMITTED.........................
----------------------------------------------------------------------------------------------------------------
MISCELLANEOUS
----------------------------------------------------------------------------------------------------------------
M-1..................... OMITTED.........................
----------------------------------------------------------------------------------------------------------------
GAS
----------------------------------------------------------------------------------------------------------------
G-1..................... OMITTED.........................
G-2..................... RP07-500-000, RP07-500-001, RP07- Columbia Gulf Transmission Company.
500-002.
G-3..................... RP07-509-000, RP07-509-001, RP07- Columbia Gas Transmission Corporation.
509-002.
G-4..................... RP07-179-002, RP07-179-001...... Gulf South Pipeline Company, LP.
G-5..................... RP07-473-000.................... National Energy and Trade LP v. Texas Gas
Transmission LLC and Gulf South Pipeline LP.
----------------------------------------------------------------------------------------------------------------
HYDRO
----------------------------------------------------------------------------------------------------------------
H-1..................... P-11437-022..................... Hydro Matrix Limited Partnership.
H-2..................... P-12484-002..................... Metro Hydroelectric Company, LLC.
H-3..................... P-9401-066...................... Mt. Hope Waterpower Project, L.L.P.
H-4..................... P-12911-001, P-12911-002........ Electric Plant Board of the City of Paducah,
Kentucky
H-5..................... P-1494-300...................... Grand River Dam Authority.
H-6..................... P-233-105....................... Pacific Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1..................... OMITTED.........................
C-2..................... CP07-88-000..................... Egan Hub Storage, LLC.
C-3..................... CP05-357-006.................... Cheniere Creole Trail Pipeline, L.P.
CP07-426-000.................... Cheniere Sabine Pass Pipeline, L.P.
C-4..................... CP07-395-000.................... Wyoming Interstate Company, Ltd.
C-5..................... RM07-17-000..................... Revisions to Landowner Notification and Blanket
Certificate Regulations.
----------------------------------------------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free Web cast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to www.ferc.gov's Calendar of Events and
locating this event in the Calendar. The event will contain a link to
its Web cast. The Capitol Connection provides technical support for the
free Web casts. It also offers access to this event via television in
the DC area and via phone bridge for a fee. If you have any questions,
visit https://www.CapitolConnection.org or contact Danelle Springer or
David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. E7-20392 Filed 10-16-07; 8:45 am]
BILLING CODE 6717-01-P