Sunshine Act Meeting Notice, 58840-58841 [E7-20392]

Download as PDF 58840 Federal Register / Vol. 72, No. 200 / Wednesday, October 17, 2007 / Notices of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call Room 2C, 888 First Street, NE., Washington, DC 20426. (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PLACE: Nathaniel J. Davis, Sr., Acting Deputy Secretary. [FR Doc. E7–20391 Filed 10–16–07; 8:45 am] STATUS: BILLING CODE 6717–01–P Open. Agenda. * Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: CONTACT PERSON FOR MORE INFORMATION: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice October 11, 2007. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: October 18, 2007, 10 a.m. Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 923RD—MEETING REGULAR MEETING [October 18, 2007, 10 a.m.] Item No. Docket No. Company ADMINISTRATIVE A–1 ........ A–2 ........ A–3 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ AD06–3–000 ................................................ Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. ELECTRIC E–1 ........ EL00–95–164 .............................................. E–2 ........ E–3 ........ RR07–16–000 ............................................. EC07–39–000, EC07–39–001, EC07–39– 002. EC07–45–000, EC07–45–001, EC07–45– 002. EC07–99–000 .............................................. EL07–75–000 .............................................. EC06–166–000, EC06–166–001 ................ ER07–478–001, ER07–478–003 ................ ER07–478–002 ............................................ RR06–1–010 ............................................... OMITTED. ER07–1186–000 .......................................... ER07–1251–000, ER07–1251–001 ............ ER07–1245–000 .......................................... RC07–1–000 ............................................... RC07–2–000 ............................................... ER07–995–000, ER07–995–001 ................ ER07–546–002 ............................................ ER07–546–003, ER07–547–001 ................ EL07–31–000 .............................................. OMITTED. ER07–805–001, ER07–805–002, ER07– 1304–000. ER97–4166–024, ER96–780–017, EL04– 124–005. ER07–748–001 ............................................ ER07–541–002 ............................................ ER05–231–005, ER05–231–006 ................ ER05–163–005, ER05–163–006 ................ EL05–76–002 .............................................. ER07–525–002 ............................................ ER06–1218–005 .......................................... E–4 ........ E–5 ........ E–6 ........ E–7 ........ E–8 ........ E–9 ........ E–10 ...... E–11 ...... E–12 ...... E–13 ...... E–14 ...... E–15 ...... E–16 ...... E–17 ...... E–18 ...... E–19 ...... sroberts on PROD1PC70 with NOTICES E–20 ...... E–21 E–22 E–23 E–24 E–25 E–26 E–27 ...... ...... ...... ...... ...... ...... ...... VerDate Aug<31>2005 19:05 Oct 16, 2007 Jkt 214001 PO 00000 San Diego Gas & Electric Company (Bonneville Power Administration v. Federal Energy Regulatory Commission). North American Electric Reliability Corporation. The Goldman Sachs Group, Inc. Morgan Stanley. Great Plains Energy Incorporated. Kansas City Power & Light Company Aquila, Inc., Black Hills Corporation. Legg Mason, Inc. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. North American Electric Reliability Corporation. PJM Interconnection, L.L.C. Northern Maine Independent System Administrator, Inc. ISO New England Inc. and New England Power Pool. Mosaic Fertilizer, LLC. City of Tampa, Florida. New York Independent System Operator, Inc. ISO New England Inc. New England Power Pool. DTE Pontiac North LLC. California Independent System Operator Corporation. Southern Company Energy Marketing, L.P. and Southern Company Services, Inc. New York Independent System Operator, Inc. Entergy Services, Inc. PSEG Power Connecticut, LLC. Milford Power Company, LLC. The United Illuminating Company v. Dominion Energy Marketing, Inc. Entergy Services, Inc. PJM Interconnection, L.L.C. Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\17OCN1.SGM 17OCN1 Federal Register / Vol. 72, No. 200 / Wednesday, October 17, 2007 / Notices 58841 923RD—MEETING REGULAR MEETING—Continued [October 18, 2007, 10 a.m.] Item No. E–28 ...... Docket No. Company OMITTED. MISCELLANEOUS M–1 ........ OMITTED. GAS G–1 ........ G–2 ........ G–3 ........ G–4 ........ G–5 ........ OMITTED. RP07–500–000, RP07–500–001, RP07– 500–002. RP07–509–000, RP07–509–001, RP07– 509–002. RP07–179–002, RP07–179–001 ................ RP07–473–000 ............................................ Columbia Gulf Transmission Company. Columbia Gas Transmission Corporation. Gulf South Pipeline Company, LP. National Energy and Trade LP v. Texas Gas Transmission LLC and Gulf South Pipeline LP. HYDRO H–1 H–2 H–3 H–4 H–5 H–6 ........ ........ ........ ........ ........ ........ P–11437–022 .............................................. P–12484–002 .............................................. P–9401–066 ................................................ P–12911–001, P–12911–002 ...................... P–1494–300 ................................................ P–233–105 .................................................. Hydro Matrix Limited Partnership. Metro Hydroelectric Company, LLC. Mt. Hope Waterpower Project, L.L.P. Electric Plant Board of the City of Paducah, Kentucky Grand River Dam Authority. Pacific Gas and Electric Company. CERTIFICATES C–1 ........ C–2 ........ C–3 ........ C–4 ........ C–5 ........ OMITTED. CP07–88–000 .............................................. CP05–357–006 ............................................ CP07–426–000 ............................................ CP07–395–000 ............................................ RM07–17–000 ............................................. Egan Hub Storage, LLC. Cheniere Creole Trail Pipeline, L.P. Cheniere Sabine Pass Pipeline, L.P. Wyoming Interstate Company, Ltd. Revisions to Landowner Notification and Blanket Certificate Regulations. sroberts on PROD1PC70 with NOTICES Kimberly D. Bose, Secretary. not be telecast through the Capitol Connection service. A free Web cast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https:// www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will [FR Doc. E7–20392 Filed 10–16–07; 8:45 am] VerDate Aug<31>2005 19:05 Oct 16, 2007 Jkt 214001 BILLING CODE 6717–01–P Rick Westlund (202) 566–1682, or e-mail at westlund.rick@epa.gov and please refer to the appropriate EPA Information Collection Request (ICR) Number. SUPPLEMENTARY INFORMATION: FOR FURTHER INFORMATION CONTACT: ENVIRONMENTAL PROTECTION AGENCY OMB Responses to Agency Clearance Requests [FRL–8483–5] OMB Approvals Agency Information Collection Activities OMB Responses Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: This document announces the Office of Management and Budget’s (OMB) responses to Agency Clearance requests, in compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et. seq). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA’s regulations are listed in 40 CFR part 9 and 48 CFR chapter 15. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 EPA ICR Number 1713.06; Federal Operating Permit Regulations (Renewal); in 40 CFR part 71; was approved 09/12/2007; OMB Number 2060–0336; expires 09/30/2010. EPA ICR Number 1587.07; State Operating Permit Regulations (Renewal); in 40 CFR part 70; was approved 09/12/2007; OMB Number 2060–0243; expires 09/30/2010. EPA ICR Number 1967.03; NESHAP for Stationary Combustion Turbines (Renewal); in 40 CFR part 63, subpart YYYY; was approved 09/19/2007; OMB Number 2060–0540; expires 09/30/2010. EPA ICR Number 2243.04; Procedures for Implementing the National Environmental Policy Act (NEPA) and Assessing Environmental Effects Abroad of EPA Actions (Final Rule); was E:\FR\FM\17OCN1.SGM 17OCN1

Agencies

[Federal Register Volume 72, Number 200 (Wednesday, October 17, 2007)]
[Notices]
[Pages 58840-58841]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-20392]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

October 11, 2007.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

Agency Holding Meeting:  Federal Energy Regulatory Commission.

Date And Time:  October 18, 2007, 10 a.m.

Place:  Room 2C, 888 First Street, NE., Washington, DC 20426.

Status:  Open.

Matters To Be Considered:  Agenda. * Note--Items listed on the agenda 
may be deleted without further notice.

Contact Person For More Information: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

                                         923rd--Meeting Regular Meeting
                                           [October 18, 2007, 10 a.m.]
----------------------------------------------------------------------------------------------------------------
        Item No.                     Docket No.                                    Company
----------------------------------------------------------------------------------------------------------------
                                                 ADMINISTRATIVE
----------------------------------------------------------------------------------------------------------------
A-1.....................  AD02-1-000......................  Agency Administrative Matters.
A-2.....................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                             Operations.
A-3.....................  AD06-3-000......................  Energy Market Update.
----------------------------------------------------------------------------------------------------------------
                                                    ELECTRIC
----------------------------------------------------------------------------------------------------------------
E-1.....................  EL00-95-164.....................  San Diego Gas & Electric Company (Bonneville Power
                                                             Administration v. Federal Energy Regulatory
                                                             Commission).
E-2.....................  RR07-16-000.....................  North American Electric Reliability Corporation.
E-3.....................  EC07-39-000, EC07-39-001, EC07-   The Goldman Sachs Group, Inc.
                           39-002.
E-4.....................  EC07-45-000, EC07-45-001, EC07-   Morgan Stanley.
                           45-002.
E-5.....................  EC07-99-000.....................  Great Plains Energy Incorporated.
                          EL07-75-000.....................  Kansas City Power & Light Company Aquila, Inc.,
                                                             Black Hills Corporation.
E-6.....................  EC06-166-000, EC06-166-001......  Legg Mason, Inc.
E-7.....................  ER07-478-001, ER07-478-003......  Midwest Independent Transmission System Operator,
                                                             Inc.
E-8.....................  ER07-478-002....................  Midwest Independent Transmission System Operator,
                                                             Inc.
E-9.....................  RR06-1-010......................  North American Electric Reliability Corporation.
E-10....................  OMITTED.........................
E-11....................  ER07-1186-000...................  PJM Interconnection, L.L.C.
E-12....................  ER07-1251-000, ER07-1251-001....  Northern Maine Independent System Administrator,
                                                             Inc.
E-13....................  ER07-1245-000...................  ISO New England Inc. and New England Power Pool.
E-14....................  RC07-1-000......................  Mosaic Fertilizer, LLC.
                          RC07-2-000......................  City of Tampa, Florida.
E-15....................  ER07-995-000, ER07-995-001......  New York Independent System Operator, Inc.
E-16....................  ER07-546-002....................  ISO New England Inc.
                          ER07-546-003, ER07-547-001......  New England Power Pool.
E-17....................  EL07-31-000.....................  DTE Pontiac North LLC.
E-18....................  OMITTED.........................
E-19....................  ER07-805-001, ER07-805-002, ER07- California Independent System Operator Corporation.
                           1304-000.
E-20....................  ER97-4166-024, ER96-780-017,      Southern Company Energy Marketing, L.P. and Southern
                           EL04-124-005.                     Company Services, Inc.
E-21....................  ER07-748-001....................  New York Independent System Operator, Inc.
E-22....................  ER07-541-002....................  Entergy Services, Inc.
E-23....................  ER05-231-005, ER05-231-006......  PSEG Power Connecticut, LLC.
E-24....................  ER05-163-005, ER05-163-006......  Milford Power Company, LLC.
E-25....................  EL05-76-002.....................  The United Illuminating Company v. Dominion Energy
                                                             Marketing, Inc.
E-26....................  ER07-525-002....................  Entergy Services, Inc.
E-27....................  ER06-1218-005...................  PJM Interconnection, L.L.C.

[[Page 58841]]

 
E-28....................  OMITTED.........................
----------------------------------------------------------------------------------------------------------------
                                                  MISCELLANEOUS
----------------------------------------------------------------------------------------------------------------
M-1.....................  OMITTED.........................
----------------------------------------------------------------------------------------------------------------
                                                       GAS
----------------------------------------------------------------------------------------------------------------
G-1.....................  OMITTED.........................
G-2.....................  RP07-500-000, RP07-500-001, RP07- Columbia Gulf Transmission Company.
                           500-002.
G-3.....................  RP07-509-000, RP07-509-001, RP07- Columbia Gas Transmission Corporation.
                           509-002.
G-4.....................  RP07-179-002, RP07-179-001......  Gulf South Pipeline Company, LP.
G-5.....................  RP07-473-000....................  National Energy and Trade LP v. Texas Gas
                                                             Transmission LLC and Gulf South Pipeline LP.
----------------------------------------------------------------------------------------------------------------
                                                      HYDRO
----------------------------------------------------------------------------------------------------------------
H-1.....................  P-11437-022.....................  Hydro Matrix Limited Partnership.
H-2.....................  P-12484-002.....................  Metro Hydroelectric Company, LLC.
H-3.....................  P-9401-066......................  Mt. Hope Waterpower Project, L.L.P.
H-4.....................  P-12911-001, P-12911-002........  Electric Plant Board of the City of Paducah,
                                                             Kentucky
H-5.....................  P-1494-300......................  Grand River Dam Authority.
H-6.....................  P-233-105.......................  Pacific Gas and Electric Company.
----------------------------------------------------------------------------------------------------------------
                                                  CERTIFICATES
----------------------------------------------------------------------------------------------------------------
C-1.....................  OMITTED.........................
C-2.....................  CP07-88-000.....................  Egan Hub Storage, LLC.
C-3.....................  CP05-357-006....................  Cheniere Creole Trail Pipeline, L.P.
                          CP07-426-000....................  Cheniere Sabine Pass Pipeline, L.P.
C-4.....................  CP07-395-000....................  Wyoming Interstate Company, Ltd.
C-5.....................  RM07-17-000.....................  Revisions to Landowner Notification and Blanket
                                                             Certificate Regulations.
----------------------------------------------------------------------------------------------------------------


Kimberly D. Bose,
Secretary.

    A free Web cast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to www.ferc.gov's Calendar of Events and 
locating this event in the Calendar. The event will contain a link to 
its Web cast. The Capitol Connection provides technical support for the 
free Web casts. It also offers access to this event via television in 
the DC area and via phone bridge for a fee. If you have any questions, 
visit https://www.CapitolConnection.org or contact Danelle Springer or 
David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

 [FR Doc. E7-20392 Filed 10-16-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.