Georgia Power Company; Notice of Application for Non-Project Use of Project Lands and Waters and Soliciting Comments, Motions To Intervene, and Protests, 58657 [E7-20289]
Download as PDF
Federal Register / Vol. 72, No. 199 / Tuesday, October 16, 2007 / Notices
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
t. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–20288 Filed 10–15–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–094]
Georgia Power Company; Notice of
Application for Non-Project Use of
Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
mmaher on PROD1PC70 with NOTICES
October 4, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 2413–094.
c. Date Filed: August 23, 2007.
d. Applicant: Georgia Power
Company.
e. Name and Location of Project:
Wallace Dam Project is located on the
Lake Oconee in Greene County, Georgia.
The proposed project does not occupy
federal lands.
f. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
VerDate Aug<31>2005
04:12 Oct 16, 2007
Jkt 214001
g. Applicant Contact: Lee Glenn,
Georgia Power Company, 125 Wallace
Dam Road, NE., Eatonton, GA 31024,
(706) 485–8704.
h. FERC Contact: Gina Krump,
Telephone (202) 502–6704, or by e-mail
at gina.krump@ferc.gov.
i. Deadline for filing comments,
protests, and motions to intervene:
November 5, 2007.
All documents (original and eight
copies) should be filed with Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application: The
licensee is seeking Commission
approval to issue a permit to Heron
Cove Properties, LLC for the
construction of five docks, totaling 42
slips, a 985-foot seawall, and a boat
ramp on approximately 0.13 acre of
project land. The proposal is for the use
of residents at a condominium
development. All proposed work is
consistent with the current permitting
limitations.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘e-Library’’ link.
Enter the project number excluding the
last three digits (P–2413–094) in the
docket number field to access the
document. For online assistance,
contact FERCOnlineSupport@ferc.gov or
call toll-free (866) 208–3676, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g.
l. Individual desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
58657
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
o. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filling comments, it will be assumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–20289 Filed 10–15–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2407–120]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
October 9, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance of Drawdown Limits.
b. Project No.: 2407–120.
c. Date Filed: September 4, 2007.
d. Applicant: Alabama Power
Company.
e. Name of Project: The Yates and
Thurlow Project.
f. Location of Project: The Yates and
Thurlow Project is located on the
Tallapoosa River in Tallapoosa and
Elmore Counties, Alabama.
E:\FR\FM\16OCN1.SGM
16OCN1
Agencies
[Federal Register Volume 72, Number 199 (Tuesday, October 16, 2007)]
[Notices]
[Page 58657]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-20289]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2413-094]
Georgia Power Company; Notice of Application for Non-Project Use
of Project Lands and Waters and Soliciting Comments, Motions To
Intervene, and Protests
October 4, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No.: 2413-094.
c. Date Filed: August 23, 2007.
d. Applicant: Georgia Power Company.
e. Name and Location of Project: Wallace Dam Project is located on
the Lake Oconee in Greene County, Georgia. The proposed project does
not occupy federal lands.
f. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
g. Applicant Contact: Lee Glenn, Georgia Power Company, 125 Wallace
Dam Road, NE., Eatonton, GA 31024, (706) 485-8704.
h. FERC Contact: Gina Krump, Telephone (202) 502-6704, or by e-mail
at gina.krump@ferc.gov.
i. Deadline for filing comments, protests, and motions to
intervene: November 5, 2007.
All documents (original and eight copies) should be filed with
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing a document with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the documents on that resource agency.
j. Description of Application: The licensee is seeking Commission
approval to issue a permit to Heron Cove Properties, LLC for the
construction of five docks, totaling 42 slips, a 985-foot seawall, and
a boat ramp on approximately 0.13 acre of project land. The proposal is
for the use of residents at a condominium development. All proposed
work is consistent with the current permitting limitations.
k. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``e-Library'' link. Enter the project
number excluding the last three digits (P-2413-094) in the docket
number field to access the document. For online assistance, contact
FERCOnlineSupport@ferc.gov or call toll-free (866) 208-3676, for TTY,
call (202) 502-8659. A copy is also available for inspection and
reproduction at the addresses in item g.
l. Individual desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
o. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filling
comments, it will be assumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-20289 Filed 10-15-07; 8:45 am]
BILLING CODE 6717-01-P