Drawbridge Operation Regulations; Charenton Drainage and Navigation Canal, Baldwin, LA, 58250-58251 [E7-20207]
Download as PDF
58250
Federal Register / Vol. 72, No. 198 / Monday, October 15, 2007 / Rules and Regulations
PART 4022—BENEFITS PAYABLE IN
TERMINATED SINGLE-EMPLOYER
PLANS
1. The authority citation for part 4022
continues to read as follows:
I
Authority: 29 U.S.C. 1302, 1322, 1322b,
1341(c)(3)(D), and 1344.
Appendix B to Part 4022—Lump Sum
Interest Rates for PBGC Payments
2. In appendix B to part 4022, Rate Set
169, as set forth below, is added to the
table.
*
I
For plans with a valuation
date
Rate set
On or after
*
*
*
169 ............................................................................
3. In appendix C to part 4022, Rate Set
169, as set forth below, is added to the
table.
I
Before
Immediate annuity rate
(percent)
*
12–1–07
11–1–07
*
*
*
*
Deferred annuities
(percent)
i2
i1
*
3.25
i3
*
4.00
4.00
n1
n2
*
4.00
7
8
Appendix C to Part 4022—Lump Sum
Interest Rates for Private-Sector
Payments
*
*
*
*
*
For plans with a valuation
date
Rate set
On or after
*
*
*
169 ............................................................................
11–1–07
Before
Immediate annuity rate
(percent)
*
12–1–07
Deferred annuities
(percent)
i2
i1
*
3.25
i3
*
4.00
4.00
n1
n2
*
4.00
7
8
Authority: 29 U.S.C. 1301(a), 1302(b)(3),
1341, 1344, 1362.
PART 4044—ALLOCATION OF
ASSETS IN SINGLE-EMPLOYER
PLANS
Appendix B to Part 4044—Interest
Rates Used to Value Benefits
5. In appendix B to part 4044, a new
entry for November 2007, as set forth
below, is added to the table.
*
I
4. The authority citation for part 4044
continues to read as follows:
I
*
*
*
*
The values of it are:
For valuation dates occurring in the month—
it
*
*
*
*
November 2007 ................................................................................................................
Issued in Washington, DC, on this 10th day
of October 2007.
Vincent K. Snowbarger,
Deputy Director, Pension Benefit Guaranty
Corporation.
[FR Doc. E7–20270 Filed 10–12–07; 8:45 am]
BILLING CODE 7709–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
yshivers on PROD1PC62 with RULES
[CGD08–07–025]
AGENCY:
Coast Guard, DHS.
VerDate Aug<31>2005
12:51 Oct 12, 2007
Notice of temporary deviation
from regulations.
ACTION:
SUMMARY: The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the BNSF
Railway Company Swing Bridge across
the Charenton Drainage and
Navigational Canal, mile 0.4, at
Baldwin, St. Mary Parish, LA. This
deviation provides for the bridge to
remain closed to navigation for 5 days
with three hour openings each day to
conduct maintenance repairs to the
drawbridge.
This deviation is effective from
8 a.m. on October 22, 2007 through 8
p.m. on October 26, 2007.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the office of the Eighth Coast
DATES:
Drawbridge Operation Regulations;
Charenton Drainage and Navigation
Canal, Baldwin, LA
Jkt 214001
*
.0546
PO 00000
Frm 00008
Fmt 4700
Sfmt 4700
for t =
it
1-20
*
.0513
for t =
>20
it
*
N/A
for t =
N/A
Guard District, Bridge Administration
Branch, Hale Boggs Federal Building,
Room 1313, 500 Poydras Street, New
Orleans, Louisiana 70130–3310 between
7 a.m. and 3 p.m., Monday through
Friday, except Federal holidays. The
telephone number is (504) 671–2128.
The Bridge Administration Branch
maintains the public docket for this
temporary deviation.
FOR FURTHER INFORMATION CONTACT: Bart
Marcules, Bridge Administration
Branch, telephone (504) 671–2128.
SUPPLEMENTARY INFORMATION: The BNSF
Railway Company has requested a
temporary deviation in order to replace
or repair a bent shaft, bearings, and
housing that are integral to the safe
operation of the swing bridge across the
Charenton Drainage and Navigational
Canal, mile 0.4, at Baldwin, St. Mary
Parish, LA. This bridge opens on signal
E:\FR\FM\15OCR1.SGM
15OCR1
Federal Register / Vol. 72, No. 198 / Monday, October 15, 2007 / Rules and Regulations
in accordance with 33 CFR 117.5, but
this temporary deviation will allow the
bridge to remain in the closed-tonavigation position from 8 a.m. on
October 22, 2007 through 8 p.m. on
October 26, 2007. BNSF will provide an
opening from 8 a.m. till 11 a.m. every
day starting October 23, 2007. An
alternate route is available through the
Berwick Locks. The bridge provides 10
feet of vertical clearance in the closedto-navigation position. Navigation on
the waterway consists of tugs with tows,
fishing vessels and recreational craft
including sailboats and powerboats. Due
to prior experience, as well as
coordination with waterway users, and
an alternate route through Berwick
Locks it has been determined that this
closure will not have a significant effect
on these vessels.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: October 2, 2007.
David M. Frank,
Bridge Administrator.
[FR Doc. E7–20207 Filed 10–12–07; 8:45 am]
BILLING CODE 4910–15–P
POSTAL SERVICE
39 CFR Part 601
Purchasing of Property and Services
Postal Service.
Final rule.
AGENCY:
yshivers on PROD1PC62 with RULES
ACTION:
SUMMARY: The Postal ServiceTM is
making several minor revisions to its
regulations governing the purchasing of
property and services to comply with
certain findings and suggestions of the
Government Accountability Office, and
to clarify a variety of procedural
matters.
DATES: This final rule is effective
November 14, 2007.
FOR FURTHER INFORMATION CONTACT: Paul
McGinn, (202) 268–4638, or Syvera
O’Pharrow, (202) 268–8110.
SUPPLEMENTARY INFORMATION: The Postal
Service is making several minor
revisions to its regulations governing the
purchasing of property and services in
order to (1) comply with some of the
findings in the Government
Accountability Office’s (GAO) report,
GAO–06–190, U.S. Postal Service:
Purchasing Changes Seem Promising,
but Revisions to Ombudsman Position
are Needed, and (2) clarify some
procedural matters. In its report, GAO
VerDate Aug<31>2005
12:51 Oct 12, 2007
Jkt 214001
stated that the Postal Service’s
Ombudsman regulatory provisions and
guidance contained in 39 CFR Part 601
were inconsistent with leading
Ombudsman principles and practices.
In response, the Postal Service
benchmarked its supplier disagreement
resolution process against a variety of
private sector companies, and found
that the process conforms to leading
business principles and practices. We
do agree with GAO that the use of the
term Ombudsman is inaccurate,
however, and therefore have changed
the term to Supplier Disagreement
Resolution Official (SDR Official). In
addition, several minor procedural
changes have been made to the
regulations and business processes
published in May of 2005, and these are
explained in more detail below.
Explanation of Changes
Section 601.100 Purchasing Policy
This section has been revised for
clarity, specifically by stating that the
Postal Service acquires property and
services pursuant to the authority of 39
U.S.C. 410.
Section 601.101 Effective Date
This section has been revised to state
that the revised regulations will take
effect thirty days after publication.
Section 601.102 Revocation of Prior
Purchasing Regulations
The reference to section 601.103 has
been deleted due to a revision to that
section.
Section 601.103 Applicability and
Coverage
This section has been revised to state
that these regulations apply to all Postal
Service acquisitions of property (except
real property) and services.
Section 601.104 Postal Purchasing
Authority
This section has not been changed.
Section 601.105 Business
Relationships
In paragraph (a), the last sentence of
the text has been revised to make it clear
that the Postal Service reserves the right
to decline to accept or consider
proposals from a person or organization
when that person or organization fails to
meet reasonable business expectations.
Previous section 601.106 has been
revised and included in this section as
a new paragraph (b). The first sentence
in the new paragraph (b) has been
revised for clarity by indicating under
what circumstances the Postal Service
reserves the right to decline to accept or
consider proposals. Paragraph (c) has
PO 00000
Frm 00009
Fmt 4700
Sfmt 4700
58251
been revised to state that written notices
must be by certified mail, return receipt
requested. Subparagraph (c)(4) has been
revised to require that the written notice
to the supplier establish the period of
time during which the decision to
decline to accept or consider proposals
is in effect. Paragraph (d) has been
revised to provide a cross-reference to
section 601.108.
Section 601.106 Reserved
As discussed above, the previous text
in this section has been combined into
a new paragraph (b) of section 601.105.
Section 601.107 Initial Disagreement
Resolution
This section includes a new
paragraph (a) ‘‘Definitions’’, that
provides definition for certain terms
that appear throughout the regulations.
Paragraph (b) has been revised to state
that all disagreements lodged with the
contracting officer must be in writing
and to describe the methods in which a
person or organization may lodge a
business disagreement with the
contracting officer and to delineate the
timeframe a person or organization has
to lodge a disagreement. This section
has also been revised to state that the
contracting officer’s manager may help
to resolve the disagreement and that at
the conclusion of the ten day resolution
period, the contracting officer must
communicate, in writing, to the supplier
his or her resolution of the
disagreement. This section has been
further revised by moving the text
discussing disagreements not resolved
within 10 days to section 601.108(a).
The text regarding alternative dispute
resolution has been retained and
codified in paragraph (c).
Section 601.108 SDR Official
Disagreement Resolution
The Ombudsman has been given a
new title: Supplier Disagreement
Resolution Official (‘‘SDR Official’’),
and this term is used throughout the
regulations. Text regarding
disagreements not resolved within 10
days has been moved from section
601.107 to this section under paragraph
(a). Because neither 39 U.S.C. 410 nor
other public laws apply to the Postal
Service’s administrative resolution of
supplier disagreements, the previous
reference to ‘‘39 U.S.C. 410, and all
other applicable public laws enacted by
Congress’’ has been deleted. The
definition of disagreements in paragraph
(b) has been deleted and is now
included in the ‘‘Definitions’’ paragraph
discussed above. Paragraph (c) has been
expanded to include the address for
submitting supplier disagreements. In
E:\FR\FM\15OCR1.SGM
15OCR1
Agencies
[Federal Register Volume 72, Number 198 (Monday, October 15, 2007)]
[Rules and Regulations]
[Pages 58250-58251]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-20207]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-07-025]
Drawbridge Operation Regulations; Charenton Drainage and
Navigation Canal, Baldwin, LA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
BNSF Railway Company Swing Bridge across the Charenton Drainage and
Navigational Canal, mile 0.4, at Baldwin, St. Mary Parish, LA. This
deviation provides for the bridge to remain closed to navigation for 5
days with three hour openings each day to conduct maintenance repairs
to the drawbridge.
DATES: This deviation is effective from 8 a.m. on October 22, 2007
through 8 p.m. on October 26, 2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the office of the Eighth Coast Guard District,
Bridge Administration Branch, Hale Boggs Federal Building, Room 1313,
500 Poydras Street, New Orleans, Louisiana 70130-3310 between 7 a.m.
and 3 p.m., Monday through Friday, except Federal holidays. The
telephone number is (504) 671-2128. The Bridge Administration Branch
maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Bart Marcules, Bridge Administration
Branch, telephone (504) 671-2128.
SUPPLEMENTARY INFORMATION: The BNSF Railway Company has requested a
temporary deviation in order to replace or repair a bent shaft,
bearings, and housing that are integral to the safe operation of the
swing bridge across the Charenton Drainage and Navigational Canal, mile
0.4, at Baldwin, St. Mary Parish, LA. This bridge opens on signal
[[Page 58251]]
in accordance with 33 CFR 117.5, but this temporary deviation will
allow the bridge to remain in the closed-to-navigation position from 8
a.m. on October 22, 2007 through 8 p.m. on October 26, 2007. BNSF will
provide an opening from 8 a.m. till 11 a.m. every day starting October
23, 2007. An alternate route is available through the Berwick Locks.
The bridge provides 10 feet of vertical clearance in the closed-to-
navigation position. Navigation on the waterway consists of tugs with
tows, fishing vessels and recreational craft including sailboats and
powerboats. Due to prior experience, as well as coordination with
waterway users, and an alternate route through Berwick Locks it has
been determined that this closure will not have a significant effect on
these vessels.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 2, 2007.
David M. Frank,
Bridge Administrator.
[FR Doc. E7-20207 Filed 10-12-07; 8:45 am]
BILLING CODE 4910-15-P