Public Power & Utility, Inc.; Notice of Issuance of Order, 57315-57316 [E7-19769]
Download as PDF
Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices
RP06–182–000, wherein the
Commission directed Midwestern to file
an activity report after one year of
service detailing its experience with the
implementation of the new service
under Rate Schedule TPB.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Protest Date: 5 p.m. Eastern Time on
October 3, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–19773 Filed 10–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1207–000 and ER07–
1207–001]
mstockstill on PROD1PC66 with NOTICES
Premier Energy Marketing LLC.; Notice
of Issuance of Order
September 25, 2007.
Premier Energy Marketing LLC
(Premier) filed an application for
market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy and
VerDate Aug<31>2005
17:07 Oct 05, 2007
Jkt 214001
capacity at market-based rates. Premier
also requested waivers of various
Commission regulations. In particular,
Premier requested that the Commission
grant blanket approval under 18 CFR
part 34 of all future issuances of
securities and assumptions of liability
by Premier.
On September 17, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Premier, should file a
protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is October
18, 2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Premier is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Premier, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Premier’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
57315
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–19771 Filed 10–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1161–000 and ER07–
1161–001]
Public Power & Utility, Inc.; Notice of
Issuance of Order
September 25, 2007.
Public Power & Utility, Inc. (PP&U)
filed an application for market-based
rate authority, with an accompanying
rate schedule. The proposed marketbased rate schedule provides for the sale
of energy and capacity at market-based
rates. PP&U also requested waivers of
various Commission regulations. In
particular, PP&U requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by PP&U.
On September 17, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
Mittal, should file a protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing protests is October
18, 2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, PP&U is authorized
to issue securities and assume
obligations or liabilities as a guarantor,
indorser, surety, or otherwise in respect
of any security of another person;
provided that such issuance or
assumption is for some lawful object
within the corporate purposes of PP&U,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
E:\FR\FM\09OCN1.SGM
09OCN1
57316
Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of PP&U’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–19769 Filed 10–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–449–000]
Southern Natural Gas Company;
Notice of Request Under Blanket
Authorization
mstockstill on PROD1PC66 with NOTICES
September 26, 2007.
Take notice that on September 19,
2007, Southern Natural Gas Company
(Southern), Colonial Brookwood Center,
569 Brookwood Village, Birmingham,
Alabama 35209, filed in Docket No.
CP07–449–000, a prior notice request
pursuant to sections 157.205 and
157.208 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act for
authorization to continue the use of a
skid mounted compressor unit, located
in Screven County, Georgia, that was
installed in 2006 as emergency
compression, all as more fully set forth
in the application, which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
VerDate Aug<31>2005
17:07 Oct 05, 2007
Jkt 214001
Specifically, Southern proposes to
continue the use of the Woodcliff
Compressor Unit, rated at 5,278
horsepower, that was installed as an
emergency facility in order to restore the
availability of Southern’s gulf coast
infrastructure caused in August and
September 2005 by Hurricanes Katrina
and Rita. Southern states that the total
cost for refurbishing and installation
was $2,177,371. Southern asserts that it
would be more economical to continue
the use of the unit at its refurbished
state rather than place it back in storage
and the unit continues to be a
worthwhile asset to support incremental
gas supplies on the system. Southern
states that the unit will not be utilized
to serve additional firm requirements.
Any questions regarding the
application should be directed to
Patricia S. Francis, Senior Counsel,
Southern Natural Gas Company, Post
Office Box 2563, Birmingham, Alabama
35202–2563, or call at (205) 325–7696.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–19781 Filed 10–5–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. NJ07–9–000]
Southwestern Power Administration;
Notice of Filing
September 28, 2007.
Take notice that on September 27,
2007, Southwestern Power
Administration (Southwestern) filed a
non-jurisdictional modification to its
Open Access Transmission Tariff,
including Small Generator
Interconnection Procedures, Small
Generator Interconnection Agreement,
Large Generator Interconnection
Procedures and Large Generator
Interconnection Agreement.
Southwestern has requested that the
revised non-jurisdictional Open Access
Transmission Tariff become effective
December 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 72, Number 194 (Tuesday, October 9, 2007)]
[Notices]
[Pages 57315-57316]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-19769]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER07-1161-000 and ER07-1161-001]
Public Power & Utility, Inc.; Notice of Issuance of Order
September 25, 2007.
Public Power & Utility, Inc. (PP&U) filed an application for
market-based rate authority, with an accompanying rate schedule. The
proposed market-based rate schedule provides for the sale of energy and
capacity at market-based rates. PP&U also requested waivers of various
Commission regulations. In particular, PP&U requested that the
Commission grant blanket approval under 18 CFR part 34 of all future
issuances of securities and assumptions of liability by PP&U.
On September 17, 2007, pursuant to delegated authority, the
Director, Division of Tariffs and Market Development-West, granted the
requests for blanket approval under part 34 (Director's Order). The
Director's Order also stated that the Commission would publish a
separate notice in the Federal Register establishing a period of time
for the filing of protests. Accordingly, any person desiring to be
heard concerning the blanket approvals of issuances of securities or
assumptions of liability by Mittal, should file a protest with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the deadline for filing protests is
October 18, 2007.
Absent a request to be heard in opposition to such blanket
approvals by the deadline above, PP&U is authorized to issue securities
and assume obligations or liabilities as a guarantor, indorser, surety,
or otherwise in respect of any security of another person; provided
that such issuance or assumption is for some lawful object within the
corporate purposes of PP&U, compatible with the public interest, and is
reasonably necessary or appropriate for such purposes.
[[Page 57316]]
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of PP&U's issuance of securities or assumptions of
liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-19769 Filed 10-5-07; 8:45 am]
BILLING CODE 6717-01-P