Environmental Impact Statements and Regulations; Availability of EPA Comments, 55200-55201 [E7-19229]
Download as PDF
55200
Federal Register / Vol. 72, No. 188 / Friday, September 28, 2007 / Notices
close of the comment period will be
marked ‘‘late.’’ EPA is not required to
consider these late comments.
If you submit an electronic comment,
EPA recommends that you include your
name, mailing address, and an e-mail
address or other contact information in
the body of your comment and with any
disk or CD–ROM you submit. This
ensures that you can be identified as the
submitter of the comment and allows
EPA to contact you in case EPA cannot
read your comment due to technical
difficulties or needs further information
on the substance of your comment. Any
identifying or contact information
provided in the body of a comment will
be included as part of the comment that
is placed in the official public docket,
and made available in EPA’s electronic
public docket. If EPA cannot read your
comment due to technical difficulties
and cannot contact you for clarification,
EPA may not be able to consider your
comment.
Use of the https://www.regulations.gov
Web site to submit comments to EPA
electronically is EPA’s preferred method
for receiving comments. The electronic
public docket system is an ‘‘anonymous
access’’ system, which means EPA will
not know your identity, e-mail address,
or other contact information unless you
provide it in the body of your comment.
In contrast to EPA’s electronic public
docket, EPA’s electronic mail (e-mail)
system is not an ‘‘anonymous access’’
system. If you send an e-mail comment
directly to the Docket without going
through https://www.regulations.gov,
your e-mail address is automatically
captured and included as part of the
comment that is placed in the official
public docket, and made available in
EPA’s electronic public docket.
Dated: September 21, 2007.
Richard B. Ossias,
Associate General Counsel.
[FR Doc. E7–19225 Filed 9–27–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6691–5]
jlentini on PROD1PC65 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
VerDate Aug<31>2005
18:15 Sep 27, 2007
Jkt 211001
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 6, 2007 (92 FR 17156).
Draft EISs
EIS No. 20070213, ERP No. D–DOE–
A09834–00, FutureGen Project,
Planning, Design, Construction and
Operation of a Coal Fueled Electric
Power and Hydrogen Gas Production
Plant, Four Alternative Sites:
Mattoon, IL, Tuscola, IL, Jewett, TX,
and Odessa, TX.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and the cumulative impacts
of water use, and recommended that the
DEIS provide more details on how many
wetlands may be impacted at each
alternative site and that a cumulative
impacts evaluation be conducted for at
least the 50-year operational life of the
project.
Rating EC2.
EIS No. 20070231, ERP No. D–UAF–
A11078–00, Common Battlefield
Airmen Training (CBAT) Program,
Proposes to Implement the CBAT
Program at One of Three Installations:
Moody Air Force Base (AFB), near
Valosta, GA; Barkdale AFB in Bossier
City, LA; and Arnold AFB near
Manchester, TN.
Summary: EPA does not object to the
proposed project.
Rating LO.
EIS No. 20070312, ERP No. D–USN–
K11119–HI, Hawaii Range Complex
(HRC) Project, To Support and
Maintain Navy Pacific Fleet Training,
and Research, Development, Test, and
Evaluation (RDT&E) Operations,
Kauai, Honolulu, Maui and Hawaii
Counties, HI.
Summary: EPA expressed
environmental concern about impacts to
marine resources from mid-frequency
active sonar use and recommended
analysis of additional alternatives.
Rating EC2.
EIS No. 20070316, ERP No. D–FHW–
E40815–00, Northern Corridor
Interstate 73 Project, Proposes
Construct from I–95 to Future
Interstate 74, Marlboro and Dillion
Counties, SC and Richmond County,
NC.
Summary: EPA expressed
environmental concerns about wetland,
stream, prime farmland, and noise
impacts, and requested additional
information on these issues be provided
and that mitigation measures be
developed.
Rating EC1.
EIS No. 20070326, ERP No. D–FTA–
G59002–TX, University Corridor
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Fixed Guideway Project, To
Implement Transit Improvements
from Hillcroft Transit Center to the
Vicinity of the University of Houston
(UH)—Central Campus or the
Eastwood Transit Center, City of
Houston, Harris County, TX.
Summary: While EPA had no
objections to the proposed action, we
requested clarification of some air
quality issues.
Rating LO.
Final EISs
EIS No. 20070347, ERP No. F–FRC–
G03032–TX, Calhoun Point Comfort
Liquefied Natural Gas (LNG) Project,
(Docket Nos. CP05–91–000 and CP06–
380–00) Construction of New Pipeline
on 73 acres, Port of Port Lavaca,
Calhoun and Jackson Counties, TX.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070348, ERP No. F–NPS–
G65103–NM, Bandelier National
Monument, Ecological Restoration
Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the
Pinon-Juniper Woodland, Los Alamos
and Sandoval Counties, NM.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070355, ERP No. F–FRC–
G03035–00, Southeast Supply Header
Project, Construction and Operation
of Natural Gas Pipeline Facilities,
Located in various Counties and
Parishes in LA, MS and AL.
Summary: While EPA’s previous
issues have been resolved, we requested
clarification of some EJ and wetlands
issues.
EIS No. 20070371, ERP No. F–BLM–
J65473–WY, Eagle Butte West Coal
Lease Application, Issuance of Lease
for a Tract of Federal Coal, Wyoming
Powder River Basin, Campbell
County, WY.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070328, ERP No. FS–BLM–
J67026–MT, Golden Sunlight Mine Pit
Reclamation Alternatives, Preferred
Alternative Selected is the
Underground Sump Alternative,
Operating Permit No. 00065 and Planof-Operation #MTM 82855, Whitehall,
Jefferson County, MT.
Summary: EPA continues to have
environmental concerns about the longterm environmental impacts to water
quality.
E:\FR\FM\28SEN1.SGM
28SEN1
Federal Register / Vol. 72, No. 188 / Friday, September 28, 2007 / Notices
Dated: September 25, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–19229 Filed 9–27–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6691–4]
jlentini on PROD1PC65 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa.
Weekly receipt of Environmental Impact
Statements
Filed 09/17/2007 through 09/21/2007.
Pursuant to 40 CFR 1506.9.
EIS No. 20070396, Draft EIS, AFS, ID,
Cherry Dinner Project, Management of
Vegetation, Hazardous Fuels, and
Access Plus Watershed
Improvements, Amendment to the
Forest Plan, Palouse Ranger District,
Clearwater National Forest, Latah
County, ID, Comment Period Ends:
11/13/2007. Contact: Kara Chadwick
208–875–1131.
EIS No. 20070397, Final EIS, AFS, WA,
Tripod Fire Salvage Project, Proposal
to Salvage Harvest Dead Trees and
Fire-Injured Trees Expected to Die
Within One Year, Methow Valley and
Tonasket Ranger Districts, Okanogan
and Wenatchee National Forests,
Okanogan County, WA, Wait Period
Ends: 10/29/2007. Contact: Robert
Stoehr 509–548–6977.
EIS No. 20070398, Final EIS, BLM, AK,
Kobuk-Seward Peninsula Resource
Management Plan, from Point Lay to
the North Sound and from the Bering
and Chukchi Seas East to the Kobuk
River, AK , Wait Period Ends: 10/29/
2007. Contact: Jeanie Cole 907–474–
2340.
EIS No. 20070399, Draft EIS, FTA, FL,
Tier 1 Programmatic—Jacksonville
Rapid Transit System (RTS),
Improvement to Transportation in
Four Primary Transit Corridors
Radiating from Downtown
Jacksonville, Duval County, FL.
Comment Period Ends: 11/13/2007.
Contact: Tajsha LaShore 404–562–
3507.
EIS No. 20070400, Draft EIS, FRC, CA,
Upper American River Hydroelectric
FERC NO. 2101–084, El Dorado and
Sacramento Counties, CA and Chili
Bar Hydroelectric FERC No. 2155–
024, El Dorado County, CA, Issuance
of a New License for the Existing and
VerDate Aug<31>2005
17:12 Sep 27, 2007
Jkt 211001
Proposed Hydropower Projects.
Comment Period Ends: 11/13/2007.
Contact: Andy Black 1–866–208–
3372.
EIS No. 20070401, Draft EIS, GSA, DC,
Department of Homeland Security
Headquarters at the St. Elizabeths
West Campus, To Consolidate Federal
Office Space on a Secure Site,
Washington, DC. Comment Period
Ends: 11/13/2007. Contact: Denise
Decker 202–538–5643.
EIS No. 20070402, Final EIS, FRC, NM,
Phoenix Expansion Project,
Construction and Operation of
Existing Natural Gas Transmission
Pipeline, Right-of-Way Grant and
Temporary Use Permit, San Juan and
McKinley Counties, NM and Pinal
and Maricopa Counties, AZ. Wait
Period Ends: 10/29/2007. Contact:
Andy Black 1–866–208–3372.
55201
[EPA–HQ–ORD–2007–0609; FRL–8474–6]
teleconference call) will be held on
Tuesday, November 6, 2007, from 1 p.m.
to 3 p.m. All times noted are eastern
time. The meetings may adjourn early if
all business is finished. Requests for the
draft agenda or for making oral
presentations at the meetings will be
accepted up to 1 business day before
each meeting.
ADDRESSES: Participation in the
conference calls will be by
teleconference only—meeting rooms
will not be used. Members of the public
may obtain the call-in number and
access code for the calls from Heather
Drumm, whose contact information is
listed under the FOR FURTHER
INFORMATION CONTACT section of this
notice. Submit your comments,
identified by Docket ID No. EPA–HQ–
ORD–2007–0609, by one of the
following methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• E-mail: Send comments by
electronic mail (e-mail) to:
ORD.Docket@epa.gov, Attention Docket
ID No. EPA–HQ–ORD–2007–0609.
• Fax: Fax comments to: (202) 566–
0224, Attention Docket ID No. EPA–
HQ–ORD–2007–0609.
• Mail: Send comments by mail to:
Board of Scientific Counselors,
Endocrine Disrupting Chemicals (EDC)
Mid-Cycle Subcommittee Meeting—
Summer/Fall 2007 Docket, Mailcode:
28221T, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460, Attention
Docket ID No. EPA–HQ–ORD–2007–
0609.
• Hand Delivery or Courier. Deliver
comments to: EPA Docket Center (EPA/
DC), Room B102, EPA West Building,
1301 Constitution Avenue, NW.,
Washington, DC. Attention: Docket ID
No. EPA–HQ–ORD–2007–0609.
Board of Scientific Counselors,
Endocrine Disrupting Chemicals (EDC)
Research Program Mid-Cycle Review
Meetings—Summer/Fall 2007
Note: This is not a mailing address. Such
deliveries are only accepted during the
docket’s normal hours of operation, and
special arrangements should be made for
deliveries of boxed information.
Environmental Protection
Agency (EPA).
ACTION: Notice of meetings.
Instructions: Direct your comments to
Docket ID No. EPA–HQ–ORD–2007–
0609. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through https://
www.regulations.gov or e-mail. The
Amended Notices
EIS No. 20070218, Draft EIS, FHW, CA,
Interstate 405 (San Diego Freeway)
Sepulveda Pass Widening Project,
From Interstate 10 to US–101 in the
City of Los Angeles, Los Angeles
County, CA. Comment Period Ends:
10/01/2007. Contact: Steve Healow
916–498–5849. Revision of FR Notice
Published on 06/01/2007: Extending
Comment Period from 7/16/2007 to
10/01/2007.
Dated: September 25, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–19234 Filed 9–27–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
AGENCY:
SUMMARY: Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, the Environmental Protection
Agency, Office of Research and
Development (ORD), gives notice of two
meetings of the Board of Scientific
Counselors (BOSC) EDC Mid-Cycle
Subcommittee.
The first meeting (a
teleconference call) will be held on
Wednesday, October 17, 2007, from 3
p.m. to 5 p.m. The second meeting (a
DATES:
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 72, Number 188 (Friday, September 28, 2007)]
[Notices]
[Pages 55200-55201]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-19229]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6691-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 6, 2007 (92 FR 17156).
Draft EISs
EIS No. 20070213, ERP No. D-DOE-A09834-00, FutureGen Project, Planning,
Design, Construction and Operation of a Coal Fueled Electric Power and
Hydrogen Gas Production Plant, Four Alternative Sites: Mattoon, IL,
Tuscola, IL, Jewett, TX, and Odessa, TX.
Summary: EPA expressed environmental concerns about impacts to
wetlands and the Cumulative impacts of water use, and recommended that
the DEIS provide more details on how many wetlands may be impacted at
each alternative site and that a cumulative impacts evaluation be
conducted for at least the 50-year operational life of the project.
Rating EC2.
EIS No. 20070231, ERP No. D-UAF-A11078-00, Common Battlefield Airmen
Training (CBAT) Program, Proposes to Implement the CBAT Program at One
of Three Installations: Moody Air Force Base (AFB), near Valosta, GA;
Barkdale AFB in Bossier City, LA; and Arnold AFB near Manchester, TN.
Summary: EPA does not object to the proposed project.
Rating LO.
EIS No. 20070312, ERP No. D-USN-K11119-HI, Hawaii Range Complex (HRC)
Project, To Support and Maintain Navy Pacific Fleet Training, and
Research, Development, Test, and Evaluation (RDT&E) Operations, Kauai,
Honolulu, Maui and Hawaii Counties, HI.
Summary: EPA expressed environmental concern about impacts to
marine resources from mid-frequency active sonar use and recommended
analysis of additional alternatives.
Rating EC2.
EIS No. 20070316, ERP No. D-FHW-E40815-00, Northern Corridor Interstate
73 Project, Proposes Construct from I-95 to Future Interstate 74,
Marlboro and Dillion Counties, SC and Richmond County, NC.
Summary: EPA expressed environmental concerns about wetland,
stream, prime farmland, and noise impacts, and requested additional
information on these issues be provided and that mitigation measures be
developed.
Rating EC1.
EIS No. 20070326, ERP No. D-FTA-G59002-TX, University Corridor Fixed
Guideway Project, To Implement Transit Improvements from Hillcroft
Transit Center to the Vicinity of the University of Houston (UH)--
Central Campus or the Eastwood Transit Center, City of Houston, Harris
County, TX.
Summary: While EPA had no objections to the proposed action, we
requested clarification of some air quality issues.
Rating LO.
Final EISs
EIS No. 20070347, ERP No. F-FRC-G03032-TX, Calhoun Point Comfort
Liquefied Natural Gas (LNG) Project, (Docket Nos. CP05-91-000 and CP06-
380-00) Construction of New Pipeline on 73 acres, Port of Port Lavaca,
Calhoun and Jackson Counties, TX.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070348, ERP No. F-NPS-G65103-NM, Bandelier National Monument,
Ecological Restoration Plan, Reestablish Healthy, Sustainable
Vegetative Conditions within the Pinon-Juniper Woodland, Los Alamos and
Sandoval Counties, NM.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070355, ERP No. F-FRC-G03035-00, Southeast Supply Header
Project, Construction and Operation of Natural Gas Pipeline Facilities,
Located in various Counties and Parishes in LA, MS and AL.
Summary: While EPA's previous issues have been resolved, we
requested clarification of some EJ and wetlands issues.
EIS No. 20070371, ERP No. F-BLM-J65473-WY, Eagle Butte West Coal Lease
Application, Issuance of Lease for a Tract of Federal Coal, Wyoming
Powder River Basin, Campbell County, WY.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070328, ERP No. FS-BLM-J67026-MT, Golden Sunlight Mine Pit
Reclamation Alternatives, Preferred Alternative Selected is the
Underground Sump Alternative, Operating Permit No. 00065 and Plan-of-
Operation MTM 82855, Whitehall, Jefferson County, MT.
Summary: EPA continues to have environmental concerns about the
long-term environmental impacts to water quality.
[[Page 55201]]
Dated: September 25, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-19229 Filed 9-27-07; 8:45 am]
BILLING CODE 6560-50-P