Advisory Committee on Reactor Safeguards (ACRS); Subcommittee Meeting on Power Uprates (Susquehanna); Notice of Meeting, 54694 [E7-18980]
Download as PDF
54694
Federal Register / Vol. 72, No. 186 / Wednesday, September 26, 2007 / Notices
as is necessary to protect proprietary or
privileged information that may be
present in the meeting room. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public.
(e) A transcript is kept for certain
open portions of the meeting and will be
available in the NRC Public Document
Room (PDR), One White Flint North,
Room O–1F21, 11555 Rockville Pike,
Rockville, MD 20852–2738. A copy of
the certified minutes of the meeting will
be available at the same location up to
3 months following the meeting. Copies
may be obtained upon payment of
appropriate reproduction charges.
ACNW&M meeting agenda, transcripts,
and letter reports are available through
the PDR at pdr@nrc.gov, by calling the
PDR at 1–800–394–4209, or from the
Publicly Available Records System
(PARS) component of NRC’s document
system (ADAMS) which is accessible
from the NRC Web site at https://
www.nrc.gov/reading-rm/adams.html or
https://www.nrc.gov/reading-rm/doccollections/ (ACNW&M schedules and
agendas).
(f) Video teleconferencing service is
available for observing open sessions of
ACNW&M meetings. Those wishing to
use this service for observing ACNW&M
meetings should contact Mr. Theron
Brown, ACNW&M Audio Visual
Specialist, (301–415–8066) between
7:30 a.m. and 3:45 p.m. Eastern Time at
least 10 days before the meeting to
ensure the availability of this service.
Individuals or organizations requesting
this service will be responsible for
telephone line charges and for providing
the equipment and facilities that they
use to establish the video
teleconferencing link. The availability of
video teleconferencing services is not
guaranteed.
mstockstill on PROD1PC66 with NOTICES
ACNW&M Working Group Meetings
From time to time the ACNW&M may
sponsor an in-depth meeting on a
specific technical issue to understand
staff expectations and review work in
progress. Such meetings are called
Working Group meetings. These
Working Group meetings will also be
conducted in accordance with the
procedures noted above for the
ACNW&M meeting, as appropriate.
When Working Group meetings are held
at locations other than at NRC facilities,
reproduction facilities may not be
available at a reasonable cost.
Accordingly, 50 copies of the materials
to be used during the meeting should be
provided for distribution at such
meetings.
VerDate Aug<31>2005
17:57 Sep 25, 2007
Jkt 211001
ACNW&M Ad Hoc Subcommittee
Meetings
NUCLEAR REGULATORY
COMMISSION
In accordance with the revised FACA,
the agency is no longer required to
apply the FACA requirements to
meetings conducted by the
Subcommittees of the NRC Advisory
Committees, if the Subcommittee(s
recommendations would be
independently reviewed by its parent
Committee.
The ACNW&M, however, chose to
conduct its Subcommittee meetings in
accordance with the procedures noted
above for ACNW&M Full Committee
meetings, as appropriate, to facilitate
public participation, and to provide a
forum for stakeholders to express their
views on regulatory matters being
considered by the ACNW&M. When
Subcommittee meetings are held at
locations other than at NRC facilities,
reproduction facilities may not be
available at a reasonable cost.
Accordingly, 50 copies of the materials
to be used during the meeting should be
provided for distribution at such
meetings.
Advisory Committee on Reactor
Safeguards (ACRS); Subcommittee
Meeting on Power Uprates
(Susquehanna); Notice of Meeting
If it is necessary to hold closed
sessions for the purpose of discussing
matters involving proprietary
information, persons with agreements
permitting access to such information
may attend those portions of the
ACNW&M meetings where this material
is being discussed upon confirmation
that such agreements are effective and
related to the material being discussed.
The DFO should be informed of such
an agreement at least 5 working days
prior to the meeting so that it can be
confirmed, and a determination can be
made regarding the applicability of the
agreement to the material that will be
discussed during the meeting. The
minimum information provided should
include information regarding the date
of the agreement, the scope of material
included in the agreement, the project
or projects involved, and the names and
titles of the persons signing the
agreement. Additional information may
be requested to identify the specific
agreement involved. A copy of the
executed agreement should be provided
to the DFO prior to the beginning of the
meeting for admittance to the closed
session.
The ACRS Subcommittee on Power
Uprates will hold a meeting on October
9–10, 2007, at 11545 Rockville Pike,
Rockville, Maryland, Room T–2B3.
The entire meeting will be open to
public attendance, with the exception of
portions that may be closed to discuss
proprietary information pursuant to 5
U.S.C. 552b(c)4 for presentations
covering information that is proprietary
to PPL Susquehanna LLC or its
contractors such as General Electric,
AREVA and Continuum Dynamics, Inc.
The agenda for the subject meeting
shall be as follows:
Tuesday, October 9, 2007—8:30 a.m.
until the conclusion of business.
Wednesday, October 10, 2007—8:30
a.m. until the conclusion of business.
The Subcommittee will discuss the
Susquehanna Steam Electric Station
Units 1 and 2 extended power uprate
application. The Subcommittee will
hear presentations by and hold
discussions with representatives of the
NRC staff, the PPL Susquehanna LLC
(the licensee, PPL), their contractors
(General Electric, AREVA and
Continuum Dynamics) and other
interested persons regarding this matter.
The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Officer, Ms. Zena Abdullahi
(Telephone: 301–415–8716) 5 days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
8:45 a.m. and 5:30 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes to the agenda.
Dated: September 20, 2007.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. E7–19013 Filed 9–25–07; 8:45 am]
Dated: September 19, 2007.
Cayetano Santos,
Chief, Reactor Safety Branch, ACRS.
[FR Doc. E7–18980 Filed 9–25–07; 8:45 am]
BILLING CODE 7590–01–P
BILLING CODE 7590–01–P
Special Provisions When Proprietary
Sessions Are To Be Held
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 72, Number 186 (Wednesday, September 26, 2007)]
[Notices]
[Page 54694]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-18980]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS); Subcommittee
Meeting on Power Uprates (Susquehanna); Notice of Meeting
The ACRS Subcommittee on Power Uprates will hold a meeting on
October 9-10, 2007, at 11545 Rockville Pike, Rockville, Maryland, Room
T-2B3.
The entire meeting will be open to public attendance, with the
exception of portions that may be closed to discuss proprietary
information pursuant to 5 U.S.C. 552b(c)4 for presentations covering
information that is proprietary to PPL Susquehanna LLC or its
contractors such as General Electric, AREVA and Continuum Dynamics,
Inc.
The agenda for the subject meeting shall be as follows:
Tuesday, October 9, 2007--8:30 a.m. until the conclusion of
business.
Wednesday, October 10, 2007--8:30 a.m. until the conclusion of
business.
The Subcommittee will discuss the Susquehanna Steam Electric
Station Units 1 and 2 extended power uprate application. The
Subcommittee will hear presentations by and hold discussions with
representatives of the NRC staff, the PPL Susquehanna LLC (the
licensee, PPL), their contractors (General Electric, AREVA and
Continuum Dynamics) and other interested persons regarding this matter.
The Subcommittee will gather information, analyze relevant issues and
facts, and formulate proposed positions and actions, as appropriate,
for deliberation by the full Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Officer, Ms. Zena
Abdullahi (Telephone: 301-415-8716) 5 days prior to the meeting, if
possible, so that appropriate arrangements can be made. Electronic
recordings will be permitted only during those portions of the meeting
that are open to the public.
Further information regarding this meeting can be obtained by
contacting the Designated Federal Official between 8:45 a.m. and 5:30
p.m. (ET). Persons planning to attend this meeting are urged to contact
the above named individual at least two working days prior to the
meeting to be advised of any potential changes to the agenda.
Dated: September 19, 2007.
Cayetano Santos,
Chief, Reactor Safety Branch, ACRS.
[FR Doc. E7-18980 Filed 9-25-07; 8:45 am]
BILLING CODE 7590-01-P