American Electric Power Service Corporation v. Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, L.L.C.; Midwest Independent Transmission System Operator, Inc.; Midwest Independent Transmission System Operator, Inc., PJM Interconnection, L.L.C., et al., 54649-54650 [E7-18910]

Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 72, No. 186 / Wednesday, September 26, 2007 / Notices a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. VerDate Aug<31>2005 17:57 Sep 25, 2007 Jkt 211001 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: October 4, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–18985 Filed 9–25–07; 8:45 am] BILLING CODE 6717–01–P 54649 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 12, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–18905 Filed 9–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. TS04–286–003] Exelon Corporation; Notice of Filing September 19, 2007. Take notice that on September 12, 2007, Exelon Corporation, on behalf of its subsidiary, Commonwealth energy Company, filed a request for limited expansion of scope of an existing Standards of Conduct waiver relating to provider-of-last resort service as a result of new legislation by the State of Illinois. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 [Docket Nos. EL07–101–000; ER05–6–100;. EL04–135–003; EL02–111–120; EL02–111– 120; EL03–212–116] American Electric Power Service Corporation v. Midwest Independent Transmission System Operator, Inc., and PJM Interconnection, L.L.C.; Midwest Independent Transmission System Operator, Inc.; Midwest Independent Transmission System Operator, Inc., PJM Interconnection, L.L.C., et al.; Midwest Independent Transmission System Operator, Inc., PJM Interconnection, L.L.C., et al.; Ameren Services Company, et al.; Notice of Complaint September 19, 2007. Take notice that on September 17, 2007, American Electric Power Service Corporation on behalf of Appalachian Power Company, Columbus Southern Power Company, Indiana Michigan Power Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company and Wheeling Power Company (collectively, AEP), pursuant to Rule 206 of the Rules of Practice and Procedure and sections 206 and 306 of the Federal Power Act, filed a Complaint and Motion to Consolidate against Midwest Independent Transmission System Operator, Inc. (Midwest ISO) and PJM Interconnection, L.L.C. (PJM), alleging that the rate designs underlying their open access transmission tariffs are unjust, unreasonable, and unduly discriminatory and therefore must be revised. AEP requests that the Commission establish a refund-effective E:\FR\FM\26SEN1.SGM 26SEN1 54650 Federal Register / Vol. 72, No. 186 / Wednesday, September 26, 2007 / Notices date of October 1, 2007, with respect to the necessary revisions. AEP states that copies of the Complaint were served upon the contacts for Midwest ISO and PJM as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 9, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–18910 Filed 9–25–07; 8:45 am] mstockstill on PROD1PC66 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 17:57 Sep 25, 2007 Jkt 211001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 9, 2007. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–102–000] Montgomery Great Falls Energy Partners LP, Complainant v. NorthWestern Corporation, d/b/a NorthWestern Energy, Respondent; Notice of Complaint September 19, 2007. Take notice that on September 17, 2007, Montgomery Great Falls Energy Partners LP (Montgomery Great Falls) filed a Complaint against NorthWestern Corporation, d/b/a NorthWestern Energy (NorthWestern) requesting that the Commission issue an order granting relief for the failure of NorthWestern to adhere to the tariff standards with regard to the management of its generator interconnection queue. Montgomery Great Falls certifies that copies of the complaint were served on the contacts for NorthWestern as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Kimberly D. Bose, Secretary. [FR Doc. E7–18909 Filed 9–25–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12470–001] City of Broken Bow, Oklahoma; Notice Soliciting Comments and Final Terms and Conditions, Recommendations, and Prescriptions September 19, 2007. Take notice that the following hydroelectric application and applicantprepared environmental assessment have been filed with the Commission and are available for public inspection. a. Type of Application: Original Major License. b. Project No.: 12470–001. c. Date filed: July 26, 2006. d. Applicant: City of Broken Bow, Oklahoma. e. Name of Project: Broken Bow ReRegulation Dam Hydropower Project. f. Location: On the Mountain Fork River in McCurtain County, Oklahoma. The project would be located at the United States Army Corps of Engineers’ (Corps) Broken Bow Re-Regulation Dam and would occupy lands administered by the Corps. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)—825(r). h. Applicant Contact: Olen Hill, City Manager, City of Broken Bow, Oklahoma, 210 North Broadway, Broken Bow, Oklahoma 74728; (405) 584–2282. i. FERC Contact: Peter Leitzke at (202) 502–6059, or peter.leitzke@ferc.gov. j. Deadline for filing comments, and final terms and conditions, recommendations, and prescriptions: 60 days from the issuance of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor E:\FR\FM\26SEN1.SGM 26SEN1

Agencies

[Federal Register Volume 72, Number 186 (Wednesday, September 26, 2007)]
[Notices]
[Pages 54649-54650]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-18910]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EL07-101-000; ER05-6-100;. EL04-135-003; EL02-111-120; 
EL02-111-120; EL03-212-116]


American Electric Power Service Corporation v. Midwest 
Independent Transmission System Operator, Inc., and PJM 
Interconnection, L.L.C.; Midwest Independent Transmission System 
Operator, Inc.; Midwest Independent Transmission System Operator, Inc., 
PJM Interconnection, L.L.C., et al.; Midwest Independent Transmission 
System Operator, Inc., PJM Interconnection, L.L.C., et al.; Ameren 
Services Company, et al.; Notice of Complaint

September 19, 2007.
    Take notice that on September 17, 2007, American Electric Power 
Service Corporation on behalf of Appalachian Power Company, Columbus 
Southern Power Company, Indiana Michigan Power Company, Kentucky Power 
Company, Kingsport Power Company, Ohio Power Company and Wheeling Power 
Company (collectively, AEP), pursuant to Rule 206 of the Rules of 
Practice and Procedure and sections 206 and 306 of the Federal Power 
Act, filed a Complaint and Motion to Consolidate against Midwest 
Independent Transmission System Operator, Inc. (Midwest ISO) and PJM 
Interconnection, L.L.C. (PJM), alleging that the rate designs 
underlying their open access transmission tariffs are unjust, 
unreasonable, and unduly discriminatory and therefore must be revised. 
AEP requests that the Commission establish a refund-effective

[[Page 54650]]

date of October 1, 2007, with respect to the necessary revisions.
    AEP states that copies of the Complaint were served upon the 
contacts for Midwest ISO and PJM as listed on the Commission's list of 
Corporate Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible online at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on October 9, 2007.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-18910 Filed 9-25-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.