Environmental Impacts Statements; Notice of Availability, 54038 [E7-18720]

Download as PDF 54038 Federal Register / Vol. 72, No. 183 / Friday, September 21, 2007 / Notices wetlands and forested habitat, and requested additional information and mitigation measures. EPA also suggested that Low Impact Development and energy efficiency practices be incorporated into the design of the proposed action. Rating EC2. Final EISs EIS No. 20070334, ERP No. F–AFS– J65360–CO, Lizard Head Road Easement, Application from Private Landowners Requesting a Permit to Cross Public Lands to Access NonFederal Lands, San Juan National Forest, Dolores Ranger District, Dolores County, CO. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070337, ERP No. F–TVA– E39069–AL, Bear Creek Dam Leakage Resolution Project, To Modify Dam and Maintain Summer Pool Level of 576 Feet, Bear Creek Dam, Franklin County, AL. Summary: EPA continues to have environmental concern about wetland impacts, and requested that appropriate buffers be established at highly erodible areas along the new shoreline to filter runoff into the reservoir until wetlands are re-established. EIS No. 20070340, ERP No. F–FRC– G03034–00, Southeast Expansion Project, Construction and Operation of 110.8 miles for Natural Gas Pipeline and Associated Ancillary Facilities, TX and LA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070350, ERP No. F–NPS– D61059–PA, Valley Forge National Historical Park, General Management Plan, Implementation, King of Prussia, PA. Summary: EPA does not object to the proposed project. EIS No. 20070301, ERP No. LD–COE– G39050–LA, Mississippi River—Gulf Outlet (MRGO) Deep-Draft Navigation De-Authorization Study, Implementation, St. Bernard Parish, LA. mstockstill on PROD1PC66 with NOTICES Summary: EPA does not object to the preferred alternative. Rating LO. Dated: September 17, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 07–4699 Filed 9–20–07; 8:45 am] BILLING CODE 6560–50–M VerDate Aug<31>2005 18:17 Sep 20, 2007 Jkt 211001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6691–2] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 09/10/2007 through 09/14/2007. Pursuant to 40 CFR 1506.9. EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and Improve to the I–94/1–69 Corridor, To Provide Safe, Efficient and Secure Movement of People and Goods across the Canadian—US Border, Port Huron Area, St. Clair County, MI. Comment Period Ends: 11/05/2007. Contact: Ryan Rizzo, (517) 702–1833. EIS No. 20070389, Final EIS, FHW, CA, Interstate 5 (Santa Ana Freeway) Project, Improvement from State Route 91 in Orange County to Interstate 605 in Los Angeles County, CA. Wait Period Ends: 10/22/2007. Contact: Steve Healow, (916) 498– 5849. EIS No. 20070390, Draft Supplement, AFS, ID, Meadow Face Stewardship Pilot Project, Improvement to Aquatic and Terrestrial Vegetative Conditions, Supplement Information on the Cumulative Effects Analysis, Nez Perce National Forest, Clearwater Ranger District, Idaho County, ID. Comment Period Ends: 11/05/2007. Contact: Darcy Pederson (208) 983– 1950. EIS No. 20070391, Draft EIS, NRC, OK, Sequoyah Fuels Corporation Site, Proposed Reclamation Activities for the 243-hectare (600 acre) Site, (NUREG–1888) in Gore, OK, Comment Period Ends: 11/05/2007. Contact: Allen H. Fetter, (301) 415– 8556. EIS No. 20070392, Draft EIS, AFS, MT, Bozeman Municipal Watershed Project, To Implement Fuel Reduction Activities, Bozeman Ranger District, Gallatin National Forest, City of Bozeman Municipal Watershed, Gallatin County, MT. Comment Period Ends: 11/05/2007. Contact: Jim Devitt, (406) 587–6749. EIS No. 20070393, Draft Supplement, AFS, MT, Fishtrap Project, Updated Information on Past Maintence/ Restorative Treatments within Old Growth Stands, Timber Harvest, Prescribed Burning, Road Construction and Other Restoration Activities, Lolo National Forest, PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 Plains/Thompson Falls Ranger District, Sanders County, MT. Comment Period Ends: 11/05/2007. Contact: Pat Partyka, (406) 826–4314. EIS No. 20070394, Final EIS, COE, FL, Central and Southern Florida Project, Comprehensive Everglades Restoration Plan, Caloosahatchee River (C–43) West Basin Storage Reservoir Project, Restoration of the Ecosystem in Caloosahatchee Estuary, Lake Okeechobee, FL, Wait Period Ends: 10/22/2007. Contact: Susan Conner, (904) 232–1782. EIS No. 20070395, Final EIS, USA, MD, Fort George G. Meade Base Realignment and Closure 2005 and Enhanced Use Lease (EUL) Actions, Implementation, Anne Arundel, Howard, Montgomery, Prince George’s Counties, MD. Wait Period Ends: 10/22/2007. Contact: Bob Ross, (703) 602–2878. Dated: September 18, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–18720 Filed 9–20–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2007–0960; FRL–8150–5] Pesticide Worker Protection; Notice of Public Meeting Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: EPA’s Office of Pesticide Programs will host two public meetings regarding pesticide worker protection issues in October. A Pesticide Worker Safety and Health Conference will be held on October 2–4, 2007, in Arlington, VA, at the Hilton Hotel in Crystal City. The conference will provide an informational forum for federal and state agencies and private sector organizations involved in pesticide worker safety and health programs, policies and research initiatives. The conference will also highlight the accomplishments of the Agency’s worker protection initiatives in partnership with our grantees. On the afternoon of October 4, 2007, the Office of Pesticide Programs will host a Diagnostic Tools Workshop in Arlington, VA, at the Hilton Hotel in Crystal City. Because health care providers lack tests to identify specific chemicals and/or levels of exposure that may be linked to the reported illnesses, the goal of this Workshop is to gather E:\FR\FM\21SEN1.SGM 21SEN1

Agencies

[Federal Register Volume 72, Number 183 (Friday, September 21, 2007)]
[Notices]
[Page 54038]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-18720]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6691-2]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 09/10/2007 
through 09/14/2007. Pursuant to 40 CFR 1506.9.
EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and 
Improve to the I-94/1-69 Corridor, To Provide Safe, Efficient and 
Secure Movement of People and Goods across the Canadian--US Border, 
Port Huron Area, St. Clair County, MI. Comment Period Ends: 11/05/2007. 
Contact: Ryan Rizzo, (517) 702-1833.
EIS No. 20070389, Final EIS, FHW, CA, Interstate 5 (Santa Ana Freeway) 
Project, Improvement from State Route 91 in Orange County to Interstate 
605 in Los Angeles County, CA. Wait Period Ends: 10/22/2007. Contact: 
Steve Healow, (916) 498-5849.
EIS No. 20070390, Draft Supplement, AFS, ID, Meadow Face Stewardship 
Pilot Project, Improvement to Aquatic and Terrestrial Vegetative 
Conditions, Supplement Information on the Cumulative Effects Analysis, 
Nez Perce National Forest, Clearwater Ranger District, Idaho County, 
ID. Comment Period Ends: 11/05/2007. Contact: Darcy Pederson (208) 983-
1950.
EIS No. 20070391, Draft EIS, NRC, OK, Sequoyah Fuels Corporation Site, 
Proposed Reclamation Activities for the 243-hectare (600 acre) Site, 
(NUREG-1888) in Gore, OK, Comment Period Ends: 11/05/2007. Contact: 
Allen H. Fetter, (301) 415-8556.
EIS No. 20070392, Draft EIS, AFS, MT, Bozeman Municipal Watershed 
Project, To Implement Fuel Reduction Activities, Bozeman Ranger 
District, Gallatin National Forest, City of Bozeman Municipal 
Watershed, Gallatin County, MT. Comment Period Ends: 11/05/2007. 
Contact: Jim Devitt, (406) 587-6749.
EIS No. 20070393, Draft Supplement, AFS, MT, Fishtrap Project, Updated 
Information on Past Maintence/Restorative Treatments within Old Growth 
Stands, Timber Harvest, Prescribed Burning, Road Construction and Other 
Restoration Activities, Lolo National Forest, Plains/Thompson Falls 
Ranger District, Sanders County, MT. Comment Period Ends: 11/05/2007. 
Contact: Pat Partyka, (406) 826-4314.
EIS No. 20070394, Final EIS, COE, FL, Central and Southern Florida 
Project, Comprehensive Everglades Restoration Plan, Caloosahatchee 
River (C-43) West Basin Storage Reservoir Project, Restoration of the 
Ecosystem in Caloosahatchee Estuary, Lake Okeechobee, FL, Wait Period 
Ends: 10/22/2007. Contact: Susan Conner, (904) 232-1782.
EIS No. 20070395, Final EIS, USA, MD, Fort George G. Meade Base 
Realignment and Closure 2005 and Enhanced Use Lease (EUL) Actions, 
Implementation, Anne Arundel, Howard, Montgomery, Prince George's 
Counties, MD. Wait Period Ends: 10/22/2007. Contact: Bob Ross, (703) 
602-2878.

    Dated: September 18, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-18720 Filed 9-20-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.