Environmental Impacts Statements; Notice of Availability, 54038 [E7-18720]
Download as PDF
54038
Federal Register / Vol. 72, No. 183 / Friday, September 21, 2007 / Notices
wetlands and forested habitat, and
requested additional information and
mitigation measures. EPA also suggested
that Low Impact Development and
energy efficiency practices be
incorporated into the design of the
proposed action. Rating EC2.
Final EISs
EIS No. 20070334, ERP No. F–AFS–
J65360–CO, Lizard Head Road
Easement, Application from Private
Landowners Requesting a Permit to
Cross Public Lands to Access NonFederal Lands, San Juan National
Forest, Dolores Ranger District,
Dolores County, CO.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070337, ERP No. F–TVA–
E39069–AL, Bear Creek Dam Leakage
Resolution Project, To Modify Dam
and Maintain Summer Pool Level of
576 Feet, Bear Creek Dam, Franklin
County, AL.
Summary: EPA continues to have
environmental concern about wetland
impacts, and requested that appropriate
buffers be established at highly erodible
areas along the new shoreline to filter
runoff into the reservoir until wetlands
are re-established.
EIS No. 20070340, ERP No. F–FRC–
G03034–00, Southeast Expansion
Project, Construction and Operation
of 110.8 miles for Natural Gas
Pipeline and Associated Ancillary
Facilities, TX and LA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070350, ERP No. F–NPS–
D61059–PA, Valley Forge National
Historical Park, General Management
Plan, Implementation, King of
Prussia, PA.
Summary: EPA does not object to the
proposed project.
EIS No. 20070301, ERP No. LD–COE–
G39050–LA, Mississippi River—Gulf
Outlet (MRGO) Deep-Draft Navigation
De-Authorization Study,
Implementation, St. Bernard Parish,
LA.
mstockstill on PROD1PC66 with NOTICES
Summary: EPA does not object to the
preferred alternative. Rating LO.
Dated: September 17, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 07–4699 Filed 9–20–07; 8:45 am]
BILLING CODE 6560–50–M
VerDate Aug<31>2005
18:17 Sep 20, 2007
Jkt 211001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6691–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 09/10/2007 through
09/14/2007. Pursuant to 40 CFR
1506.9.
EIS No. 20070388, Draft EIS, FHW, MI,
Blue Water Bridge Plaza Study and
Improve to the I–94/1–69 Corridor, To
Provide Safe, Efficient and Secure
Movement of People and Goods
across the Canadian—US Border, Port
Huron Area, St. Clair County, MI.
Comment Period Ends: 11/05/2007.
Contact: Ryan Rizzo, (517) 702–1833.
EIS No. 20070389, Final EIS, FHW, CA,
Interstate 5 (Santa Ana Freeway)
Project, Improvement from State
Route 91 in Orange County to
Interstate 605 in Los Angeles County,
CA. Wait Period Ends: 10/22/2007.
Contact: Steve Healow, (916) 498–
5849.
EIS No. 20070390, Draft Supplement,
AFS, ID, Meadow Face Stewardship
Pilot Project, Improvement to Aquatic
and Terrestrial Vegetative Conditions,
Supplement Information on the
Cumulative Effects Analysis, Nez
Perce National Forest, Clearwater
Ranger District, Idaho County, ID.
Comment Period Ends: 11/05/2007.
Contact: Darcy Pederson (208) 983–
1950.
EIS No. 20070391, Draft EIS, NRC, OK,
Sequoyah Fuels Corporation Site,
Proposed Reclamation Activities for
the 243-hectare (600 acre) Site,
(NUREG–1888) in Gore, OK,
Comment Period Ends: 11/05/2007.
Contact: Allen H. Fetter, (301) 415–
8556.
EIS No. 20070392, Draft EIS, AFS, MT,
Bozeman Municipal Watershed
Project, To Implement Fuel Reduction
Activities, Bozeman Ranger District,
Gallatin National Forest, City of
Bozeman Municipal Watershed,
Gallatin County, MT. Comment
Period Ends: 11/05/2007. Contact: Jim
Devitt, (406) 587–6749.
EIS No. 20070393, Draft Supplement,
AFS, MT, Fishtrap Project, Updated
Information on Past Maintence/
Restorative Treatments within Old
Growth Stands, Timber Harvest,
Prescribed Burning, Road
Construction and Other Restoration
Activities, Lolo National Forest,
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
Plains/Thompson Falls Ranger
District, Sanders County, MT.
Comment Period Ends: 11/05/2007.
Contact: Pat Partyka, (406) 826–4314.
EIS No. 20070394, Final EIS, COE, FL,
Central and Southern Florida Project,
Comprehensive Everglades
Restoration Plan, Caloosahatchee
River (C–43) West Basin Storage
Reservoir Project, Restoration of the
Ecosystem in Caloosahatchee Estuary,
Lake Okeechobee, FL, Wait Period
Ends: 10/22/2007. Contact: Susan
Conner, (904) 232–1782.
EIS No. 20070395, Final EIS, USA, MD,
Fort George G. Meade Base
Realignment and Closure 2005 and
Enhanced Use Lease (EUL) Actions,
Implementation, Anne Arundel,
Howard, Montgomery, Prince
George’s Counties, MD. Wait Period
Ends: 10/22/2007. Contact: Bob Ross,
(703) 602–2878.
Dated: September 18, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–18720 Filed 9–20–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2007–0960; FRL–8150–5]
Pesticide Worker Protection; Notice of
Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: EPA’s Office of Pesticide
Programs will host two public meetings
regarding pesticide worker protection
issues in October. A Pesticide Worker
Safety and Health Conference will be
held on October 2–4, 2007, in Arlington,
VA, at the Hilton Hotel in Crystal City.
The conference will provide an
informational forum for federal and
state agencies and private sector
organizations involved in pesticide
worker safety and health programs,
policies and research initiatives. The
conference will also highlight the
accomplishments of the Agency’s
worker protection initiatives in
partnership with our grantees. On the
afternoon of October 4, 2007, the Office
of Pesticide Programs will host a
Diagnostic Tools Workshop in
Arlington, VA, at the Hilton Hotel in
Crystal City. Because health care
providers lack tests to identify specific
chemicals and/or levels of exposure that
may be linked to the reported illnesses,
the goal of this Workshop is to gather
E:\FR\FM\21SEN1.SGM
21SEN1
Agencies
[Federal Register Volume 72, Number 183 (Friday, September 21, 2007)]
[Notices]
[Page 54038]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-18720]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6691-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 09/10/2007
through 09/14/2007. Pursuant to 40 CFR 1506.9.
EIS No. 20070388, Draft EIS, FHW, MI, Blue Water Bridge Plaza Study and
Improve to the I-94/1-69 Corridor, To Provide Safe, Efficient and
Secure Movement of People and Goods across the Canadian--US Border,
Port Huron Area, St. Clair County, MI. Comment Period Ends: 11/05/2007.
Contact: Ryan Rizzo, (517) 702-1833.
EIS No. 20070389, Final EIS, FHW, CA, Interstate 5 (Santa Ana Freeway)
Project, Improvement from State Route 91 in Orange County to Interstate
605 in Los Angeles County, CA. Wait Period Ends: 10/22/2007. Contact:
Steve Healow, (916) 498-5849.
EIS No. 20070390, Draft Supplement, AFS, ID, Meadow Face Stewardship
Pilot Project, Improvement to Aquatic and Terrestrial Vegetative
Conditions, Supplement Information on the Cumulative Effects Analysis,
Nez Perce National Forest, Clearwater Ranger District, Idaho County,
ID. Comment Period Ends: 11/05/2007. Contact: Darcy Pederson (208) 983-
1950.
EIS No. 20070391, Draft EIS, NRC, OK, Sequoyah Fuels Corporation Site,
Proposed Reclamation Activities for the 243-hectare (600 acre) Site,
(NUREG-1888) in Gore, OK, Comment Period Ends: 11/05/2007. Contact:
Allen H. Fetter, (301) 415-8556.
EIS No. 20070392, Draft EIS, AFS, MT, Bozeman Municipal Watershed
Project, To Implement Fuel Reduction Activities, Bozeman Ranger
District, Gallatin National Forest, City of Bozeman Municipal
Watershed, Gallatin County, MT. Comment Period Ends: 11/05/2007.
Contact: Jim Devitt, (406) 587-6749.
EIS No. 20070393, Draft Supplement, AFS, MT, Fishtrap Project, Updated
Information on Past Maintence/Restorative Treatments within Old Growth
Stands, Timber Harvest, Prescribed Burning, Road Construction and Other
Restoration Activities, Lolo National Forest, Plains/Thompson Falls
Ranger District, Sanders County, MT. Comment Period Ends: 11/05/2007.
Contact: Pat Partyka, (406) 826-4314.
EIS No. 20070394, Final EIS, COE, FL, Central and Southern Florida
Project, Comprehensive Everglades Restoration Plan, Caloosahatchee
River (C-43) West Basin Storage Reservoir Project, Restoration of the
Ecosystem in Caloosahatchee Estuary, Lake Okeechobee, FL, Wait Period
Ends: 10/22/2007. Contact: Susan Conner, (904) 232-1782.
EIS No. 20070395, Final EIS, USA, MD, Fort George G. Meade Base
Realignment and Closure 2005 and Enhanced Use Lease (EUL) Actions,
Implementation, Anne Arundel, Howard, Montgomery, Prince George's
Counties, MD. Wait Period Ends: 10/22/2007. Contact: Bob Ross, (703)
602-2878.
Dated: September 18, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-18720 Filed 9-20-07; 8:45 am]
BILLING CODE 6560-50-P