Environmental Impacts Statements; Notice of Availability, 52557-52558 [E7-18188]
Download as PDF
Federal Register / Vol. 72, No. 178 / Friday, September 14, 2007 / Notices
Section of BPA’s Libby to Bonner
Ferry 115-kilovolt Transmission Line
Project, Rebuilding Transmission Line
between Libby and Troy, Lincoln
County, MT.
Summary: EPA expressed
environmental concerns about impacts
to water quality, wetlands and the avian
community. EPA requested additional
information to fully assess and mitigate
all potential impacts of the proposed
actions. Rating EC2.
rmajette on PROD1PC64 with NOTICES
EIS No. 20070308, ERP No. D–AFS–
J65489–MT, Marten Creek Project,
Proposed Timber Harvest, Prescribed
Fire Burning, Watershed Restoration,
and Associated Activities, Cabinet
Ranger District, Kootenai National
Forest, Sanders County, MT.
Summary: EPA expressed
environmental concerns about impacts
to water quality and habitat quality, and
recommended additional information to
assess and mitigate impacts of the
proposed management actions. Rating
EC2.
EIS No. 20070267, ERP No. DA–COE–
E39051–FL, Lake Okeechobee
Regulation Schedule Study, New
Updated Information, Evaluation of
Three New Alternatives on
Operational Changes to the Current
Water Control Plan, Lake Okeechobee
and the Everglades Agricultural Area,
Lake Okeechobee, Glades,
Okeechobee Hendry, Palm Beach and
Martin Counties, FL.
Summary: EPA continues to have
environmental concerns about water
flow impacts on the lower river and
estuaries from lake flow releases. Rating
EC1.
EIS No. 20070276, ERP No. DS–COE–
E32061–MS, Pascagoula Harbor
Navigation Channel Project, To
Construct Congressionally Authorized
Widening and Deepening
Improvements, to update the FEIS–
1985, Jackson County, MS.
Summary: EPA expressed
environmental concerns about the
potential impacts and requested
additional information. EPA’s
comments included a request that every
effort be made to minimize impacts to
submerged aquatic vegetation and that
the Corps explore opportunities for
beneficial uses of the dredged material.
EPA also requested that a detailed
sediment evaluation and testing report
be submitted to ensure that the disposal
material meets the Ocean Dumping
Criteria under the Marine Research and
Sanctuaries Protection Act’s ocean
dumping criteria. Rating EC2.
VerDate Aug<31>2005
15:44 Sep 13, 2007
Jkt 211001
Final EISs
EIS No. 20070263, ERP No. F–AFS–
J65376–SD, Mitchell Project Area, To
Implement Multiple Resource
Management Actions, Mystic Ranger
District, Black Hills National Forest,
Pennington County, SD.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed action.
EIS No. 20070309, ERP No. F–FRC–
L05239–00, Spokane River and Post
Falls Hydroelectric Project,
Applications for two New Licenses for
Existing 14.75 (mw) Post Falls No.
12606 and 122.9 (mw) Spokane River
No. 2545, Kootenai and Benewah
Counties, ID and Spokane, Lincoln
and Stevens Counties, WA.
Summary: EPA continues to have
environmental concerns about the
project’s potential impacts to water
quality. EPA recommended that the
Record Of Decision for the project
include updated information about
Clean Water Act Section 401 water
quality certification process, as well as
assurances that the project plans would
be adjusted to meet water quality
standards in Idaho and Washington
during project implementation.
EIS No. 20070319, ERP No. F–USN–
E11061–FL, Boca Chica Field,
Restoration of Clear Zones and
Stormwater Drainage Systems,
Implementation, Naval Air Station
(NAS) Key West, Monroe County, FL.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed action.
EIS No. 20070320, ERP No. F–WPA–
K05063–AZ, San Luis Rio Colorado
Project, Proposes to Construct a 26Mile Long 230 Kilovolt Double-Circuit
Transmission Line from the
International Border with Mexico to
Western and Arizona Public Service
Substations near Yuma County, AZ.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070321, ERP No. F–NOA–
E91018–00, Amendment 27 to the
Reef Fish Fishery Management Plan
and Amendment 14 to the Shrimp
Fishery Management Plan, To
Address Stock Rebuilding and
Overfishing of Red Snapper, Gulf of
Mexico.
Summary: EPA has no objection to the
proposed action.
Dated: September 11, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–18182 Filed 9–13–07; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
52557
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6690–9]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 09/03/2007 Through
09/07/2007 Pursuant to 40 CFR
1506.9.
EIS No. 20070379, Final EIS, AFS, AK,
Baht Timber Sale Project, Proposes to
Harvest Timber and Temporary Road
Construction on Zarembo Island,
Wrangell Ranger District, Tongass
National Forest, AK. Wait Period
Ends: 10/15/2007. Contact: Frank
Roberts 907–874–7556.
EIS No. 20070380, Final EIS, AFS, NV,
White Pine & Grant-Quinn Oil and
Gas Leasing Project, Exploration and
Development, Humboldt-Toiyabe
National Forest, Ely Ranger District,
White Pine, Nye and Lincoln
Counties, NV. Wait Period Ends: 10/
15/2007. Contact: Pat Irwin 775–289–
3031.
EIS No. 20070381, Final EIS, AFS, AK,
Kenai Winter Access Project, Develop
a Winter Access Management Plan for
2006/2007 Winter Season,
Implementation, Seward Ranger
District, Chugach National Forest,
Located on the Kenai Peninsula in
Southcentral, AK. Wait Period Ends:
10/15/2007. Contact: Sharon Randell
907–743–9497.
EIS No. 20070382, Final EIS, AFS, SD,
Citadel Project Area, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
Ranger District, Black Hills National
Forest, Lawrence County, SD. Wait
Period Ends: 10/15/2007. Contact:
Chris Stores 605–642–4622.
EIS No. 20070383, Second Draft
Supplement, BLM, UT, Price Field
Resource Management Plan,
Supplemental Information for NonWilderness Study Area (WSA) Lands
with Wilderness Characteristics.
Implementation, Carbon and Emery
Counties, UT. Comment Period Ends:
12/12/2007. Contact: Floyd Johnson
435–636–3600.
EIS No. 20070384, Final Supplement,
FHW, GA, US 411 Connector, From
US411/GA–20 Interchange with US41
to US 411 Interchange with I–75,
Updated Information, Funding and
US Army COE Section 404 Permit,
Bartow County, GA. Wait Period
Ends: 10/15/2007. Contact: Jennifer
Giersch 404–373–1680. EIS No.
E:\FR\FM\14SEN1.SGM
14SEN1
52558
Federal Register / Vol. 72, No. 178 / Friday, September 14, 2007 / Notices
20070385, Draft EIS, FHW, 00, Peace
Bridge Expansion Project, Capacity
Improvement to the Peace Bridge,
Plazas and Connecting Roadways,
U.S. Coast Guard Bridge Permit, U.S.
Army COE section 10 and 404
Permits. City of Buffalo, Erie County,
NY and Town of Fort Erie, Ontario,
Canada, Comment Period Ends: 10/
29/2007. Contact: Amy Jackson-Grove
518–431–4131.
EIS No. 20070386, Draft EIS, NRC, GA,
Vogtle Electric Generating Plant Site,
Issuance of an Early Site Permit (ESP)
for Construction and Operation of a
New Nuclear Power Generating
Facility, NUREG–1872, Burke County,
GA, Comment Period Ends: 11/28/
2007. Contact: Mark D. Notich 301–
415–3053.
EIS No. 20070387, Final EIS, AFS, CA,
Little Doe and Low Gulch Timber Sale
Project, Proposes to Harvest
Commercial Timber, Six Rivers
National Forest, Mad River Ranger
District, Trinity County, CA. Wait
Period Ends: 10/15/2007. Contact:
Ruben Escatell 707–574–6233.
Amended Notices
EIS No. 20070278, Draft EIS, FHW, CA,
Tier 1—Placer Parkway Corridor
Preservation Project, Select and
Preserve a Corridor for the Future
Construction from CA–70/99 to CA
65, Placer and Sutter Counties, CA,
Comment Period Ends: 09/25/2007.
Contact: Cesar Perez 916–498–5065.
Revision of FR Notice Published 07/
06/2007. Extending Comment Period
from 09/10/2007 to 09/25/2007.
Dated: September 11, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–18188 Filed 9–13–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8468–6]
State Innovation Grant Program,
Preliminary Notice and Request for
Input on the Development of a
Solicitation for Proposals for 2008
Awards
Environmental Protection
Agency (EPA).
ACTION: Notice.
rmajette on PROD1PC64 with NOTICES
AGENCY:
SUMMARY: The U.S. Environmental
Protection Agency (EPA or Agency),
National Center for Environmental
Innovation (NCEI) is giving preliminary
notice of its intention to solicit pre-
VerDate Aug<31>2005
15:44 Sep 13, 2007
Jkt 211001
proposals for a 2008 grant program to
support innovation by state
environmental agencies—the ‘‘State
Innovation Grant Program.’’ The Agency
is also seeking input from state
environmental regulatory agencies on
the topic areas for the solicitation. In
addition, EPA is asking each state
environmental regulatory agency to
designate a point of contact (in addition
to the Commissioner or Cabinet
Secretary level) who will be the point of
contact for further communication about
the upcoming solicitation. If your point
of contact from previous State
Innovation Grant solicitations is to be
your contact for this year’s competition,
there is no need to send that
information again, as all previously
designated points of contact will remain
on our notification list for this year’s
competition. EPA anticipates
publication of a Solicitation
Announcement of Federal Funding
Opportunity on the Federal
government’s grants opportunities Web
site (https://www.grants.gov) to announce
the availability of the next solicitation
within 45 days.
DATES: State environmental regulatory
agencies will have 30 days from the date
of this pre-announcement notice in the
Federal Register publication until
October 15, 2007 to respond with: (1)
Suggestions for specific topics that
should be included under the general
subject area of ‘‘Innovation in
Environmental Permitting Programs’’
(e.g., topics with 1–2 paragraphs
description) for the next solicitation;
and (2) point of contact information for
the person within the state
environmental regulatory agency (in
addition to Commissioner or Cabinet
Secretaries) who will be designated to
receive future notices about the State
Innovation Grant competition. We will
automatically transmit notice of
availability of the solicitation to people
in state agencies identified for previous
solicitations.
ADDRESSES: We encourage e-mail
responses. Information should be
submitted in writing via: e-mail to:
innovation_state_grants@epa.gov;
regular mail (see below); or fax to ‘‘State
Innovation Grant Program’’ at (202)
566–2220. If you have questions about
responding to this notice, please contact
EPA at this e-mail address or fax
number, or you may call Sherri Walker
at (202) 566–2186. For regular mail send
to Sherri Walker, U.S. Environmental
Protection Agency (1807T), State
Innovation Grant Program; National
Center for Environmental Innovation;
Office of Policy, Economics, and
Innovation; 1200 Pennsylvania Avenue,
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
NW., Washington, DC 20460. Comments
sent by regular or overnight mail must
be received prior to close of business on
October 15, 2007. Please be advised that
mail sent via regular postal service may
be delayed due to additional security
screening requirements. For overnight
delivery, send to Sherri Walker, U.S.
Environmental Protection Agency
(1807T), State Innovation Grant
Program; 1301 Constitution Avenue,
NW., EPA West, Room 4214 D,
Washington, DC 20004.
EPA will acknowledge all responses it
receives to this notice. If you have not
received an acknowledgment from EPA
within three (3) days of the end of the
notice period, please send an e-mail to:
innovation_state_grants@epa.gov or call
Sherri Walker at (202) 566–2186. Failure
to do so may result in your information
or comments not being received by the
deadline. EPA will respond to all
questions in writing, and all questions
and responses will be posted on the
EPA State Innovation Grant Web site at
https://www.epa.gov/innovation/
stategrants. State agencies are advised to
monitor this Web site for information
posted in response to questions received
prior to and during the competition
period.
SUPPLEMENTARY INFORMATION:
Background
In April 2002, EPA issued its plan for
future innovation efforts, published as
Innovating for Better Environmental
Results: A Strategy to Guide the Next
Generation of Innovation at EPA (EPA
100–R–02–002); (https://www.epa.gov/
innovation/pdf/strategy.pdf). EPA’s
Innovation Strategy presents a
framework for environmental
innovation consisting of four major
elements:
1. Strengthening EPA’s innovation
partnership with states and tribes;
2. Focusing on priority environmental
issues;
3. Diversifying environmental
protection tools and approaches; and
4. Fostering more ‘‘innovationfriendly’’ systems and organizational
cultures.
The State Innovation Grant Program
strengthens EPA’s partnership with the
states by supporting state innovation
compatible with EPA’s Innovation
Strategy. EPA wants to encourage states
to build on previous experience (theirs
and others) to undertake strategic
innovation projects that promote largerscale models for ‘‘next generation’’
environmental protection that promise
better environmental outcomes and
other beneficial results. EPA is
interested in funding projects that: (i)
E:\FR\FM\14SEN1.SGM
14SEN1
Agencies
[Federal Register Volume 72, Number 178 (Friday, September 14, 2007)]
[Notices]
[Pages 52557-52558]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-18188]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6690-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 09/03/2007
Through 09/07/2007 Pursuant to 40 CFR 1506.9.
EIS No. 20070379, Final EIS, AFS, AK, Baht Timber Sale Project,
Proposes to Harvest Timber and Temporary Road Construction on Zarembo
Island, Wrangell Ranger District, Tongass National Forest, AK. Wait
Period Ends: 10/15/2007. Contact: Frank Roberts 907-874-7556.
EIS No. 20070380, Final EIS, AFS, NV, White Pine & Grant-Quinn Oil and
Gas Leasing Project, Exploration and Development, Humboldt-Toiyabe
National Forest, Ely Ranger District, White Pine, Nye and Lincoln
Counties, NV. Wait Period Ends: 10/15/2007. Contact: Pat Irwin 775-289-
3031.
EIS No. 20070381, Final EIS, AFS, AK, Kenai Winter Access Project,
Develop a Winter Access Management Plan for 2006/2007 Winter Season,
Implementation, Seward Ranger District, Chugach National Forest,
Located on the Kenai Peninsula in Southcentral, AK. Wait Period Ends:
10/15/2007. Contact: Sharon Randell 907-743-9497.
EIS No. 20070382, Final EIS, AFS, SD, Citadel Project Area, Proposes to
Implement Multiple Resource Management Actions, Northern Hills Ranger
District, Black Hills National Forest, Lawrence County, SD. Wait Period
Ends: 10/15/2007. Contact: Chris Stores 605-642-4622.
EIS No. 20070383, Second Draft Supplement, BLM, UT, Price Field
Resource Management Plan, Supplemental Information for Non-Wilderness
Study Area (WSA) Lands with Wilderness Characteristics. Implementation,
Carbon and Emery Counties, UT. Comment Period Ends: 12/12/2007.
Contact: Floyd Johnson 435-636-3600.
EIS No. 20070384, Final Supplement, FHW, GA, US 411 Connector, From
US411/GA-20 Interchange with US41 to US 411 Interchange with I-75,
Updated Information, Funding and US Army COE Section 404 Permit, Bartow
County, GA. Wait Period Ends: 10/15/2007. Contact: Jennifer Giersch
404-373-1680. EIS No.
[[Page 52558]]
20070385, Draft EIS, FHW, 00, Peace Bridge Expansion Project, Capacity
Improvement to the Peace Bridge, Plazas and Connecting Roadways, U.S.
Coast Guard Bridge Permit, U.S. Army COE section 10 and 404 Permits.
City of Buffalo, Erie County, NY and Town of Fort Erie, Ontario,
Canada, Comment Period Ends: 10/29/2007. Contact: Amy Jackson-Grove
518-431-4131.
EIS No. 20070386, Draft EIS, NRC, GA, Vogtle Electric Generating Plant
Site, Issuance of an Early Site Permit (ESP) for Construction and
Operation of a New Nuclear Power Generating Facility, NUREG-1872, Burke
County, GA, Comment Period Ends: 11/28/2007. Contact: Mark D. Notich
301-415-3053.
EIS No. 20070387, Final EIS, AFS, CA, Little Doe and Low Gulch Timber
Sale Project, Proposes to Harvest Commercial Timber, Six Rivers
National Forest, Mad River Ranger District, Trinity County, CA. Wait
Period Ends: 10/15/2007. Contact: Ruben Escatell 707-574-6233.
Amended Notices
EIS No. 20070278, Draft EIS, FHW, CA, Tier 1--Placer Parkway Corridor
Preservation Project, Select and Preserve a Corridor for the Future
Construction from CA-70/99 to CA 65, Placer and Sutter Counties, CA,
Comment Period Ends: 09/25/2007. Contact: Cesar Perez 916-498-5065.
Revision of FR Notice Published 07/06/2007. Extending Comment Period
from 09/10/2007 to 09/25/2007.
Dated: September 11, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-18188 Filed 9-13-07; 8:45 am]