Federal Register / Vol. 72, No. 176 / Wednesday, September 12, 2007 / Notices
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Ridge Crest.
On September 6, 2001, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
Ridge Crest, should file a protest with
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is September
20, 2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Ridge Crest is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Ridge
Crest, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Ridge Crest’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17966 Filed 9–11–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:43 Sep 11, 2007
Jkt 211001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–94–000]
Montana Consumer Counsel,
Complainant, v. PPL Montana, LLC,
PPL Energy Plus, LLC, PPL Colstrip I,
LLC, PPL Colstrip II, LLC,
Respondent.; Notice of Complaint
September 6, 2007.
Take notice that on September 5,
2007, the Montanan Consumer Counsel
(Montana Consumer), filed a complaint
against PPL Montana LLC, PPL Energy
Plus, LLC, PPL Colstrip I, LLC, and PPL
Colstrip II, LLC (collectively, PPL-M),
pursuant to Federal Power Act (FPA)
section 206. The Complaint states in
part:
Because PPL–M has market power and its
rates reflect that fact, the Montana Consumer
requests that the Commission institute an
investigation into the justness and
reasonableness of PPL–M’s rates and set a
refund effective date for those rates. The
refund effective date should be the earliest
permissible under the FPA section 206(b), 16
U.S.C. 824e(b). Montana Consumer
recognizes that the Commission has ruled
that PPL–M is entitled to market rate
authority. Montana Consumer files this
complaint as a protective matter so that if the
Court of Appeals reverses the Commission’s
orders, the consumers of Montana will be
protected against unnecessary impediments
to the granting of effective relief.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
52097
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on October 5, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17967 Filed 9–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
September 6, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER03–1207–005.
Applicants: AES Delano, Inc.
Description: AES Delano, Inc.’s Notice
of Change in Status.
Filed Date: 08/16/2007.
Accession Number: 20070816–5011.
Comment Date: 5 p.m. Eastern Time
on Thursday, September 13, 2007.
Docket Numbers: ER07–1221–001.
Applicants: Rensselaer Cogeneration
LLC.
Description: Rensselaer Cogeneration
LLC submits its triennial updated
market power analysis.
Filed Date: 09/04/2007.
Accession Number: 20070906–0057.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 25, 2007.
Docket Numbers: ER07–1293–001.
Applicants: Upper Peninsula Power
Company.
Description: Upper Peninsula Power
Company submits an executed version
of the Short-Term Sales Agreement with
the Escanaba Municipal Utility for the
sales of short-term capacity and energy
etc.
Filed Date: 08/31/2007.
Accession Number: 20070905–0021.
Comment Date: 5 p.m. Eastern Time
on Friday, September 21, 2007.
Docket Numbers: ER07–1305–001.
Applicants: Port Washington
Generating Station LLC.
Description: Port Washington
Generating Station, LLC submits the
executed Power Purchase Agreement
Providing for Sales of Test Power with
Wisconsin Electric Power Co.
E:\FR\FM\12SEN1.SGM
12SEN1
jlentini on PROD1PC65 with NOTICES
52098
Federal Register / Vol. 72, No. 176 / Wednesday, September 12, 2007 / Notices
Filed Date: 09/04/2007.
Accession Number: 20070905–0065.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 25, 2007.
Docket Numbers: ER07–1331–000.
Applicants: Indianapolis Power &
Light Company.
Description: Indianapolis Power &
Light Co., submits a letter agreement
with Wabash Valley Power Association,
Inc., re an extension of Rate Schedule
FERC 21.
Filed Date: 09/04/2007.
Accession Number: 20070905–0069.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 25, 2007.
Docket Numbers: ER07–1332–000.
Applicants: Smoky Hills Wind Farm,
LLC.
Description: Smoky Hills Wind Farm,
LLC submits an application for order
accepting market-based rate tariff,
granting waivers and blanket authority.
Filed Date: 09/04/2007.
Accession Number: 20070905–0070.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 25, 2007.
Docket Numbers: ER07–1333–000.
Applicants: New England Power
Company.
Description: New England Power Co.,
submits an amended Large Generator
Interconnection Agreement with
Dominion Energy Salem Harbor, LLC.
Filed Date: 08/31/2007.
Accession Number: 20070905–0071.
Comment Date: 5 p.m. Eastern Time
on Friday, September 21, 2007.
Docket Numbers: ER07–1338–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc., et
al. submits revisions to the Forward
Capacity Market rules conditionally
accepted by FERC on 4/16/07.
Filed Date: 08/31/2007.
Accession Number: 20070905–0074.
Comment Date: 5 p.m. Eastern Time
on Friday, September 21, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
VerDate Aug<31>2005
18:43 Sep 11, 2007
Jkt 211001
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Acting Deputy Secretary.
[FR Doc. E7–17946 Filed 9–11–07; 8:45 am]
BILLING CODE 6717–01–P
is located at mile marker 3.5 of the
Osage Arm of the Lake of the Ozarks, at
the mouth of Jackson Branch Cove. The
Osage Project is located in Benton,
Camden, Miller, and Morgan Counties,
Missouri.
In the application, Union Electric
Company, dba AmerenUE requests
Commission approval to authorize
Atlantis Island LLC to construct 17
docks with 374 slips at the Atlantis
Island condominiums. The EA contains
Commission staff’s analysis of the
probable environmental impacts of the
proposal and concludes that approving
the licensee’s application, with staff’s
recommended environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
The EA is attached to a Commission
order titled ‘‘Order Modifying and
Approving Non-Project Use of Project
Lands and Waters,’’ which was issued
August 23, 2007, and is available for
review and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the project
number (prefaced by P-) and excluding
the last three digits, in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17923 Filed 9–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 459–176]
Federal Energy Regulatory
Commission
Union Electric Company, dba
AmerenUE; Notice of Availability of
Environmental Assessment
August 31, 2007.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application for
non-project use of project lands and
waters at the Osage Project (FERC No.
459) and has prepared an
Environmental Assessment (EA) for the
proposed non-project use. The nonproject use of project lands and waters
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
[Project No. 1971–079 Idaho/Oregon]
Idaho Power Company; Notice of
Availability of the Final Environmental
Impact Statement for the Hells Canyon
Project
August 31, 2007.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 F.R. 47897), the Office of Energy
Projects has reviewed the application
for license for the Hells Canyon Project
(FERC No. 1971), located on the Snake
River in Washington and Adams
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 72, Number 176 (Wednesday, September 12, 2007)]
[Notices]
[Pages 52097-52098]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17946]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
September 6, 2007.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER03-1207-005.
Applicants: AES Delano, Inc.
Description: AES Delano, Inc.'s Notice of Change in Status.
Filed Date: 08/16/2007.
Accession Number: 20070816-5011.
Comment Date: 5 p.m. Eastern Time on Thursday, September 13, 2007.
Docket Numbers: ER07-1221-001.
Applicants: Rensselaer Cogeneration LLC.
Description: Rensselaer Cogeneration LLC submits its triennial
updated market power analysis.
Filed Date: 09/04/2007.
Accession Number: 20070906-0057.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 25, 2007.
Docket Numbers: ER07-1293-001.
Applicants: Upper Peninsula Power Company.
Description: Upper Peninsula Power Company submits an executed
version of the Short-Term Sales Agreement with the Escanaba Municipal
Utility for the sales of short-term capacity and energy etc.
Filed Date: 08/31/2007.
Accession Number: 20070905-0021.
Comment Date: 5 p.m. Eastern Time on Friday, September 21, 2007.
Docket Numbers: ER07-1305-001.
Applicants: Port Washington Generating Station LLC.
Description: Port Washington Generating Station, LLC submits the
executed Power Purchase Agreement Providing for Sales of Test Power
with Wisconsin Electric Power Co.
[[Page 52098]]
Filed Date: 09/04/2007.
Accession Number: 20070905-0065.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 25, 2007.
Docket Numbers: ER07-1331-000.
Applicants: Indianapolis Power & Light Company.
Description: Indianapolis Power & Light Co., submits a letter
agreement with Wabash Valley Power Association, Inc., re an extension
of Rate Schedule FERC 21.
Filed Date: 09/04/2007.
Accession Number: 20070905-0069.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 25, 2007.
Docket Numbers: ER07-1332-000.
Applicants: Smoky Hills Wind Farm, LLC.
Description: Smoky Hills Wind Farm, LLC submits an application for
order accepting market-based rate tariff, granting waivers and blanket
authority.
Filed Date: 09/04/2007.
Accession Number: 20070905-0070.
Comment Date: 5 p.m. Eastern Time on Tuesday, September 25, 2007.
Docket Numbers: ER07-1333-000.
Applicants: New England Power Company.
Description: New England Power Co., submits an amended Large
Generator Interconnection Agreement with Dominion Energy Salem Harbor,
LLC.
Filed Date: 08/31/2007.
Accession Number: 20070905-0071.
Comment Date: 5 p.m. Eastern Time on Friday, September 21, 2007.
Docket Numbers: ER07-1338-000.
Applicants: ISO New England Inc.
Description: ISO New England Inc., et al. submits revisions to the
Forward Capacity Market rules conditionally accepted by FERC on 4/16/
07.
Filed Date: 08/31/2007.
Accession Number: 20070905-0074.
Comment Date: 5 p.m. Eastern Time on Friday, September 21, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Acting Deputy Secretary.
[FR Doc. E7-17946 Filed 9-11-07; 8:45 am]