Harvest Windfarm, LLC; Notice of Issuance of Order, 51811-51812 [E7-17854]

Download as PDF sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 175 / Tuesday, September 11, 2007 / Notices With respect to KAMS, the Board proposed that fire protection systems be installed and that unnecessary combustibles be eliminated. In response to this proposal, the Department determined that fire suppression equipment would be installed in the Neutron Multiplicity Counting Room of KAMS, fire detection equipment would be installed throughout KAMS, and the cable combustible load in the actuator tower above KAMS would be removed. DOE completed removal of the actuator tower cables in August 2006. DOE plans to begin installation of a fire detection system in KAMS in 2007 and complete it in 2008. DOE also plans to begin installation of a fire suppression system in the Neutron Multiplicity Counting Room in 2008 and complete the installation in 2009. In addition, the fire protection posture designed into KAMS was to minimize both transient and fixed combustibles within the facility such that the remaining worst possible fire could not cause a release of plutonium. The walls separating the KAMS facility from the remainder of the K-Reactor building were fabricated into a two-hour fire boundary. Combustibles outside the facility fire boundaries were minimized, contained, or mitigated to ensure the KAMS facility fire boundaries were rated longer than any credible fire would burn. Supplement Analysis Conclusion And Determination: DOE has fully evaluated transportation of surplus, non-pit plutonium materials for SRS and storage at SRS of such materials from Hanford and LANL in the Storage and Disposition PEIS and SPD EIS. The action announced today, consolidated storage of surplus, non-pit plutonium materials at SRS, including transportation of the materials to SRS, is addressed in the Storage and Disposition PEIS, the SPD EIS, and other NEPA reviews addressed above. DOE evaluated the potential impacts of conducting plutonium surveillance and stabilization activities required by DOE– STD–3013 in the Environmental Assessment for the Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site, and found the impacts to be insignificant. Some of these documents are now 10 or more years old. However, DOE has reviewed the analyses and assumptions relevant to the potential environmental impacts of the actions described herein and found any changes to be insignificant. DOE’s 2007 SA shows that the potential environmental impacts associated with the further consolidation of surplus non-pit, VerDate Aug<31>2005 17:06 Sep 10, 2007 Jkt 211001 weapons-usable plutonium from Hanford, LLNL and LANL would not be a significant change from the potential environmental impacts associated with the alternatives analyzed in previous NEPA reviews. DOE is not proposing a substantial change that is relevant to environmental concerns. No significant new circumstances or information bearing on the proposed action and relevant to environmental concerns are presented by the proposed consolidation of plutonium storage. Therefore, DOE does not need to conduct additional NEPA review prior to transferring surplus non-pit plutonium materials from Hanford, LLNL, and LANL to SRS for consolidated storage pending disposition, as described above. Issued in Washington, DC, this 5th day of September, 2007. James A. Rispoli, Assistant Secretary for Environmental Management. [FR Doc. E7–17840 Filed 9–10–07; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER07–1222–000; Docket No. ER07–1223–000] CR Clearing, LLC; Cow Branch Wind Power, LLC; Notice of Issuance of Order September 4, 2007. CR Clearing, LLC and Cow Branch Wind Power, LLC (collectively, ‘‘the Applicants’’) filed applications for market-based rate authority, with accompanying market-based rate tariffs. The proposed market-based rate tariffs provide for the sale of energy and capacity at market-based rates. The Applicants also requested waivers of various Commission regulations. In particular, the Applicants requested that the Commission grant blanket approvals under 18 CFR part 34 of all future issuances of securities and assumptions of liability by the Applicants. On August 31, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development-West, granted the requests for blanket approval under part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 51811 the Applicants, should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is October 1, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, the Applicants are authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of the Applicants, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of the Applicants’ issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–17855 Filed 9–10–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER07–1246–000] Harvest Windfarm, LLC; Notice of Issuance of Order September 4, 2007. Harvest Windfarm, LLC (Harvest) filed an application for market-based rate authority, with an accompanying tariff. The proposed market-based rate tariff provides for the sale of energy and E:\FR\FM\11SEN1.SGM 11SEN1 sroberts on PROD1PC70 with NOTICES 51812 Federal Register / Vol. 72, No. 175 / Tuesday, September 11, 2007 / Notices capacity at market-based rates. Harvest also requested waivers of various Commission regulations. In particular, Harvest requested that the Commission grant blanket approval under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by Harvest. On August 31, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development-West, granted the requests for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by Harvest, should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is October 1, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, Harvest is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Harvest, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Harvest’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the VerDate Aug<31>2005 17:06 Sep 10, 2007 Jkt 211001 ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–17854 Filed 9–10–07; 8:45 am] BILLING CODE 6717–01–P (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 21, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17852 Filed 9–10–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RR07–16–000] North American Electric, Reliability Corporation; Notice of Amendment to the File September 4, 2007. Take notice that on August 31, 2007, the North American Electric Reliability Corporation submitted an amendment to their August 24, 2007 filing of the 2008 Business Plans and Budgets of Regional Entities, and the 2008 funding request of the Western Interconnection Regional Advisory Body. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 [Docket No. DI07–12–000] Ken Howard; Notice of Petition for Declaratory Order and Soliciting Comments, Motions to Intervene, and Protests September 4, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Petition for Declaratory Order. b. Docket No.: DI07–12–000. c. Date Filed: August 15, 2007. d. Applicant: Ken Howard. e. Name of Project: Keene Channel/ Howard Micro-Hydro Project. f. Location: The Keene Channel/ Howard Micro-Hydro Project is located on an unnamed stream on Kupreanof Island, near Petersburg, Alaska, affecting T. 6 S., R. 80 E., sec. 6, Copper River Meridian. The project does not occupy any tribal or federal lands. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Ken Howard, P.O. Box 2067, Petersburg, Alaska, 99833; Telephone: (907) 518–1886; e-mail: howardak@starband.net. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton (202) 502–8768, or E-mail: henry.ecton@ferc.gov. j. Deadline for filing comments and/or motions: October 4, 2007. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at: https:// www.ferc.gov. Please include the docket number (DI07–12–000) on any protests, comments and/or motions filed. E:\FR\FM\11SEN1.SGM 11SEN1

Agencies

[Federal Register Volume 72, Number 175 (Tuesday, September 11, 2007)]
[Notices]
[Pages 51811-51812]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17854]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER07-1246-000]


Harvest Windfarm, LLC; Notice of Issuance of Order

September 4, 2007.
    Harvest Windfarm, LLC (Harvest) filed an application for market-
based rate authority, with an accompanying tariff. The proposed market-
based rate tariff provides for the sale of energy and

[[Page 51812]]

capacity at market-based rates. Harvest also requested waivers of 
various Commission regulations. In particular, Harvest requested that 
the Commission grant blanket approval under 18 CFR Part 34 of all 
future issuances of securities and assumptions of liability by Harvest.
    On August 31, 2007, pursuant to delegated authority, the Director, 
Division of Tariffs and Market Development-West, granted the requests 
for blanket approval under Part 34 (Director's Order). The Director's 
Order also stated that the Commission would publish a separate notice 
in the Federal Register establishing a period of time for the filing of 
protests. Accordingly, any person desiring to be heard concerning the 
blanket approvals of issuances of securities or assumptions of 
liability by Harvest, should file a protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
accordance with Rules 211 and 214 of the Commission's Rules of Practice 
and Procedure. 18 CFR 385.211, 385.214 (2004).
    Notice is hereby given that the deadline for filing protests is 
October 1, 2007.
    Absent a request to be heard in opposition to such blanket 
approvals by the deadline above, Harvest is authorized to issue 
securities and assume obligations or liabilities as a guarantor, 
indorser, surety, or otherwise in respect of any security of another 
person; provided that such issuance or assumption is for some lawful 
object within the corporate purposes of Harvest, compatible with the 
public interest, and is reasonably necessary or appropriate for such 
purposes.
    The Commission reserves the right to require a further showing that 
neither public nor private interests will be adversely affected by 
continued approvals of Harvest's issuance of securities or assumptions 
of liability.
    Copies of the full text of the Director's Order are available from 
the Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426. The Order may also be viewed on the Commission's 
web site at https://www.ferc.gov, using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
filed to access the document. Comments, protests, and interventions may 
be filed electronically via the internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-17854 Filed 9-10-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.