Dominion Transmission, Inc.; Notice of Intent to Prepare an Environmental Assessment for the Proposed Storage Factory Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings and Site Visit, 51431-51433 [E7-17664]

Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices Filed Date: 08/28/2007. Accession Number: 20070829–0188. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: RP07–620–000. Applicants: TransColorado Gas Transmission Company. Description: TransColorado Gas Transmission Co. submits Seventh Revised Sheet 20 to its FERC Gas Tariff, First Revised Volume 1 under RP07– 620. Filed Date: 08/28/2007. Accession Number: 20070829–0185. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: RP07–621–000. Applicants: Discovery Gas Transmission LLC. Description: Discovery Gas Transmission LLC submits Twelfth Revised Sheet 20 to FERC Gas Tariff, Original Volume 1, effective 10/1/07 pursuant to Order 472 under RP07–621. Filed Date: 08/28/2007. Accession Number: 20070829–0190. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: RP07–622–000. Applicants: Black Marlin Pipeline Company. Description: Black Marlin Pipeline Company’s CD containing Statement of Rates—Sixteenth Revised Sheet 4 to FERC Gas Tariff, Original Volume 1, effective 10/1/07 under RP07–622. Filed Date: 08/28/2007. Accession Number: 20070828–4006. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: RP99–301–162. Applicants: ANR Pipeline Company. Description: ANR Pipeline Co submits an amendment to Rate Schedule FTS–1 negotiated rate agreement with Integrys Energy Services, Inc under RP99–301. Filed Date: 08/28/2007. Accession Number: 20070829–0186. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr. Acting Deputy Secretary. [FR Doc. E7–17694 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF07–12–000] Dominion Transmission, Inc.; Notice of Intent to Prepare an Environmental Assessment for the Proposed Storage Factory Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings and Site Visit August 29, 2007. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Storage Factory Project, involving construction and operation of facilities by Dominion Transmission, Inc. (Dominion) in Clinton, Elk, and Tioga Counties, Pennsylvania. The EA will be used by the Commission in its decisionmaking process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping period that will be used to PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 51431 gather environmental input from the public and interested agencies on the project. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on September 28, 2007. Comments may be submitted in written or verbal form. Further details on how to submit written comments are provided in the Public Participation section of this notice. In lieu of sending written comments, you may choose to attend the public scoping meeting scheduled as follows: Date and time Location Tuesday, September 18, 2007 7 p.m. to 9 p.m. (EDT). Lawrenceville Fire Department, 9–11 Mechanic St., Lawrenceville, PA 16901. Telephone: (570) 827–2047. This notice is being sent to affected landowners; federal, state, and local government representatives and agencies; environmental and public interest groups; Native American tribes; other interested parties in this proceeding; and local libraries and newspapers. We 1 encourage government representatives to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a Dominion representative about the acquisition of an easement to construct, operate, and maintain the proposed project facilities. The pipeline company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, Dominion could initiate condemnation proceedings in accordance with state law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility on My Land? What Do I Need to Know?’’ addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https:// www.ferc.gov). Summary of the Proposed Project The Storage Factory Project would involve the leaching of two salt caverns 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Office of Energy Projects (OEP), part of the Commission staff. E:\FR\FM\07SEN1.SGM 07SEN1 51432 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices and placing the first cavern in service by 2014. The project consists of constructing leaching/pumping facilities, a brine processing facility, water and brine pipelines, and a new compressor station for gas storage injection/withdrawal purposes in Tioga County. Dominion is also proposing on-system enhancements to other existing facilities in Pennsylvania, including piping upgrades to the Sabinsville Storage Pool. Proposed modifications to transmission related facilities include additional compression at Dominion’s existing Ardell Station (approximately 4,000 horsepower located in Elk County, Pennsylvania) and approximately 7.5 miles of new 30-inch-diameter pipeline looping in Clinton County. The Storage Factory Project is in the preliminary design state. Dominion anticipates filing an application with the FERC in March 2008 and to seek the Commission’s approval in time for Dominion to begin construction by March 2009, with a proposed in-service date of January 2014. Project location maps are included in Appendix A.2 Land Requirements for Construction mstockstill on PROD1PC66 with NOTICES The Storage Factory Project is in the preliminary planning stage. The precise facility design, pipeline route, rights-ofway, and other details have not yet been finalized. Specific information on the proposed project location and the land used by it will be made available to the public when it is finalized. Construction of the proposed project would affect a total of about 250.7 acres during construction. Following construction, about 160 acres would be allowed to revert to its previous conditions. Disturbance associated with aboveground facilities would permanently impact 51.2 acres of land. Dominion proposes to construct its pipeline in Clinton County and the pipelines associated with the Sabinsville Storage Pool in existing rights-of-way. Dominion has indicated that it would seek 100-foot-wide construction right-of-way for the pipelines associated with the leaching and gas storage areas. 2 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices, other than Appendix A (maps), are available on the Commission’s Web site at the ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary refer to the ‘‘Additional Information’’ section of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. Requests for detailed maps of the proposed facilities should be made directly to Dominion. VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 The EA Process For this project, the FERC staff has initiated its National Environmental Policy Act (NEPA) review prior to receiving the application. The purpose of the Commission’s Pre-Filing Process is to involve interested stakeholders early in project planning and to identify and resolve issues before an application is filed with the FERC. A docket number (PF07–12–000) has been established to place information filed by Dominion, and related documents issued by the Commission, into the public record. Once a formal application is filed with the FERC, a new docket number will be established. The FERC will be the lead federal agency for the preparation of the EA which will satisfy the requirements of NEPA. The NEPA requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, we are requesting public comments on the scope of the issues that should be addressed in the EA. We will consider all comments received during scoping in the preparation of the EA. Our independent analysis and evaluation of the issues will be included in the EA. The EA will also include possible alternatives to the proposed project or portions of the project, and we will make recommendations on how to lessen or avoid impacts on the various resource areas of concern. Depending on the comments received during the scoping process, the EA may be published and mailed to federal, state, and local agencies; elected officials; environmental and public interest groups; other interested parties; affected landowners; Native American tribes; libraries, and newspapers; and the Commission’s official service list for this proceeding. A 30-day comment period will be allotted for review of the EA. We will consider all comments submitted on the EA in any Commission Order that is issued for the project. We are currently involved in discussions with other jurisdictional agencies to identify their issues and concerns. These agencies include the U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, U.S. EPA Region III Groundwater and Enforcement Branch, Susquehanna River Basin PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Commission, and the Pennsylvania Department of Environmental Protection. By this notice, we are asking these and other federal, state, and local agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. Agencies that would like to request cooperating status should follow the instructions for filing comments provided below. Currently Identified Environmental Issues The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project. We have already identified several issues that we think deserve attention based on a preliminary review of the project site and the facility information provided by Iroquois. This preliminary list of issues and potential impacts may change based on your comments and our analysis. • Impacts on perennial and intermittent streams and waterbodies. • Water withdrawals from Cowanesque Reservoir or other water source. • Evaluation of temporary and permanent impacts on wetlands and development of appropriate mitigation. • Effect on federally and state-listed species. • Impacts on existing land uses. • Visual effects of the aboveground facilities on surrounding areas. • Impacts on local air and noise quality associated with construction and operation. • Public safety and potential hazards associated with the transport of natural gas and the proposed compressor facilities. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. By becoming a commenter, your concerns will be addressed in the EA and considered by the Commission. Your comments should focus on the potential environmental effects of the proposal, reasonable alternatives to the proposal (including alternative locations and routes), and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory E:\FR\FM\07SEN1.SGM 07SEN1 mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices Commission, 888 First Street, NE., Room 1A, Washington, DC 20426. • Label one copy of the comments for the attention of Gas Branch 1; • Reference Docket No. PF07–12–000; • Mail your comments so that they will be received in Washington, DC on or before September 28, 2007. Please note that the Commission strongly encourages electronic filing of comments. See 18 Code of Federal Regulations (CFR) 385.2001(a)(1)(iii) and the instructions on the Commission’s Internet Web site at https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s Guide. Prepare your submission in the same manner as you would if filing on paper and save it to a file on your hard drive. Before you can file comments you will need to create an account by clicking on ‘‘Login to File’’ and then ‘‘New User Account.’’ You will be asked to select the type of filing you are making. This filing is considered a ‘‘Comment on Filing.’’ The public scoping meeting (date, time, and location is listed above) is designed to provide state and local agencies, interested groups, affected landowners, and the general public with another opportunity to offer your comments on the project. Interested groups and individuals are encouraged to attend the meetings and to present comments on the environmental issues they believe should be addressed in the EA. A transcript of each meeting will be made so that your comments will be accurately recorded. All public meetings will be posted on the Commission’s calendar located at https://www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. Once Dominion formally files its application with the Commission, you may want to become an official party to the proceeding known as an ‘‘intervenor.’’ Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in a Commission proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that you may not request intervenor status at this time. You must wait until a formal application is filed with the Commission. Site Visit On September 18, 2007, the OEP staff will conduct a pre-certification site visit of the proposed Storage Factory Project. VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 We will view Dominion’s proposed pipeline route, route variations, and aboveground facilities that are being considered for the proposed project. Staff will tour the proposed project area by automobile and on foot. Representatives of Dominion will accompany the OEP staff. All interested parties may attend the site visit. Those planning to attend must provide their own transportation. If you are interested in attending the site visit, please meet us at 1 p.m. in the parking lot of the Lawrenceville Fire Department at 9–11 Mechanic St., Lawrenceville, PA 16901. For additional information, please contact the Commission’s Office of External Affairs at 1–866–208–FERC (3372). Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. If you do not return the attached form (Appendix B), you will be removed from the Commission’s environmental mailing list. All individuals who provide written comments, attend the scoping meeting, or return the Information Request will remain on our environmental mailing list for this project. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs at 1–866–208 FERC (3372) or on the FERC Internet Web site (https:// www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., PF07–12), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at 1–866–208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Internet Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 51433 amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, Dominion has established an Internet Web site for this project at https://www.dom.com/about/gastransmission/storage/index.jsp. The Web site includes a project overview, status, and answers to frequently asked questions. You can also request additional information by calling Dominion at 1–880–882–5055. Kimberly D. Bose, Secretary. [FR Doc. E7–17664 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–430–000] Kinder Morgan Interstate Gas Transmission LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Colorado Lateral Expansion Project and Request for Comments on Environmental Issues August 29, 2007. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Colorado Lateral Expansion Project, involving construction and operation of natural gas facilities by Kinder Morgan Interstate Gas Transmission LLC (Kinder Morgan) in Weld County, Colorado. The EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping period that will be used to gather environmental input from the public and interested agencies on the project. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on October 1, 2007. Details on how to submit comments are provided in the Public Participation section of this notice. If you are a landowner receiving this notice, you may be contacted by a Kinder Morgan representative about the acquisition of an easement to construct, operate, and maintain the proposed project facilities. The pipeline company would seek to negotiate a mutually E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 72, Number 173 (Friday, September 7, 2007)]
[Notices]
[Pages 51431-51433]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17664]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. PF07-12-000]


Dominion Transmission, Inc.; Notice of Intent to Prepare an 
Environmental Assessment for the Proposed Storage Factory Project, 
Request for Comments on Environmental Issues, and Notice of Public 
Scoping Meetings and Site Visit

August 29, 2007.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Storage Factory Project, 
involving construction and operation of facilities by Dominion 
Transmission, Inc. (Dominion) in Clinton, Elk, and Tioga Counties, 
Pennsylvania. The EA will be used by the Commission in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping period that will 
be used to gather environmental input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine which issues need to be evaluated in the EA. Please note that 
the scoping period will close on September 28, 2007.
    Comments may be submitted in written or verbal form. Further 
details on how to submit written comments are provided in the Public 
Participation section of this notice. In lieu of sending written 
comments, you may choose to attend the public scoping meeting scheduled 
as follows:

------------------------------------------------------------------------
               Date and time                          Location
------------------------------------------------------------------------
Tuesday, September 18, 2007 7 p.m. to 9     Lawrenceville Fire
 p.m. (EDT).                                 Department, 9-11 Mechanic
                                             St., Lawrenceville, PA
                                             16901. Telephone: (570) 827-
                                             2047.
------------------------------------------------------------------------

    This notice is being sent to affected landowners; federal, state, 
and local government representatives and agencies; environmental and 
public interest groups; Native American tribes; other interested 
parties in this proceeding; and local libraries and newspapers. We \1\ 
encourage government representatives to notify their constituents of 
this planned project and encourage them to comment on their areas of 
concern.
---------------------------------------------------------------------------

    \1\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Office of Energy Projects (OEP), part of the Commission 
staff.
---------------------------------------------------------------------------

    If you are a landowner receiving this notice, you may be contacted 
by a Dominion representative about the acquisition of an easement to 
construct, operate, and maintain the proposed project facilities. The 
pipeline company would seek to negotiate a mutually acceptable 
agreement. However, if the project is approved by the Commission, that 
approval conveys with it the right of eminent domain. Therefore, if 
easement negotiations fail to produce an agreement, Dominion could 
initiate condemnation proceedings in accordance with state law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility on My Land? What Do I Need to Know?'' addresses a number 
of typically asked questions, including the use of eminent domain and 
how to participate in the Commission's proceedings. It is available for 
viewing on the FERC Internet Web site (https://www.ferc.gov).

Summary of the Proposed Project

    The Storage Factory Project would involve the leaching of two salt 
caverns

[[Page 51432]]

and placing the first cavern in service by 2014. The project consists 
of constructing leaching/pumping facilities, a brine processing 
facility, water and brine pipelines, and a new compressor station for 
gas storage injection/withdrawal purposes in Tioga County.
    Dominion is also proposing on-system enhancements to other existing 
facilities in Pennsylvania, including piping upgrades to the 
Sabinsville Storage Pool. Proposed modifications to transmission 
related facilities include additional compression at Dominion's 
existing Ardell Station (approximately 4,000 horsepower located in Elk 
County, Pennsylvania) and approximately 7.5 miles of new 30-inch-
diameter pipeline looping in Clinton County.
    The Storage Factory Project is in the preliminary design state. 
Dominion anticipates filing an application with the FERC in March 2008 
and to seek the Commission's approval in time for Dominion to begin 
construction by March 2009, with a proposed in-service date of January 
2014.
    Project location maps are included in Appendix A.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of all appendices, other 
than Appendix A (maps), are available on the Commission's Web site 
at the ``eLibrary'' link or from the Commission's Public Reference 
Room, 888 First Street, NE., Washington, DC 20426, or call (202) 
502-8371. For instructions on connecting to eLibrary refer to the 
``Additional Information'' section of this notice. Copies of the 
appendices were sent to all those receiving this notice in the mail. 
Requests for detailed maps of the proposed facilities should be made 
directly to Dominion.
---------------------------------------------------------------------------

Land Requirements for Construction

    The Storage Factory Project is in the preliminary planning stage. 
The precise facility design, pipeline route, rights-of-way, and other 
details have not yet been finalized. Specific information on the 
proposed project location and the land used by it will be made 
available to the public when it is finalized.
    Construction of the proposed project would affect a total of about 
250.7 acres during construction. Following construction, about 160 
acres would be allowed to revert to its previous conditions. 
Disturbance associated with aboveground facilities would permanently 
impact 51.2 acres of land.
    Dominion proposes to construct its pipeline in Clinton County and 
the pipelines associated with the Sabinsville Storage Pool in existing 
rights-of-way. Dominion has indicated that it would seek 100-foot-wide 
construction right-of-way for the pipelines associated with the 
leaching and gas storage areas.

The EA Process

    For this project, the FERC staff has initiated its National 
Environmental Policy Act (NEPA) review prior to receiving the 
application. The purpose of the Commission's Pre-Filing Process is to 
involve interested stakeholders early in project planning and to 
identify and resolve issues before an application is filed with the 
FERC. A docket number (PF07-12-000) has been established to place 
information filed by Dominion, and related documents issued by the 
Commission, into the public record. Once a formal application is filed 
with the FERC, a new docket number will be established. The FERC will 
be the lead federal agency for the preparation of the EA which will 
satisfy the requirements of NEPA.
    The NEPA requires the Commission to take into account the 
environmental impacts that could result from an action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires us to discover and address concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
Notice of Intent, we are requesting public comments on the scope of the 
issues that should be addressed in the EA. We will consider all 
comments received during scoping in the preparation of the EA.
    Our independent analysis and evaluation of the issues will be 
included in the EA. The EA will also include possible alternatives to 
the proposed project or portions of the project, and we will make 
recommendations on how to lessen or avoid impacts on the various 
resource areas of concern. Depending on the comments received during 
the scoping process, the EA may be published and mailed to federal, 
state, and local agencies; elected officials; environmental and public 
interest groups; other interested parties; affected landowners; Native 
American tribes; libraries, and newspapers; and the Commission's 
official service list for this proceeding. A 30-day comment period will 
be allotted for review of the EA. We will consider all comments 
submitted on the EA in any Commission Order that is issued for the 
project.
    We are currently involved in discussions with other jurisdictional 
agencies to identify their issues and concerns. These agencies include 
the U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, U.S. 
EPA Region III Groundwater and Enforcement Branch, Susquehanna River 
Basin Commission, and the Pennsylvania Department of Environmental 
Protection.
    By this notice, we are asking these and other federal, state, and 
local agencies with jurisdiction and/or special expertise with respect 
to environmental issues to formally cooperate with us in the 
preparation of the EA. Agencies that would like to request cooperating 
status should follow the instructions for filing comments provided 
below.

Currently Identified Environmental Issues

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project. We have already 
identified several issues that we think deserve attention based on a 
preliminary review of the project site and the facility information 
provided by Iroquois. This preliminary list of issues and potential 
impacts may change based on your comments and our analysis.
     Impacts on perennial and intermittent streams and 
waterbodies.
     Water withdrawals from Cowanesque Reservoir or other water 
source.
     Evaluation of temporary and permanent impacts on wetlands 
and development of appropriate mitigation.
     Effect on federally and state-listed species.
     Impacts on existing land uses.
     Visual effects of the aboveground facilities on 
surrounding areas.
     Impacts on local air and noise quality associated with 
construction and operation.
     Public safety and potential hazards associated with the 
transport of natural gas and the proposed compressor facilities.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. By becoming a commenter, your 
concerns will be addressed in the EA and considered by the Commission. 
Your comments should focus on the potential environmental effects of 
the proposal, reasonable alternatives to the proposal (including 
alternative locations and routes), and measures to avoid or lessen 
environmental impact. The more specific your comments, the more useful 
they will be. Please carefully follow these instructions to ensure that 
your comments are received in time and properly recorded:
     Send an original and two copies of your letter to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory

[[Page 51433]]

Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
     Label one copy of the comments for the attention of Gas 
Branch 1;
     Reference Docket No. PF07-12-000;
     Mail your comments so that they will be received in 
Washington, DC on or before September 28, 2007.
    Please note that the Commission strongly encourages electronic 
filing of comments. See 18 Code of Federal Regulations (CFR) 
385.2001(a)(1)(iii) and the instructions on the Commission's Internet 
Web site at https://www.ferc.gov under the ``eFiling'' link and the link 
to the User's Guide. Prepare your submission in the same manner as you 
would if filing on paper and save it to a file on your hard drive. 
Before you can file comments you will need to create an account by 
clicking on ``Login to File'' and then ``New User Account.'' You will 
be asked to select the type of filing you are making. This filing is 
considered a ``Comment on Filing.''
    The public scoping meeting (date, time, and location is listed 
above) is designed to provide state and local agencies, interested 
groups, affected landowners, and the general public with another 
opportunity to offer your comments on the project. Interested groups 
and individuals are encouraged to attend the meetings and to present 
comments on the environmental issues they believe should be addressed 
in the EA. A transcript of each meeting will be made so that your 
comments will be accurately recorded.
    All public meetings will be posted on the Commission's calendar 
located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with 
other related information.
    Once Dominion formally files its application with the Commission, 
you may want to become an official party to the proceeding known as an 
``intervenor.'' Intervenors play a more formal role in the process and 
are able to file briefs, appear at hearings, and be heard by the courts 
if they choose to appeal the Commission's final ruling. An intervenor 
formally participates in a Commission proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are included in the 
User's Guide under the ``e-filing'' link on the Commission's Web site. 
Please note that you may not request intervenor status at this time. 
You must wait until a formal application is filed with the Commission.

Site Visit

    On September 18, 2007, the OEP staff will conduct a pre-
certification site visit of the proposed Storage Factory Project. We 
will view Dominion's proposed pipeline route, route variations, and 
aboveground facilities that are being considered for the proposed 
project. Staff will tour the proposed project area by automobile and on 
foot. Representatives of Dominion will accompany the OEP staff.
    All interested parties may attend the site visit. Those planning to 
attend must provide their own transportation. If you are interested in 
attending the site visit, please meet us at 1 p.m. in the parking lot 
of the Lawrenceville Fire Department at 9-11 Mechanic St., 
Lawrenceville, PA 16901.
    For additional information, please contact the Commission's Office 
of External Affairs at 1-866-208-FERC (3372).

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within distances defined in the 
Commission's regulations of certain aboveground facilities. If you do 
not return the attached form (Appendix B), you will be removed from the 
Commission's environmental mailing list. All individuals who provide 
written comments, attend the scoping meeting, or return the Information 
Request will remain on our environmental mailing list for this project.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs at 1-866-208 FERC (3372) or on 
the FERC Internet Web site (https://www.ferc.gov). Using the 
``eLibrary'' link, select ``General Search'' from the eLibrary menu, 
enter the selected date range and ``Docket Number'' excluding the last 
three digits (i.e., PF07-12), and follow the instructions. For 
assistance with access to eLibrary, the helpline can be reached at 1-
866-208-3676, TTY (202) 502-8659, or at FERCOnlineSupport@ferc.gov. The 
eLibrary link on the FERC Internet Web site also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rule makings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, Dominion has established an Internet Web site for this 
project at https://www.dom.com/about/gas-transmission/storage/index.jsp. 
The Web site includes a project overview, status, and answers to 
frequently asked questions. You can also request additional information 
by calling Dominion at 1-880-882-5055.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-17664 Filed 9-6-07; 8:45 am]
BILLING CODE 6717-01-P