Egan Hub Storage, LLC; Notice of Proposed Changes in FERC Gas Tariff, 51424-51425 [E7-17660]

Download as PDF 51424 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 21, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17666 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Proposed Change in FERC Gas Tariff mstockstill on PROD1PC66 with NOTICES August 29, 2007. Dominion Cove Point LNG, LP (Docket No. RP07–613–000); Dominion Transmission, Inc. (Docket No. RP07– 614–000); KO Transmission Company (Docket No. RP07–612–000); MarkWest New Mexico, L.P. (Docket No. RP07– 611–000); NGO Transmission, Inc. (Docket No. RP07–609–000); Panther Interstate Pipeline Energy, LLC (Docket No. RP07–610–000); Transwestern Pipeline Corporation (Docket No. RP07–617–000); Vector Pipeline L.P. (Docket No. RP07–618–000) Take notice that the above-referenced pipelines tendered for filing their tariff sheets respectively, pursuant to section 154.402 of the Commission’s Regulations to reflect the Commission’s change in the unit rate for the Annual Charge Adjustment (ACA) surcharge to be applied to rates for recovery of 2007 Annual Charges pursuant to Order No. 472, in Docket no. RM87–3–000. The proposed effective date of the tariff sheets is October 1, 2007. The above-referenced pipelines states that the purpose of their filings is to reflect the revised ACA effective for the twelve-month period beginning October 1, 2007. The pipelines states that their tariff sheets reflect a increase of $.0003 per Dth from $.0016 per Dth in the ACA adjustment surcharge, resulting in a new ACA rate of $.0019 Dth as specified by the Commission in its invoice dated June 28, 2007 for the Annual Charge Billing—Fiscal Year 2007. VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. Any person desiring to become a party in any of the listed dockets must file a separate motion to intervene in each docket for which they wish party status. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time September 5, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17661 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–615–000] Egan Hub Storage, LLC; Notice of Proposed Changes in FERC Gas Tariff August 29, 2007. Take notice that on August 24, 2007, Egan Hub Storage, LLC (Egan Hub) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, the tariff sheets listed in Appendix A of the filing to be effective September 26, 2007. Egan Hub states that the purpose of this filing is to: (i) Implement new enhanced park and loan services; (ii) revise the contracting provisions in the Egan Hub Tariff to promote administrative efficiency, further automate the process for requesting and contracting for service, and ensure Egan Hub’s continued compliance with Commission regulations; (iii) clarify one aspect of Egan Hub’s creditworthiness provisions; and (iv) modify various exhibits to the forms of service agreements in order to accurately reflect the specific details of each transaction. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for E:\FR\FM\07SEN1.SGM 07SEN1 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–17660 Filed 9–6–07; 8:45 am] Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–17662 Filed 9–6–07; 8:45 am] docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–17663 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Energy West Development, Inc; Notice of Compliance Filing August 29, 2007. Take notice that on August 24, 2007, Energy West Development, Inc. (Energy West) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, Second Revised Sheet No. 29, become effective September 1, 2005. Energy West states that the filing is being made in compliance filing with the Letter Order issued in this docket on August 10, 2007. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the 18:34 Sep 06, 2007 Northern Natural Gas Company; Notice of Tariff Filing Energy West Development, Inc.; Notice of Compliance Filing [Docket No. RP07–525–001] VerDate Aug<31>2005 [Docket No. RP07–616–000] [Docket No. RP07–522–001] Federal Energy Regulatory Commission mstockstill on PROD1PC66 with NOTICES 51425 Jkt 211001 August 29, 2007. Take notice that on August 24, 2007, Energy West Development, Inc. (Energy West) tendered as part of its FERC Gas Tariff, Original Volume No. 1, Second Revised Sheet No. 26 and Second Revised Sheet No. 28, to be effective August 10, 2007. Energy West states that the filing is being made in compliance filing with the Letter Order issued in this docket on August 10, 2007. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 August 29, 2007. Take notice that on August 24, 2007, Northern Natural Gas Company (Northern), tendered for filing in its FERC Gas Tariff, Fifth Revised Volume No. 1 First Revised Second Revised Sheet No. 445, to be effective September 24, 2007. Northern states that it is filing the above referenced tariff sheet to provide PDD shippers with increased flexibility regarding their deferred delivery points. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 72, Number 173 (Friday, September 7, 2007)]
[Notices]
[Pages 51424-51425]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17660]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-615-000]


Egan Hub Storage, LLC; Notice of Proposed Changes in FERC Gas 
Tariff

August 29, 2007.
    Take notice that on August 24, 2007, Egan Hub Storage, LLC (Egan 
Hub) tendered for filing as part of its FERC Gas Tariff, First Revised 
Volume No. 1, the tariff sheets listed in Appendix A of the filing to 
be effective September 26, 2007.
    Egan Hub states that the purpose of this filing is to: (i) 
Implement new enhanced park and loan services; (ii) revise the 
contracting provisions in the Egan Hub Tariff to promote administrative 
efficiency, further automate the process for requesting and contracting 
for service, and ensure Egan Hub's continued compliance with Commission 
regulations; (iii) clarify one aspect of Egan Hub's creditworthiness 
provisions; and (iv) modify various exhibits to the forms of service 
agreements in order to accurately reflect the specific details of each 
transaction.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for

[[Page 51425]]

review in the Commission's Public Reference Room in Washington, DC. 
There is an ``eSubscription'' link on the Web site that enables 
subscribers to receive e-mail notification when a document is added to 
a subscribed docket(s). For assistance with any FERC Online service, 
please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll 
free). For TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-17660 Filed 9-6-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.