Questar Pipeline Company; Notice of Application, 51426-51427 [E7-17658]
Download as PDF
51426
Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17659 Filed 9–6–07; 8:45 am]
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 19, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17665 Filed 9–6–07; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket Nos. CP07–438–000]
[Docket No. OA07–81–000]
Questar Pipeline Company; Notice of
Application
PJM Transmission Owners; Notice of
Compliance Filing
August 30, 2007.
mstockstill on PROD1PC66 with NOTICES
August 28, 2007.
Take notice that on July 13, 2007, PJM
Transmission Owners, acting through
the Consolidated Transmission Owners
Agreement, jointly submitted a filing in
compliance with Paragraph 263 of Order
No. 890.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate Aug<31>2005
18:34 Sep 06, 2007
Jkt 211001
Take notice that on August 23, 2007,
Pipeline Company (Questar Pipeline),
and Questar Gas Company (Questar Gas)
(the Applicants), 180 East 100 South,
Salt Lake City, Utah 84111, jointly filed
in Docket No. CP07–438–000, an
application, pursuant to section 7(b) of
the Natural Gas Act (NGA), seeking
authority for Questar Pipeline to
abandon Jurisdictional Lateral (JL) 4, by
sale, to Questar Gas. The applicants also
seek a determination that, upon
acquisition, the JL 4 facilities will be
considered non-jurisdictional under
section 1(b) of the NGA, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, call (202)
502–8659 or TTY, (202) 208–3676.
Specifically, the JL 4 is an 8-inch
diameter pipeline that extends
approximately 14.63 miles northeast
from Questar Pipeline’s existing North
Baxter Compressor Station delivery area
to Questar Pipeline’s Nightingale
Compressor Station. This pipeline is
located on Questar Pipeline’s northern
transmission system in the vicinity of
Rock Springs, Sweetwater County,
Wyoming.
Any questions regarding this
application should be directed to L.
Bradley Burton, Manager, Federal
Regulatory Affairs, Questar Pipeline
Company, 180 East 100 South, P.O. Box
45360, Salt Lake City, Utah 84145–0360,
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
at (801) 324–2459, or by fax at (801)
324–5834, or e-mail
brad.burton@questar.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
E:\FR\FM\07SEN1.SGM
07SEN1
Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 30, 3007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17658 Filed 9–5–07; 8:45 am]
mstockstill on PROD1PC66 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:34 Sep 06, 2007
Jkt 211001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–421–002]
Transcontinental Gas Pipe Line
Corporation; Notice of Petition To
Amend
August 29, 2007.
Take notice that on August 17, 2007,
Transcontinental Gas Pipe Line
Corporation (Transco), Post Office Box
1396, Houston, Texas 77251, filed in
Docket No. CP06–421–002, a petition to
amend the Commission order issued
April 12, 2007, pursuant to section 7 of
the Natural Gas Act (NGA) to: (i) Revise
the estimated cost of the Potomac
Expansion Project (Project) facilities that
are anticipated to be placed into service
November 1, 2007; (ii) include in the
cost of the Project the estimated cost
associated with the facility
modifications in Fairfax County,
Virginia, required by the Commission in
the certificate order (the piggable ‘‘Y’’
facilities) which facilities are expected
to be in-service October 1, 2008; (iii)
revise the initial recourse rates for the
Project to reflect the increased cost of
Project facilities; and (iv) phase-in the
initial recourse rates for the Project to
reflect the cost of facilities expected to
be placed into service November 1, 2007
and the additional costs associated with
the piggable ‘‘Y’’ facilities that are
expected to be placed into service
October 1, 2008, all as more fully set
forth in the petition to amend which is
on file with the Commission and open
to public inspection. This filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll free (866) 208–3676, or for TTY
contact (202) 502–8659.
Any questions regarding this petition
should be directed to Marg Camardello,
Manager, Certificates and Tariffs,
Transcontinental Gas Pipe Line
Corporation, P.O. Box 1396, Houston,
Texas 77251 at (713) 215–3380.
Pursuant to § 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
51427
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings in Docket No. CP06–
421–002 should, on or before the below
listed comment date, file with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC.
20426, a motion to intervene in
accordance with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of, or in
opposition to, this project. The
Commission will consider these
comments in determining the
appropriate action to be taken, but the
filing of a comment alone will not serve
to make the filer a party to the
proceeding. The Commission’s rules
require that persons filing comments in
opposition to the project provide copies
of their protests only to the party or
parties directly involved in the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental comments will be placed
on the Commission’s environmental
mailing list, will receive copies of the
E:\FR\FM\07SEN1.SGM
07SEN1
Agencies
[Federal Register Volume 72, Number 173 (Friday, September 7, 2007)]
[Notices]
[Pages 51426-51427]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17658]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP07-438-000]
Questar Pipeline Company; Notice of Application
August 30, 2007.
Take notice that on August 23, 2007, Pipeline Company (Questar
Pipeline), and Questar Gas Company (Questar Gas) (the Applicants), 180
East 100 South, Salt Lake City, Utah 84111, jointly filed in Docket No.
CP07-438-000, an application, pursuant to section 7(b) of the Natural
Gas Act (NGA), seeking authority for Questar Pipeline to abandon
Jurisdictional Lateral (JL) 4, by sale, to Questar Gas. The applicants
also seek a determination that, upon acquisition, the JL 4 facilities
will be considered non-jurisdictional under section 1(b) of the NGA,
all as more fully set forth in the application which is on file with
the Commission and open to public inspection. This filing may also be
viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number, excluding the last three
digits, in the docket number field to access the document. For
assistance, call (202) 502-8659 or TTY, (202) 208-3676.
Specifically, the JL 4 is an 8-inch diameter pipeline that extends
approximately 14.63 miles northeast from Questar Pipeline's existing
North Baxter Compressor Station delivery area to Questar Pipeline's
Nightingale Compressor Station. This pipeline is located on Questar
Pipeline's northern transmission system in the vicinity of Rock
Springs, Sweetwater County, Wyoming.
Any questions regarding this application should be directed to L.
Bradley Burton, Manager, Federal Regulatory Affairs, Questar Pipeline
Company, 180 East 100 South, P.O. Box 45360, Salt Lake City, Utah
84145-0360, at (801) 324-2459, or by fax at (801) 324-5834, or e-mail
brad.burton@questar.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
[[Page 51427]]
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on September 30, 3007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-17658 Filed 9-5-07; 8:45 am]
BILLING CODE 6717-01-P