Questar Pipeline Company; Notice of Application, 51426-51427 [E7-17658]

Download as PDF 51426 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–17659 Filed 9–6–07; 8:45 am] Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 19, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17665 Filed 9–6–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket Nos. CP07–438–000] [Docket No. OA07–81–000] Questar Pipeline Company; Notice of Application PJM Transmission Owners; Notice of Compliance Filing August 30, 2007. mstockstill on PROD1PC66 with NOTICES August 28, 2007. Take notice that on July 13, 2007, PJM Transmission Owners, acting through the Consolidated Transmission Owners Agreement, jointly submitted a filing in compliance with Paragraph 263 of Order No. 890. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 Take notice that on August 23, 2007, Pipeline Company (Questar Pipeline), and Questar Gas Company (Questar Gas) (the Applicants), 180 East 100 South, Salt Lake City, Utah 84111, jointly filed in Docket No. CP07–438–000, an application, pursuant to section 7(b) of the Natural Gas Act (NGA), seeking authority for Questar Pipeline to abandon Jurisdictional Lateral (JL) 4, by sale, to Questar Gas. The applicants also seek a determination that, upon acquisition, the JL 4 facilities will be considered non-jurisdictional under section 1(b) of the NGA, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, call (202) 502–8659 or TTY, (202) 208–3676. Specifically, the JL 4 is an 8-inch diameter pipeline that extends approximately 14.63 miles northeast from Questar Pipeline’s existing North Baxter Compressor Station delivery area to Questar Pipeline’s Nightingale Compressor Station. This pipeline is located on Questar Pipeline’s northern transmission system in the vicinity of Rock Springs, Sweetwater County, Wyoming. Any questions regarding this application should be directed to L. Bradley Burton, Manager, Federal Regulatory Affairs, Questar Pipeline Company, 180 East 100 South, P.O. Box 45360, Salt Lake City, Utah 84145–0360, PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 at (801) 324–2459, or by fax at (801) 324–5834, or e-mail brad.burton@questar.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project E:\FR\FM\07SEN1.SGM 07SEN1 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 30, 3007. Kimberly D. Bose, Secretary. [FR Doc. E7–17658 Filed 9–5–07; 8:45 am] mstockstill on PROD1PC66 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–421–002] Transcontinental Gas Pipe Line Corporation; Notice of Petition To Amend August 29, 2007. Take notice that on August 17, 2007, Transcontinental Gas Pipe Line Corporation (Transco), Post Office Box 1396, Houston, Texas 77251, filed in Docket No. CP06–421–002, a petition to amend the Commission order issued April 12, 2007, pursuant to section 7 of the Natural Gas Act (NGA) to: (i) Revise the estimated cost of the Potomac Expansion Project (Project) facilities that are anticipated to be placed into service November 1, 2007; (ii) include in the cost of the Project the estimated cost associated with the facility modifications in Fairfax County, Virginia, required by the Commission in the certificate order (the piggable ‘‘Y’’ facilities) which facilities are expected to be in-service October 1, 2008; (iii) revise the initial recourse rates for the Project to reflect the increased cost of Project facilities; and (iv) phase-in the initial recourse rates for the Project to reflect the cost of facilities expected to be placed into service November 1, 2007 and the additional costs associated with the piggable ‘‘Y’’ facilities that are expected to be placed into service October 1, 2008, all as more fully set forth in the petition to amend which is on file with the Commission and open to public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll free (866) 208–3676, or for TTY contact (202) 502–8659. Any questions regarding this petition should be directed to Marg Camardello, Manager, Certificates and Tariffs, Transcontinental Gas Pipe Line Corporation, P.O. Box 1396, Houston, Texas 77251 at (713) 215–3380. Pursuant to § 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice, the Commission staff will either complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 51427 Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings in Docket No. CP06– 421–002 should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC. 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of, or in opposition to, this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental comments will be placed on the Commission’s environmental mailing list, will receive copies of the E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 72, Number 173 (Friday, September 7, 2007)]
[Notices]
[Pages 51426-51427]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17658]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP07-438-000]


Questar Pipeline Company; Notice of Application

August 30, 2007.
    Take notice that on August 23, 2007, Pipeline Company (Questar 
Pipeline), and Questar Gas Company (Questar Gas) (the Applicants), 180 
East 100 South, Salt Lake City, Utah 84111, jointly filed in Docket No. 
CP07-438-000, an application, pursuant to section 7(b) of the Natural 
Gas Act (NGA), seeking authority for Questar Pipeline to abandon 
Jurisdictional Lateral (JL) 4, by sale, to Questar Gas. The applicants 
also seek a determination that, upon acquisition, the JL 4 facilities 
will be considered non-jurisdictional under section 1(b) of the NGA, 
all as more fully set forth in the application which is on file with 
the Commission and open to public inspection. This filing may also be 
viewed on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number, excluding the last three 
digits, in the docket number field to access the document. For 
assistance, call (202) 502-8659 or TTY, (202) 208-3676.
    Specifically, the JL 4 is an 8-inch diameter pipeline that extends 
approximately 14.63 miles northeast from Questar Pipeline's existing 
North Baxter Compressor Station delivery area to Questar Pipeline's 
Nightingale Compressor Station. This pipeline is located on Questar 
Pipeline's northern transmission system in the vicinity of Rock 
Springs, Sweetwater County, Wyoming.
    Any questions regarding this application should be directed to L. 
Bradley Burton, Manager, Federal Regulatory Affairs, Questar Pipeline 
Company, 180 East 100 South, P.O. Box 45360, Salt Lake City, Utah 
84145-0360, at (801) 324-2459, or by fax at (801) 324-5834, or e-mail 
brad.burton@questar.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project

[[Page 51427]]

provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on September 30, 3007.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-17658 Filed 9-5-07; 8:45 am]