Download as PDF Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 3 p.m., Monday, September 24, 2007. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor, Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Enforcement Matters. FOR FURTHER INFORMATION CONTACT: Contact Sauntia S. Warfield, 202–418– 5084. David A. Stawick, Secretary of the Commission. [FR Doc. 07–4418 Filed 9–5–07; 3:46 pm] BILLING CODE 6351–01–M COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 2 p.m., Wednesday, September 12, 2007. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED:: Enforcement Matters. FOR FURTHER INFORMATION CONTACT: Sauntia S. Warfield, 202–418–5084. David A. Stawick, Secretary of the Commission. [FR Doc. 07–4419 Filed 9–5–07; 3:46 am] BILLING CODE 6351–01–M DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers mstockstill on PROD1PC66 with NOTICES Intergovernmental Agreement Between the United States Department of the Army and the State of Florida Establishing Interim Targets for the Comprehensive Everglades Restoration Plan Department of the Army, U.S. Army of Engineers, DoD. ACTION: Notice of availability. AGENCY: SUMMARY: The Army Corps of Engineers and the State of Florida have established VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 interim targets for the Comprehensive Everglades Restoration Plan as required by section 385.39(c) of the Programmatic Regulations for the Comprehensive Everglades Restoration Plan. The purpose of the interim targets is to evaluate progress towards other water related needs of the region provided for in the Comprehensive Everglades Restoration Plan throughout the implementation process. The parties have chosen to memorialize the proposed interim targets in an Interim Targets Agreement. ADDRESSES: Copies of the Interim Targets Agreement can be obtained by request from the U.S. Army Corps of Engineers, Jacksonville District, RECOVER, ATTN: Rebecca Weiss, 701 San Marco Blvd., Jacksonville, FL 32207 or by electronic mail (e-mail) to: Rebecca.j.weiss@usace.army.mil. In addition, the Intergovernmental agreement can be found at the following Web site: https:// www.evergladesplan.org/pm/ progr_regs_igit_agreements.aspx. FOR FURTHER INFORMATION CONTACT: Rebecca Weiss, (904) 232–1577. SUPPLEMENTARY INFORMATION: Section 385.39(c) of the Programmatic Regulations for the Comprehensive Everglades Restoration Plan sets forth the process for establishing the interim targets for the Comprehensive Everglades Restoration Plan. This section provides that the interim targets be developed by the Secretary of the Army and the governor of the State of Florida in consultation with the Department of the Interior, the Environmental Protection Agency, the Department of Commerce, the Miccosukee Tribe of Indians of Florida, the Seminole Tribe of Florida, the Florida Department of Environmental Protection, and other Federal, State, and local agencies, and the South Florida Ecosystem Restoration Task Force. In considering the interim targets, the Secretary of the Army and the Governor of the State of Florida are required to consider the technical recommendations of RECOVER and any modifications to those recommendations by the Corps of Engineers or the South Florida Water Management District. The Programmatic Regulations require that the Secretary of the Army afford the public an opportunity to comment on the proposed Interim Targets Agreement prior to its approval and notice in the Federal Register when the agreement has been finalized. The draft final of the Intergovernmental agreement was published in the Federal Register November 3, 2006 (71 FR 64687). Public comments on the draft PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 51419 intergovernmental agreements establishing interim targets were accepted through December 4, 2006. The final intergovernmental agreement establishing the interim targets was signed on April 27, 2007. An electronic copy of this document is available at: https://www.evergladesplan.org/pm/ progr_regs_igit_agreements.aspx. Brenda S. Bowen, Army Federal Register Liaison Officer. [FR Doc. 07–4376 Filed 9–6–07; 8:45 am] BILLING CODE 3710–AJ–M DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intergovernmental Agreement Among the United States Department of the Army, the United States Department of the Interior, and the State of Florida Establishing Interim Restoration Goals for the Comprehensive Everglades Restoration Plan Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of availability. AGENCY: SUMMARY: The Army Corps of Engineers, the Department of the Interior and the State of Florida have established the interim goals for the Comprehensive Everglades Restoration Plan through the Interim Goals Agreement as required by section 385.38(d) of the Programmatic Regulations for the Comprehensive Everglades Restoration Plan. Interim goals are a mean by which restoration success of the Comprehensive Everglades Restoration Plan may be evaluated at specific points by agency managers, the State of Florida, the Congress throughout the overall planning and implementation process. This intergovernmental Agreement establishing the interim goals was signed on April 27, 2007. ADDRESSES: A copy of the Interim Goals Agreement can be obtained by request from the U.S. Army Corps of Engineers, Jacksonville District, RECOVER, ATTN: Rebecca Weiss, 701 San Marco Blvd., Jacksonville, FL 32207–8175 or by email to: Rebecca.j.weiss@usace.army.mil. In addition, the Intergovernmental agreement can be found at the following Web site: http:/www.evergladesplan.org/ pm/progr_regs_igit_agreements.aspx. FOR FURTHER INFORMATION CONTACT: Rebecca Weiss, (904) 232–1577. SUPPLEMENTARY INFORMATION: Section 385.38(d) of the Programmatic Regulations for the Comprehensive E:\FR\FM\07SEN1.SGM 07SEN1

Agencies

[Federal Register Volume 72, Number 173 (Friday, September 7, 2007)]
[Notices]
[Page 51419]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-4376]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army; Corps of Engineers


Intergovernmental Agreement Between the United States Department 
of the Army and the State of Florida Establishing Interim Targets for 
the Comprehensive Everglades Restoration Plan

AGENCY: Department of the Army, U.S. Army of Engineers, DoD.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The Army Corps of Engineers and the State of Florida have 
established interim targets for the Comprehensive Everglades 
Restoration Plan as required by section 385.39(c) of the Programmatic 
Regulations for the Comprehensive Everglades Restoration Plan. The 
purpose of the interim targets is to evaluate progress towards other 
water related needs of the region provided for in the Comprehensive 
Everglades Restoration Plan throughout the implementation process. The 
parties have chosen to memorialize the proposed interim targets in an 
Interim Targets Agreement.

ADDRESSES: Copies of the Interim Targets Agreement can be obtained by 
request from the U.S. Army Corps of Engineers, Jacksonville District, 
RECOVER, ATTN: Rebecca Weiss, 701 San Marco Blvd., Jacksonville, FL 
32207 or by electronic mail (e-mail) to: 
Rebecca.j.weiss@usace.army.mil. In addition, the Intergovernmental 
agreement can be found at the following Web site: https://
www.evergladesplan.org/pm/progr_regs_igit_agreements.aspx.

FOR FURTHER INFORMATION CONTACT: Rebecca Weiss, (904) 232-1577.

SUPPLEMENTARY INFORMATION: Section 385.39(c) of the Programmatic 
Regulations for the Comprehensive Everglades Restoration Plan sets 
forth the process for establishing the interim targets for the 
Comprehensive Everglades Restoration Plan. This section provides that 
the interim targets be developed by the Secretary of the Army and the 
governor of the State of Florida in consultation with the Department of 
the Interior, the Environmental Protection Agency, the Department of 
Commerce, the Miccosukee Tribe of Indians of Florida, the Seminole 
Tribe of Florida, the Florida Department of Environmental Protection, 
and other Federal, State, and local agencies, and the South Florida 
Ecosystem Restoration Task Force. In considering the interim targets, 
the Secretary of the Army and the Governor of the State of Florida are 
required to consider the technical recommendations of RECOVER and any 
modifications to those recommendations by the Corps of Engineers or the 
South Florida Water Management District. The Programmatic Regulations 
require that the Secretary of the Army afford the public an opportunity 
to comment on the proposed Interim Targets Agreement prior to its 
approval and notice in the Federal Register when the agreement has been 
finalized. The draft final of the Intergovernmental agreement was 
published in the Federal Register November 3, 2006 (71 FR 64687). 
Public comments on the draft intergovernmental agreements establishing 
interim targets were accepted through December 4, 2006. The final 
intergovernmental agreement establishing the interim targets was signed 
on April 27, 2007. An electronic copy of this document is available at: 
https://www.evergladesplan.org/pm/progr_regs_igit_agreements.aspx.

Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 07-4376 Filed 9-6-07; 8:45 am]