Preventing Undue Discrimination and Preference in Transmission Service; Notice of Technical Conferences, 51223 [E7-17551]
Download as PDF
Federal Register / Vol. 72, No. 172 / Thursday, September 6, 2007 / Notices
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 13, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17546 Filed 9–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. RM05–17–000; RM05–25–000]
Preventing Undue Discrimination and
Preference in Transmission Service;
Notice of Technical Conferences
August 28, 2007.
Take notice that Commission staff
will convene technical conferences on
the following dates in the following
cities to review and discuss the draft
proposals regarding transmission
planning required by the ‘‘Order
Extending Compliance Action Date and
Establishing Technical Conferences’’
issued in this proceeding on July 27,
2007.1 Staff expects all transmission
providers to participate in the technical
conference for their particular region,
although all interested persons,
including other transmission providers,
51223
regional representatives, and
transmission customers are invited to
attend each conference. In the July 27
Order, the Commission extended until
December 7, 2007 the date for
transmission providers to submit an
Attachment K to their Open Access
Transmission Tariff incorporating the
transmission planning principles and
concepts adopted in Order No. 890.2 To
facilitate the development of these
filings, the Commission also required
transmission providers to post a draft of
their Attachment K on or before
September 14, 2007, and established a
second round of staff technical
conferences,3 which is being scheduled
in this notice, for the purpose of
stakeholder review of those drafts.4
Date
Location
Transmission provider participants
October 1–2, 2007 ......................
Atlanta, GA ...............
October 15–16, 2007 ..................
Boston, MA ..............
Entities located in the states represented in the Southeastern Association of Regulatory Utility Commissioners (SEARUC) and entities located in the Southwest
Power Pool footprint.
Those wishing to participate as a panelist and provide feedback on the proposals
should submit a request form by close of business on September 21, 2007, located
at:
https://www.ferc.gov/whats-new/registration/transmission-planning-speakerform.asp.
Entities located within the Midwest ISO, PJM, New York ISO, and ISO New England
footprints, MAPP/MAPP Participants, and adjacent areas.
Those wishing to participate as a panelist and provide feedback on the proposals
should submit a request form by close of business on September 28, 2007, located
at:
https://www.ferc.gov/whats-new/registration/transmission-planning-speakerform.asp.
A further notice with a detailed
agenda for each conference will be
issued in advance of the conferences.
Details about locations of meetings will
be provided at that time. In the event a
transmission provider is uncertain as to
which technical conference is the
appropriate forum for discussion of its
draft proposal, such transmission
providers should contact Commission
staff in advance to discuss the matter.
For further information about these
conferences, please contact:
Washington, DC 20426, (202) 502–
8938. Tony.Ingram@ferc.gov.
John Cohen (Legal Information), Office
of the General Counsel—Energy
Markets, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, (202) 502–
8705. John.Cohen@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17551 Filed 9–5–07; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on PROD1PC66 with NOTICES
Tony Ingram (Technical Information),
Office of Energy Markets and
Reliability, Federal Energy Regulatory
Commission, 888 First Street, NE.,
1 Preventing Undue Discrimination and
Preference in Transmission Service, 120 FERC
¶ 61,103 (2007) at P 2 & 5 (July 27 Order).
2 Preventing Undue Discrimination and
Preference in Transmission Service, Order No. 890,
72 FR 12266 (March 15, 2007), FERC Stats. & Regs.
¶ 31,241 at p 444–602 (2007), reh’g pending.
VerDate Aug<31>2005
18:25 Sep 05, 2007
Jkt 211001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2007–0286; FRL–8463–9]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; EPA’s In-Use Vehicle and
Engine Testing Programs; EPA ICR No.
0222.08, OMB Control No. 2060–0086
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (PRA)(44
U.S.C. 3501 et seq.), this document
announces that an Information
3 The first round of staff technical conferences
were held on: June 4–7, 2007 in Little Rock, AR,
covering the southeast including Southwest Power
Pool and its members; June 13, 2007 in Park City,
UT, covering the northwest; June 26, 2007 in
Phoenix, AZ, covering the southwest and
California; and June 28–29, 2007 in Pittsburgh, PA,
covering the ISO New England, New York ISO, PJM
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Interconnection, Midwest ISO, and Mid-Continent
Area Power Pool (MAPP) subregions.
4 Additionally, on August 2, 2007, Commission
staff placed in the record of this proceeding a White
Paper to assist transmission providers in their
development of tariff language consistent with the
requirements of Order No. 890.
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 72, Number 172 (Thursday, September 6, 2007)]
[Notices]
[Page 51223]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17551]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. RM05-17-000; RM05-25-000]
Preventing Undue Discrimination and Preference in Transmission
Service; Notice of Technical Conferences
August 28, 2007.
Take notice that Commission staff will convene technical
conferences on the following dates in the following cities to review
and discuss the draft proposals regarding transmission planning
required by the ``Order Extending Compliance Action Date and
Establishing Technical Conferences'' issued in this proceeding on July
27, 2007.\1\ Staff expects all transmission providers to participate in
the technical conference for their particular region, although all
interested persons, including other transmission providers, regional
representatives, and transmission customers are invited to attend each
conference. In the July 27 Order, the Commission extended until
December 7, 2007 the date for transmission providers to submit an
Attachment K to their Open Access Transmission Tariff incorporating the
transmission planning principles and concepts adopted in Order No.
890.\2\ To facilitate the development of these filings, the Commission
also required transmission providers to post a draft of their
Attachment K on or before September 14, 2007, and established a second
round of staff technical conferences,\3\ which is being scheduled in
this notice, for the purpose of stakeholder review of those drafts.\4\
---------------------------------------------------------------------------
\1\ Preventing Undue Discrimination and Preference in
Transmission Service, 120 FERC ] 61,103 (2007) at P 2 & 5 (July 27
Order).
\2\ Preventing Undue Discrimination and Preference in
Transmission Service, Order No. 890, 72 FR 12266 (March 15, 2007),
FERC Stats. & Regs. ] 31,241 at p 444-602 (2007), reh'g pending.
\3\ The first round of staff technical conferences were held on:
June 4-7, 2007 in Little Rock, AR, covering the southeast including
Southwest Power Pool and its members; June 13, 2007 in Park City,
UT, covering the northwest; June 26, 2007 in Phoenix, AZ, covering
the southwest and California; and June 28-29, 2007 in Pittsburgh,
PA, covering the ISO New England, New York ISO, PJM Interconnection,
Midwest ISO, and Mid-Continent Area Power Pool (MAPP) subregions.
\4\ Additionally, on August 2, 2007, Commission staff placed in
the record of this proceeding a White Paper to assist transmission
providers in their development of tariff language consistent with
the requirements of Order No. 890.
----------------------------------------------------------------------------------------------------------------
Date Location Transmission provider participants
----------------------------------------------------------------------------------------------------------------
October 1-2, 2007.................... Atlanta, GA............ Entities located in the states represented in
the Southeastern Association of Regulatory
Utility Commissioners (SEARUC) and entities
located in the Southwest Power Pool footprint.
Those wishing to participate as a panelist and
provide feedback on the proposals should submit
a request form by close of business on
September 21, 2007, located at: https://
www.ferc.gov/whats-new/registration/
transmission-planning-speaker-form.asp.
October 15-16, 2007.................. Boston, MA............. Entities located within the Midwest ISO, PJM,
New York ISO, and ISO New England footprints,
MAPP/MAPP Participants, and adjacent areas.
Those wishing to participate as a panelist and
provide feedback on the proposals should submit
a request form by close of business on
September 28, 2007, located at: https://
www.ferc.gov/whats-new/registration/
transmission-planning-speaker-form.asp.
----------------------------------------------------------------------------------------------------------------
A further notice with a detailed agenda for each conference will be
issued in advance of the conferences. Details about locations of
meetings will be provided at that time. In the event a transmission
provider is uncertain as to which technical conference is the
appropriate forum for discussion of its draft proposal, such
transmission providers should contact Commission staff in advance to
discuss the matter.
For further information about these conferences, please contact:
Tony Ingram (Technical Information), Office of Energy Markets and
Reliability, Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, (202) 502-8938. Tony.Ingram@ferc.gov.
John Cohen (Legal Information), Office of the General Counsel--Energy
Markets, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, (202) 502-8705. John.Cohen@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-17551 Filed 9-5-07; 8:45 am]