Download as PDF mstockstill on PROD1PC66 with NOTICES 51220 Federal Register / Vol. 72, No. 172 / Thursday, September 6, 2007 / Notices 2007 index rate increases as unjust and unreasonable under section 1(5) of the Interstate Commerce Act. BP requests that the Commission review and investigate SFPP’s index rate increases; set the proceeding for an evidentiary hearing to determine just and reasonable rates for SFPP; require the payment of refunds and reparations starting two years before the date of complaint for all rates; and award such other relief as is necessary and appropriate under the Interstate Commerce Act. BP states that copies of the Complaint were served on SFPP. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 11, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17552 Filed 9–5–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 18:25 Sep 05, 2007 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–437–000] Centerpoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization August 27, 2007. Take notice that on August 15, 2007, CenterPoint Energy Gas Transmission Company (CenterPoint), 1111 Louisiana Street, Houston, Texas, filed in Docket No. CP07–437–000 a prior notice request pursuant to sections 157.205 and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA), and CenterPoint’s blanket certificate issued in Docket No. CP82– 384–000 on September 1, 1982,1 and amended in Docket No. CP82–384–001 on February 10, 1983.2 Centerpoint seeks authorization to construct, own, and operate a new compressor station on Line AC located near the city of Cove in Polk County, Arkansas, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Specifically, CenterPoint proposes to install a Solar Mars 100/C652 Turbine driven Centrifugal Compressor Package and associated ancillary equipment within a 38.5 acre lot owned by CenterPoint. The total compression available will be 14,801 horsepower. The proposed facilities will provide CenterPoint’s customers with flexible access to traditional Mid-continent gas supplies and will enhance CenterPoint’s infrastructure needed to support current and future natural gas development and production activities across CenterPoint’s system. CenterPoint estimates that total construction costs will be approximately $26,257,504. Any questions regarding this application should be directed to Michelle Willis, Supervisor, Rates & Regulatory, CenterPoint Energy Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or call (318) 429–3708. Any person or the Commission’s Staff may, within 60 days after the issuance 1 20 2 22 Jkt 211001 PO 00000 FERC ¶ 62,408 (1982). FERC ¶ 61,148 (1983). Frm 00009 Fmt 4703 Sfmt 4703 of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: October 27, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17547 Filed 9–5–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07–439–000] Chestnut Ridge Storage, LLC; Notice of Application August 28, 2007. Take notice that on August 24, 2007, Chestnut Ridge Storage, LLC (Chestnut Ridge), 10000 Memorial Drive, Suite 200, Houston, Texas 77024–3410, filed in Docket No. CP07–439–000, a petition for Exemption of Temporary Acts and Operations from Certificate Requirements, pursuant to Rule 207(a)(5) of the Commission’s Rules of Practice and Procedure, and section 7(c)(1)(B) of the Natural Gas Act, seeking approval of an exemption from certificate requirements to perform temporary activities in order to drill stratigraphic test wells and perform other activities to assess the optimal manner in which to develop an underground natural gas storage facility in the West Summit Field in Fayette County, Pennsylvania, Preston County, West Virginia and Monongalia County, West Virginia, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may also be E:\FR\FM\06SEN1.SGM 06SEN1

Agencies

[Federal Register Volume 72, Number 172 (Thursday, September 6, 2007)]
[Notices]
[Page 51220]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17547]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-437-000]


Centerpoint Energy Gas Transmission Company; Notice of Request 
Under Blanket Authorization

August 27, 2007.
    Take notice that on August 15, 2007, CenterPoint Energy Gas 
Transmission Company (CenterPoint), 1111 Louisiana Street, Houston, 
Texas, filed in Docket No. CP07-437-000 a prior notice request pursuant 
to sections 157.205 and 157.210 of the Commission's regulations under 
the Natural Gas Act (NGA), and CenterPoint's blanket certificate issued 
in Docket No. CP82-384-000 on September 1, 1982,\1\ and amended in 
Docket No. CP82-384-001 on February 10, 1983.\2\ Centerpoint seeks 
authorization to construct, own, and operate a new compressor station 
on Line AC located near the city of Cove in Polk County, Arkansas, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter 
the docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
---------------------------------------------------------------------------

    \1\ 20 FERC ] 62,408 (1982).
    \2\ 22 FERC ] 61,148 (1983).
---------------------------------------------------------------------------

    Specifically, CenterPoint proposes to install a Solar Mars 100/C652 
Turbine driven Centrifugal Compressor Package and associated ancillary 
equipment within a 38.5 acre lot owned by CenterPoint. The total 
compression available will be 14,801 horsepower. The proposed 
facilities will provide CenterPoint's customers with flexible access to 
traditional Mid-continent gas supplies and will enhance CenterPoint's 
infrastructure needed to support current and future natural gas 
development and production activities across CenterPoint's system. 
CenterPoint estimates that total construction costs will be 
approximately $26,257,504.
    Any questions regarding this application should be directed to 
Michelle Willis, Supervisor, Rates & Regulatory, CenterPoint Energy Gas 
Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or 
call (318) 429-3708.
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR 
157.205) a protest to the request. If no protest is filed within the 
time allowed therefore, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link.
    Comment Date: October 27, 2007.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-17547 Filed 9-5-07; 8:45 am]
BILLING CODE 6717-01-P