Centerpoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization, 51220 [E7-17547]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
51220
Federal Register / Vol. 72, No. 172 / Thursday, September 6, 2007 / Notices
2007 index rate increases as unjust and
unreasonable under section 1(5) of the
Interstate Commerce Act. BP requests
that the Commission review and
investigate SFPP’s index rate increases;
set the proceeding for an evidentiary
hearing to determine just and reasonable
rates for SFPP; require the payment of
refunds and reparations starting two
years before the date of complaint for all
rates; and award such other relief as is
necessary and appropriate under the
Interstate Commerce Act.
BP states that copies of the Complaint
were served on SFPP.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 11, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17552 Filed 9–5–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:25 Sep 05, 2007
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–437–000]
Centerpoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
August 27, 2007.
Take notice that on August 15, 2007,
CenterPoint Energy Gas Transmission
Company (CenterPoint), 1111 Louisiana
Street, Houston, Texas, filed in Docket
No. CP07–437–000 a prior notice
request pursuant to sections 157.205
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA), and CenterPoint’s blanket
certificate issued in Docket No. CP82–
384–000 on September 1, 1982,1 and
amended in Docket No. CP82–384–001
on February 10, 1983.2 Centerpoint
seeks authorization to construct, own,
and operate a new compressor station
on Line AC located near the city of Cove
in Polk County, Arkansas, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, CenterPoint proposes to
install a Solar Mars 100/C652 Turbine
driven Centrifugal Compressor Package
and associated ancillary equipment
within a 38.5 acre lot owned by
CenterPoint. The total compression
available will be 14,801 horsepower.
The proposed facilities will provide
CenterPoint’s customers with flexible
access to traditional Mid-continent gas
supplies and will enhance CenterPoint’s
infrastructure needed to support current
and future natural gas development and
production activities across
CenterPoint’s system. CenterPoint
estimates that total construction costs
will be approximately $26,257,504.
Any questions regarding this
application should be directed to
Michelle Willis, Supervisor, Rates &
Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box
21734, Shreveport, Louisiana 71151, or
call (318) 429–3708.
Any person or the Commission’s Staff
may, within 60 days after the issuance
1 20
2 22
Jkt 211001
PO 00000
FERC ¶ 62,408 (1982).
FERC ¶ 61,148 (1983).
Frm 00009
Fmt 4703
Sfmt 4703
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: October 27, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17547 Filed 9–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP07–439–000]
Chestnut Ridge Storage, LLC; Notice
of Application
August 28, 2007.
Take notice that on August 24, 2007,
Chestnut Ridge Storage, LLC (Chestnut
Ridge), 10000 Memorial Drive, Suite
200, Houston, Texas 77024–3410, filed
in Docket No. CP07–439–000, a petition
for Exemption of Temporary Acts and
Operations from Certificate
Requirements, pursuant to Rule
207(a)(5) of the Commission’s Rules of
Practice and Procedure, and section
7(c)(1)(B) of the Natural Gas Act,
seeking approval of an exemption from
certificate requirements to perform
temporary activities in order to drill
stratigraphic test wells and perform
other activities to assess the optimal
manner in which to develop an
underground natural gas storage facility
in the West Summit Field in Fayette
County, Pennsylvania, Preston County,
West Virginia and Monongalia County,
West Virginia, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. This filing may also be
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 72, Number 172 (Thursday, September 6, 2007)]
[Notices]
[Page 51220]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17547]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-437-000]
Centerpoint Energy Gas Transmission Company; Notice of Request
Under Blanket Authorization
August 27, 2007.
Take notice that on August 15, 2007, CenterPoint Energy Gas
Transmission Company (CenterPoint), 1111 Louisiana Street, Houston,
Texas, filed in Docket No. CP07-437-000 a prior notice request pursuant
to sections 157.205 and 157.210 of the Commission's regulations under
the Natural Gas Act (NGA), and CenterPoint's blanket certificate issued
in Docket No. CP82-384-000 on September 1, 1982,\1\ and amended in
Docket No. CP82-384-001 on February 10, 1983.\2\ Centerpoint seeks
authorization to construct, own, and operate a new compressor station
on Line AC located near the city of Cove in Polk County, Arkansas, all
as more fully set forth in the application which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,408 (1982).
\2\ 22 FERC ] 61,148 (1983).
---------------------------------------------------------------------------
Specifically, CenterPoint proposes to install a Solar Mars 100/C652
Turbine driven Centrifugal Compressor Package and associated ancillary
equipment within a 38.5 acre lot owned by CenterPoint. The total
compression available will be 14,801 horsepower. The proposed
facilities will provide CenterPoint's customers with flexible access to
traditional Mid-continent gas supplies and will enhance CenterPoint's
infrastructure needed to support current and future natural gas
development and production activities across CenterPoint's system.
CenterPoint estimates that total construction costs will be
approximately $26,257,504.
Any questions regarding this application should be directed to
Michelle Willis, Supervisor, Rates & Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or
call (318) 429-3708.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefore, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
Comment Date: October 27, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-17547 Filed 9-5-07; 8:45 am]