Download as PDF 50354 Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR07–19–000] ConocoPhillips Company, Complainant v. Calnev Pipe Line, LLC, Respondent; Notice of Complaint sroberts on PROD1PC70 with NOTICES August 22, 2007. Take notice that on August 20, 2007, pursuant to Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, and the Commission’s Procedural Rules applicable to Oil Pipeline Proceedings, 18 CFR 341(a), ConocoPhillips Company (Complainant) filed a formal complaint against Calnev Pipe Line, LLC (Respondent) alleging that the Respondent has violated and continues to violate the Interstate Commerce Act, 49 U.S.C. App. 1, et seq., by charging unjust and unreasonable rates for the Respondent’s jurisdictional interstate service, as more fully set forth in the Complaint. The Complainant states that copies of the complaint have been served on the Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm Eastern Time on September 10, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17243 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–89–000] H–P Energy Resources, LLC, Complainant v. PJM Interconnection, LLC, Respondent; Notice of Complaint August 22, 2007. Take notice that on August 20, 2007, pursuant to sections 206 and 212 of the Rules and Practice and Procedure, 18 CFR 385.206 and 385.212 and sections 205 and 306 of the Federal Power Act, 16 U.S.C. 824(e) and 825(e), H–P Energy Resources, LLC (Complainant) filed a formal complaint against PJM Interconnection, LLC (Respondent) alleging that, in contravention of the Federal Power Act and the rules and policies governing the Reliability Pricing Model, the Respondent has failed to identify on a timely basis the Incremental Import Capability for merchant transmission projects S119 and S120 (upgrades of the LexingtonDooms and Bristers-Ox 500 kv circuits). The Complainant has requested a shortened answer period and fast track processing of the complaint. The Complainant states that a copy of the complaint has been served on the Respondent. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm Eastern Time on August 31, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–17240 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings # 1 August 23, 2007. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC07–126–000. Applicants: Grant Peaking Power Holdings, LLC; Colbath Peaking Power, LLC; Lincoln Peaking Power Holdings, LLC; DTE Energy Services, Inc.; TPF II LC, LLC; Lincoln Generating Facility, LLC; Crete Energy Venture, LLC. Description: Grant Peaking Power Holdings, LLC et al submits a Joint Application for disposition of jurisdictional facilities and request for waivers and expedited consideration. Filed Date: 08/16/2007. Accession Number: 20070817–0054. Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG07–77–000. Applicants: Airtricity Champion Wind Farm, LLC. Description: Airtricity Champion Wind Farm, LLC submits a Notice of Self-Certification of Exempt Wholesale Generator Status. E:\FR\FM\31AUN1.SGM 31AUN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices Filed Date: 08/21/2007. Accession Number: 20070823–0027. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Docket Numbers: EG07–78–000. Applicants: Airtricity Roscoe Wind Farm, LLC. Description: Airtricity Roscoe Wind Farm, LLC submits a Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 08/21/2007. Accesion Number: 20070823–0031. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER02–1437–003. Applicants: Triton Power Michigan, LLC. Description: Triton Power Michigan LLC Notice of Non-Material Change in Status. Filed Date: 08/22/2007. Accession Number: 20070822–5013. Comment Date: 5 p.m. Eastern Time on Tuesday, September 4, 2007. Docket Numbers: ER02–1785–011. Applicants: Thermo Cogeneration Partnership, LP. Description: Thermo Cogeneration Partnership, LP Notice of Non-Material Change in Status. Filed Date: 08/22/2007. Accession Number: 20070822–5014. Comment Date: 5 p.m. Eastern Time on Tuesday, September 4, 2007. Docket Numbers: ER02–2560–009. Applicants: Louisville Gas & Electric Company. Description: Refund Report of Louisville Gas/Kentucky Utilities in Response to July 20, 2007 Order. Filed Date: 08/20/2007. Accession Number: 20070820–5039. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: ER03–421–013. Applicants: PPL Wallingford; PPL Wallingford Energy, LLC. Description: PPL Wallingford Energy, LLC and PPL EnergyPlus, LLC submits a compliance filing. Filed Date: 08/21/2007. Accession Number: 20070822–0075. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Docket Numbers: ER06–18–009. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits proposed revisions to comply with directives set forth in FERC’s 7/23/ 07 Order. Filed Date: 08/22/2007. VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 Accession Number: 20070823–0030. Comment Date: 5 p.m. Eastern Time on Wednesday, September 12, 2007. Docket Numbers: ER07–577–004. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits an Unexecuted Facilities Construction Agreement with Endeavor Power Partners, LLC in compliance with FERC’s 7/19/07 Order. Filed Date: 08/20/2007. Accession Number: 20070821–0020. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: ER07–1051–001. Applicants: Texzon Utilities, Ltd. Description: Texzon Utilities, Ltd submits an amended notice of succession and an amended filing to the 6/14/07 filing. Filed Date: 08/16/2007. Accession Number: 20070821–0022. Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007. Docket Numbers: ER07–1100–002. Applicants: Entergy Services, Inc. Description: Entergy Operating Companies’ Substitute Second Revised Network Integration Transmission Service Agreement and Substitute Network Operating Agreement with City of North Little Rock, Arkansas. Filed Date: 08/20/2007. Accession Number: 20070822–0035. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: ER07–1255–001. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc submits Exhibit I—corrected Substitute Original Sheet 1223 to FERC Electric Tariff, Fifth Revised Volume 1 related to energy imbalance market. Filed Date: 08/16/2007. Accession Number: 20070822–0074. Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007. Docket Numbers: ER07–1286–000; ER07–1286–001. Applicants: PJM Interconnection, LLC. Description: PJM Interconnection, LLC submits revisions to Schedule 2 of their Open Access Transmission Tariff. Filed Date: 08/16/2007. Accession Number: 20070817–0043; 20070822–0042. Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007. Docket Numbers: ER07–1292–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corp provides notice re PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 50355 the revised transmission Access Charges effective 7/1/07 to implement the revised Transmission Revenue Requirement of San Diego Gas & Electric Co. Filed Date: 08/17/2007. Accession Number: 20070821–0019. Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007. Docket Numbers: ER07–1293–000. Applicants: Upper Peninsula Power Company. Description: Upper Peninsula Power Co submits unexecuted agreement with Escanaba Municipal Electric Utility for the sale of short-term capacity and energy under Electric Rate Schedule 59, effective 8/18/07. Filed Date: 08/17/2007. Accession Number: 20070821–0024. Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007. Docket Numbers: ER07–1294–000. Applicants: PJM Interconnection, LLC. Description: PJM Interconnection, LLC submits amendments to Schedule 12 of the Amended and Restated Operating Agreement. Filed Date: 08/17/2007. Accession Number: 20070821–0023. Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007. Docket Numbers: ER07–1295–000. Applicants: Centennial Power, LLC. Description: Centennial Power, LLC submits a notice of cancellation of their FERC Electric Tariff, Original Volume 1. Filed Date: 08/20/2007. Accession Number: 20070821–0021. Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007. Docket Numbers: ER07–1297–000. Applicants: Chien Energy, LLC. Description: Chien Energy, LLC submits a petition for acceptance of initial tariff, waivers and blanket authority re their FERC Electric Rate Schedule 1. Filed Date: 08/21/2007. Accession Number: 20070822–0034. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Docket Numbers: ER07–1298–000. Applicants: Wabash Valley Power Association, Inc. Description: Wabash Valley Power Association, Inc submits the Wholesale Power Supply Contract with Boone REMC designated as Rate Schedule 33. Filed Date: 08/22/2007. Accession Number: 20070823–0018. Comment Date: 5 p.m. Eastern Time on Wednesday, September 12, 2007. Take notice that the Commission received the following open access transmission tariff filings: E:\FR\FM\31AUN1.SGM 31AUN1 50356 Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices sroberts on PROD1PC70 with NOTICES Docket Numbers: OA07–3–001. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits First Revised Sheet 81 et al. to FERC Electric Tariff, Third Revised Volume 4, to be effective 8/1/07. Filed Date: 08/21/2007. Accession Number: 20070823–0028. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. information, contact Kristen Murphy at (202) 502–6236. Nathaniel J. Davis Sr., Acting Deputy Secretary. [FR Doc. E7–17302 Filed 8–30–07; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E7–17252 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. PF07–10–000] [Project No. 906–006] Virginia Electric & Power Company; Notice of Availability of Environmental Assessment August 23, 2007. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a new license for the Cushaw Hydroelectric Project, located on the James River, near the Town of Glasgow, Virginia, and has prepared an Environmental Assessment (EA). In the EA, Commission staff, analyze potential environmental effects of relicensing the project and conclude that issuing a new license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Cushaw Project No. 906– 006’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 LNG Development Company, LLC and Oregon Pipeline Company; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Oregon LNG Terminal and Pipeline Project, Request for Comments on Environmental Issues and Notice of Public Meetings August 24, 2007. The Federal Energy Regulatory Commission (FERC or Commission) and the U.S. Department of Homeland Security, U.S. Coast Guard (Coast Guard) are in the process of evaluating the Oregon LNG Terminal and Pipeline Project involving the construction and operation of facilities proposed by LNG Development Company, LLC and Oregon Pipeline Company (collectively referred to as Oregon LNG). The facilities would be located in northern Oregon and consist of a liquefied natural gas (LNG) import terminal in Warrenton, Oregon, and an associated 117-mile-long natural gas pipeline from the LNG import terminal southeastward across Clatsop, Washington, Yamhill, Marion, and Clackamas Counties, Oregon, to an interconnection with the existing Williams Northwest Pipeline system near Molalla, Oregon. As a part of this evaluation, FERC staff will prepare an environmental impact statement (EIS) that will address the environmental impacts of the project and the Coast Guard will assess the safety and security of the project. As described below, the FERC and the Coast Guard will hold a joint public meeting to allow the public to provide input to these assessments. The Commission will use the EIS in its decision-making process to determine whether or not to authorize the project. This Notice of Intent (NOI) explains the scoping process we 1 will use to gather information on the project from the public and interested agencies and summarizes the process that the Coast Guard will use. Your input will 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the FERC’s Office of Emergy Projects. E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 72, Number 169 (Friday, August 31, 2007)]
[Notices]
[Pages 50354-50356]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17302]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings  1

August 23, 2007.
    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC07-126-000.
    Applicants: Grant Peaking Power Holdings, LLC; Colbath Peaking 
Power, LLC; Lincoln Peaking Power Holdings, LLC; DTE Energy Services, 
Inc.; TPF II LC, LLC; Lincoln Generating Facility, LLC; Crete Energy 
Venture, LLC.
    Description: Grant Peaking Power Holdings, LLC et al submits a 
Joint Application for disposition of jurisdictional facilities and 
request for waivers and expedited consideration.
    Filed Date: 08/16/2007.
    Accession Number: 20070817-0054.
    Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007.

    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG07-77-000.
    Applicants: Airtricity Champion Wind Farm, LLC.
    Description: Airtricity Champion Wind Farm, LLC submits a Notice of 
Self-Certification of Exempt Wholesale Generator Status.

[[Page 50355]]

    Filed Date: 08/21/2007.
    Accession Number: 20070823-0027.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007.

    Docket Numbers: EG07-78-000.
    Applicants: Airtricity Roscoe Wind Farm, LLC.
    Description: Airtricity Roscoe Wind Farm, LLC submits a Notice of 
Self-Certification of Exempt Wholesale Generator Status.
    Filed Date: 08/21/2007.
    Accesion Number: 20070823-0031.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER02-1437-003.
    Applicants: Triton Power Michigan, LLC.
    Description: Triton Power Michigan LLC Notice of Non-Material 
Change in Status.
    Filed Date: 08/22/2007.
    Accession Number: 20070822-5013.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 4, 2007.

    Docket Numbers: ER02-1785-011.
    Applicants: Thermo Cogeneration Partnership, LP.
    Description: Thermo Cogeneration Partnership, LP Notice of Non-
Material Change in Status.
    Filed Date: 08/22/2007.
    Accession Number: 20070822-5014.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 4, 2007.

    Docket Numbers: ER02-2560-009.
    Applicants: Louisville Gas & Electric Company.
    Description: Refund Report of Louisville Gas/Kentucky Utilities in 
Response to July 20, 2007 Order.
    Filed Date: 08/20/2007.
    Accession Number: 20070820-5039.
    Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007.

    Docket Numbers: ER03-421-013.
    Applicants: PPL Wallingford; PPL Wallingford Energy, LLC.
    Description: PPL Wallingford Energy, LLC and PPL EnergyPlus, LLC 
submits a compliance filing.
    Filed Date: 08/21/2007.
    Accession Number: 20070822-0075.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007.

    Docket Numbers: ER06-18-009.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc 
submits proposed revisions to comply with directives set forth in 
FERC's 7/23/07 Order.
    Filed Date: 08/22/2007.
    Accession Number: 20070823-0030.
    Comment Date: 5 p.m. Eastern Time on Wednesday, September 12, 2007.

    Docket Numbers: ER07-577-004.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc 
submits an Unexecuted Facilities Construction Agreement with Endeavor 
Power Partners, LLC in compliance with FERC's 7/19/07 Order.
    Filed Date: 08/20/2007.
    Accession Number: 20070821-0020.
    Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007.

    Docket Numbers: ER07-1051-001.
    Applicants: Texzon Utilities, Ltd.
    Description: Texzon Utilities, Ltd submits an amended notice of 
succession and an amended filing to the 6/14/07 filing.
    Filed Date: 08/16/2007.
    Accession Number: 20070821-0022.
    Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007.

    Docket Numbers: ER07-1100-002.
    Applicants: Entergy Services, Inc.
    Description: Entergy Operating Companies' Substitute Second Revised 
Network Integration Transmission Service Agreement and Substitute 
Network Operating Agreement with City of North Little Rock, Arkansas.
    Filed Date: 08/20/2007.
    Accession Number: 20070822-0035.
    Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007.

    Docket Numbers: ER07-1255-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Southwest Power Pool, Inc submits Exhibit I--corrected 
Substitute Original Sheet 1223 to FERC Electric Tariff, Fifth Revised 
Volume 1 related to energy imbalance market.
    Filed Date: 08/16/2007.
    Accession Number: 20070822-0074.
    Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007.

    Docket Numbers: ER07-1286-000; ER07-1286-001.
    Applicants: PJM Interconnection, LLC.
    Description: PJM Interconnection, LLC submits revisions to Schedule 
2 of their Open Access Transmission Tariff.
    Filed Date: 08/16/2007.
    Accession Number: 20070817-0043; 20070822-0042.
    Comment Date: 5 p.m. Eastern Time on Thursday, September 06, 2007.

    Docket Numbers: ER07-1292-000.
    Applicants: California Independent System Operator Corporation.
    Description: California Independent System Operator Corp provides 
notice re the revised transmission Access Charges effective 7/1/07 to 
implement the revised Transmission Revenue Requirement of San Diego Gas 
& Electric Co.
    Filed Date: 08/17/2007.
    Accession Number: 20070821-0019.
    Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007.

    Docket Numbers: ER07-1293-000.
    Applicants: Upper Peninsula Power Company.
    Description: Upper Peninsula Power Co submits unexecuted agreement 
with Escanaba Municipal Electric Utility for the sale of short-term 
capacity and energy under Electric Rate Schedule 59, effective 8/18/07.
    Filed Date: 08/17/2007.
    Accession Number: 20070821-0024.
    Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007.

    Docket Numbers: ER07-1294-000.
    Applicants: PJM Interconnection, LLC.
    Description: PJM Interconnection, LLC submits amendments to 
Schedule 12 of the Amended and Restated Operating Agreement.
    Filed Date: 08/17/2007.
    Accession Number: 20070821-0023.
    Comment Date: 5 p.m. Eastern Time on Friday, September 07, 2007.

    Docket Numbers: ER07-1295-000.
    Applicants: Centennial Power, LLC.
    Description: Centennial Power, LLC submits a notice of cancellation 
of their FERC Electric Tariff, Original Volume 1.
    Filed Date: 08/20/2007.
    Accession Number: 20070821-0021.
    Comment Date: 5 p.m. Eastern Time on Monday, September 10, 2007.

    Docket Numbers: ER07-1297-000.
    Applicants: Chien Energy, LLC.
    Description: Chien Energy, LLC submits a petition for acceptance of 
initial tariff, waivers and blanket authority re their FERC Electric 
Rate Schedule 1.
    Filed Date: 08/21/2007.
    Accession Number: 20070822-0034.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007.

    Docket Numbers: ER07-1298-000.
    Applicants: Wabash Valley Power Association, Inc.
    Description: Wabash Valley Power Association, Inc submits the 
Wholesale Power Supply Contract with Boone REMC designated as Rate 
Schedule 33.
    Filed Date: 08/22/2007.
    Accession Number: 20070823-0018.
    Comment Date: 5 p.m. Eastern Time on Wednesday, September 12, 2007.

    Take notice that the Commission received the following open access 
transmission tariff filings:

[[Page 50356]]

    Docket Numbers: OA07-3-001.
    Applicants: Tampa Electric Company.
    Description: Tampa Electric Company submits First Revised Sheet 81 
et al. to FERC Electric Tariff, Third Revised Volume 4, to be effective 
8/1/07.
    Filed Date: 08/21/2007.
    Accession Number: 20070823-0028.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis Sr.,
Acting Deputy Secretary.
[FR Doc. E7-17302 Filed 8-30-07; 8:45 am]
BILLING CODE 6717-01-P