Free Flow Power Corporation, FFP Project 7, LLC; Notice of Competing Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 50364-50365 [E7-17254]

Download as PDF sroberts on PROD1PC70 with NOTICES 50364 Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlinesupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item e above. j. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30 and 4.36. k. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30 and 4.36. l. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. m. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 of a development application to construct and operate the project. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E7–17253 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12814–000, Project No. 12851– 000] Free Flow Power Corporation, FFP Project 7, LLC; Notice of Competing Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests August 23, 2007. Take notice that the following hydroelectric applications have been filed with the Commission and are available for public inspection: a. Type of Applications: Preliminary Permit (Competing). b. Applicants, Project Numbers, and Dates Filed: Free Flow Power Corporation filed the application for Project No. 12814–000 on July 23, 2007. FFP Project 7, LLC filed the application for Project No.12851–000 on July 25, 2007. c. Name of the project is Gouldsboro Bend Project. The project would be located on the Mississippi River in Orleans and Jefferson Parish, Louisiana. The project uses no dam or impoundment. d. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a—825r. e. Applicants Contacts: For the Free Flow Power Corporation: Mr. Dan Irvin, Free Flow Power Corporation, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FFP Project 7, LLC: Mr. Dan Irvin, FFP Project 7, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536 f. FERC Contact: Robert Bell, (202) 502–6062. g. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P–12814–000 or P– 12851–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on E:\FR\FM\31AUN1.SGM 31AUN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. h. Description of Projects: The project proposed by Free Flow Power Corporation would consist of: (1) 1,000 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 20 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The Free Flow Power Corporation, project would have an average annual generation of 87.6 gigawatt-hours and be sold to a local utility. The project proposed by FFP Project 7, LLC would consist of: (1) 1,000 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 20 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Project 7, LLC, project would have an average annual generation of 87.6 gigawatt-hours and be sold to a local utility. i. The filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or e-mail FERCOnlinesupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item e above. j. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. k. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. l. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. m. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 50365 Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E7–17254 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 459–187] Union Electric Company dba Ameren EU; Notice of Amendment of License and Soliciting Comments, Motions To Intervene, and Protests August 23, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 459–187. c. Date filed: August 14, 2007. d. Applicant: Ameren UE. e. Name of Project: Osage Project. f. Location: The project is located on the Osage River, in Benton, Camden, Miller, and Morgan Counties, Missouri. The project is located immediately downstream from the U.S. Army Corps of Engineers’ (Corps) Harry S. Truman Dam and occupies 1.6 acres of inundated federal lands administered by the Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r) and sections 799 and 801. h. Applicant Contact: Mr. Jeff Green, Supervisor, P.O. Box 993, Lake Ozark, MO 65049 phone number (573) 365– 9214 or e-mail—WGreen@ameren.com i. FERC Contact: Rebecca Martin at 202–502–6012, or e-mail Rebecca.martin@ferc.gov E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 72, Number 169 (Friday, August 31, 2007)]
[Notices]
[Pages 50364-50365]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17254]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12814-000, Project No. 12851-000]


Free Flow Power Corporation, FFP Project 7, LLC; Notice of 
Competing Applications Accepted for Filing and Soliciting Comments, 
Motions To Intervene, and Protests

August 23, 2007.
    Take notice that the following hydroelectric applications have been 
filed with the Commission and are available for public inspection:
    a. Type of Applications: Preliminary Permit (Competing).
    b. Applicants, Project Numbers, and Dates Filed:
    Free Flow Power Corporation filed the application for Project No. 
12814-000 on July 23, 2007.
    FFP Project 7, LLC filed the application for Project No.12851-000 
on July 25, 2007.
    c. Name of the project is Gouldsboro Bend Project. The project 
would be located on the Mississippi River in Orleans and Jefferson 
Parish, Louisiana. The project uses no dam or impoundment.
    d. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
    e. Applicants Contacts: For the Free Flow Power Corporation: Mr. 
Dan Irvin, Free Flow Power Corporation, 69 Bridge Street, Manchester, 
MA 01944, phone (978) 232-3536. FFP Project 7, LLC: Mr. Dan Irvin, FFP 
Project 7, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 
232-3536
    f. FERC Contact: Robert Bell, (202) 502-6062.
    g. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. Comments, protests, and interventions may be 
filed electronically via the Internet in lieu of paper; see 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings. Please include the project number (P-12814-000 or 
P-12851-000) on any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on

[[Page 50365]]

each person in the official service list for the project. Further, if 
an intervenor files comments or documents with the Commission relating 
to the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    h. Description of Projects: The project proposed by Free Flow Power 
Corporation would consist of: (1) 1,000 proposed 20 kilowatt Free Flow 
generating units having a total installed capacity of 20 megawatts, (2) 
a proposed transmission line, and (3) appurtenant facilities. The Free 
Flow Power Corporation, project would have an average annual generation 
of 87.6 gigawatt-hours and be sold to a local utility.
    The project proposed by FFP Project 7, LLC would consist of: (1) 
1,000 proposed 20 kilowatt Free Flow generating units having a total 
installed capacity of 20 megawatts, (2) a proposed transmission line, 
and (3) appurtenant facilities. The FFP Project 7, LLC, project would 
have an average annual generation of 87.6 gigawatt-hours and be sold to 
a local utility.
    i. The filings are available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, call toll-free 1-866-208-3676 or 
e-mail FERCOnlinesupport@ferc.gov. For TTY, call (202) 502-8659. A copy 
is also available for inspection and reproduction at the address in 
item e above.
    j. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    k. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    l. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    m. Proposed Scope of Studies Under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
385.211, 385.214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the 
Project Number of the particular application to which the filing 
refers. Any of the above-named documents must be filed by providing the 
original and the number of copies provided by the Commission's 
regulations to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, NE., Washington, DC 20426. An additional copy must be 
sent to Director, Division of Hydropower Administration and Compliance, 
Federal Energy Regulatory Commission, at the above-mentioned address. A 
copy of any notice of intent, competing application or motion to 
intervene must also be served upon each representative of the Applicant 
specified in the particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-17254 Filed 8-30-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.