Free Flow Power Corporation; FFP Project 22 LLC; Notice of Competing Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 50363-50364 [E7-17253]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Proposal: Alabama
Power Company is requesting
Commission approval to permit DEP
Land Company, LLC to use project lands
to install additional facilities associated
with its Cove Restaurant. Specifically,
DEP Land Company, LLC would like to
construct a floating dock structure to
accommodate eight boats and tenpersonal watercraft. The proposed
facilities will be for use by customers of
the restaurant. Alabama Power
Company is also requesting that the
Commission authorize it to permit
existing residential facilities, that are
within the project boundary, for
commercial use. Existing facilities
include a concrete block seawall and a
timber bulkhead seawall for shoreline
protection, a stationary wooden pier, a
floating wooden platform, and an
asphalt and concrete boat ramp that are
currently permitted for individual, noncommercial use.
l. Location of the Applications: This
filing is available for review at the
Commission or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number (P–349)
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
VerDate Aug<31>2005
00:43 Aug 31, 2007
Jkt 211001
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17247 Filed 8–30–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12813–000; Project No. 12860–
000]
Free Flow Power Corporation; FFP
Project 22 LLC; Notice of Competing
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
August 23, 2007.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Applications: Preliminary
Permit (Competing).
b. Applicants, Project Numbers, and
Dates Filed:
Free Flow Power Corporation filed the
application for Project No. 12813–000
on July 23, 2007.
FFP Project 22, LLC filed the
application for Project No. 12860–000
on July 25, 2007.
c. Name of the project is Gouldsboro
Bend Project. The project would be
located on the Mississippi River in
Orleans and Jefferson Parish, Louisiana.
The project uses no dam or
impoundment.
d. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
50363
e. Applicants Contacts: For the Free
Flow Power Corporation: Mr. Dan Irvin,
Free Flow Power Corporation, 69 Bridge
Street, Manchester, MA 01944, phone
(978) 232–3536. FFP Project 22 LLC: Mr.
Dan Irvin, FFP Project 22, LLC, 69
Bridge Street, Manchester, MA 01944,
phone (978) 232–3536.
f. FERC Contact: Robert Bell, (202)
502–6062.
g. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–12813–000 or P–
12860–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
h. Description of Projects: The project
proposed by Free Flow Power
Corporation would consist of: (1) 2,650
proposed 20 kilowatt Free Flow
generating units having a total installed
capacity of 53 megawatts, (2) a proposed
transmission line, and (3) appurtenant
facilities. The Free Flow Power
Corporation project would have an
average annual generation of 232.14
gigawatt-hours and be sold to a local
utility.
The project proposed by FFP Project
22, LLC would consist of: (1) 2,650
proposed 20 kilowatt Free Flow
generating units having a total installed
capacity of 53 megawatts, (2) a proposed
transmission line, and (3) appurtenant
facilities. The FFP Project 22, LLC
project would have an average annual
generation of 232.14 gigawatt-hours and
be sold to a local utility.
i. The filings are available for review
at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
E:\FR\FM\31AUN1.SGM
31AUN1
sroberts on PROD1PC70 with NOTICES
50364
Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlinesupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item e
above.
j. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
k. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
l. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
m. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
VerDate Aug<31>2005
00:43 Aug 31, 2007
Jkt 211001
of a development application to
construct and operate the project.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower
Administration and Compliance,
Federal Energy Regulatory Commission,
at the above-mentioned address. A copy
of any notice of intent, competing
application or motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–17253 Filed 8–30–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12814–000, Project No. 12851–
000]
Free Flow Power Corporation, FFP
Project 7, LLC; Notice of Competing
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
August 23, 2007.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Applications: Preliminary
Permit (Competing).
b. Applicants, Project Numbers, and
Dates Filed:
Free Flow Power Corporation filed the
application for Project No. 12814–000
on July 23, 2007.
FFP Project 7, LLC filed the
application for Project No.12851–000 on
July 25, 2007.
c. Name of the project is Gouldsboro
Bend Project. The project would be
located on the Mississippi River in
Orleans and Jefferson Parish, Louisiana.
The project uses no dam or
impoundment.
d. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
e. Applicants Contacts: For the Free
Flow Power Corporation: Mr. Dan Irvin,
Free Flow Power Corporation, 69 Bridge
Street, Manchester, MA 01944, phone
(978) 232–3536. FFP Project 7, LLC: Mr.
Dan Irvin, FFP Project 7, LLC, 69 Bridge
Street, Manchester, MA 01944, phone
(978) 232–3536
f. FERC Contact: Robert Bell, (202)
502–6062.
g. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–12814–000 or P–
12851–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
E:\FR\FM\31AUN1.SGM
31AUN1
Agencies
[Federal Register Volume 72, Number 169 (Friday, August 31, 2007)]
[Notices]
[Pages 50363-50364]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17253]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12813-000; Project No. 12860-000]
Free Flow Power Corporation; FFP Project 22 LLC; Notice of
Competing Applications Accepted for Filing and Soliciting Comments,
Motions To Intervene, and Protests
August 23, 2007.
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection:
a. Type of Applications: Preliminary Permit (Competing).
b. Applicants, Project Numbers, and Dates Filed:
Free Flow Power Corporation filed the application for Project No.
12813-000 on July 23, 2007.
FFP Project 22, LLC filed the application for Project No. 12860-000
on July 25, 2007.
c. Name of the project is Gouldsboro Bend Project. The project
would be located on the Mississippi River in Orleans and Jefferson
Parish, Louisiana. The project uses no dam or impoundment.
d. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
e. Applicants Contacts: For the Free Flow Power Corporation: Mr.
Dan Irvin, Free Flow Power Corporation, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232-3536. FFP Project 22 LLC: Mr. Dan Irvin, FFP
Project 22, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978)
232-3536.
f. FERC Contact: Robert Bell, (202) 502-6062.
g. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and interventions may be
filed electronically via the Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings. Please include the project number (P-12813-000 or
P-12860-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
h. Description of Projects: The project proposed by Free Flow Power
Corporation would consist of: (1) 2,650 proposed 20 kilowatt Free Flow
generating units having a total installed capacity of 53 megawatts, (2)
a proposed transmission line, and (3) appurtenant facilities. The Free
Flow Power Corporation project would have an average annual generation
of 232.14 gigawatt-hours and be sold to a local utility.
The project proposed by FFP Project 22, LLC would consist of: (1)
2,650 proposed 20 kilowatt Free Flow generating units having a total
installed capacity of 53 megawatts, (2) a proposed transmission line,
and (3) appurtenant facilities. The FFP Project 22, LLC project would
have an average annual generation of 232.14 gigawatt-hours and be sold
to a local utility.
i. The filings are available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the
[[Page 50364]]
last three digits in the docket number field to access the document.
For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlinesupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item e
above.
j. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
k. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
l. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
m. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower
Administration and Compliance, Federal Energy Regulatory
Commission, at the above-mentioned address. A copy of any notice of
intent, competing application or motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-17253 Filed 8-30-07; 8:45 am]