Virginia Electric & Power Company; Notice of Availability of Environmental Assessment, 50356 [E7-17252]

Download as PDF 50356 Federal Register / Vol. 72, No. 169 / Friday, August 31, 2007 / Notices sroberts on PROD1PC70 with NOTICES Docket Numbers: OA07–3–001. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits First Revised Sheet 81 et al. to FERC Electric Tariff, Third Revised Volume 4, to be effective 8/1/07. Filed Date: 08/21/2007. Accession Number: 20070823–0028. Comment Date: 5 p.m. Eastern Time on Tuesday, September 11, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or VerDate Aug<31>2005 00:43 Aug 31, 2007 Jkt 211001 call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. information, contact Kristen Murphy at (202) 502–6236. Nathaniel J. Davis Sr., Acting Deputy Secretary. [FR Doc. E7–17302 Filed 8–30–07; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E7–17252 Filed 8–30–07; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. PF07–10–000] [Project No. 906–006] Virginia Electric & Power Company; Notice of Availability of Environmental Assessment August 23, 2007. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a new license for the Cushaw Hydroelectric Project, located on the James River, near the Town of Glasgow, Virginia, and has prepared an Environmental Assessment (EA). In the EA, Commission staff, analyze potential environmental effects of relicensing the project and conclude that issuing a new license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Cushaw Project No. 906– 006’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 LNG Development Company, LLC and Oregon Pipeline Company; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Oregon LNG Terminal and Pipeline Project, Request for Comments on Environmental Issues and Notice of Public Meetings August 24, 2007. The Federal Energy Regulatory Commission (FERC or Commission) and the U.S. Department of Homeland Security, U.S. Coast Guard (Coast Guard) are in the process of evaluating the Oregon LNG Terminal and Pipeline Project involving the construction and operation of facilities proposed by LNG Development Company, LLC and Oregon Pipeline Company (collectively referred to as Oregon LNG). The facilities would be located in northern Oregon and consist of a liquefied natural gas (LNG) import terminal in Warrenton, Oregon, and an associated 117-mile-long natural gas pipeline from the LNG import terminal southeastward across Clatsop, Washington, Yamhill, Marion, and Clackamas Counties, Oregon, to an interconnection with the existing Williams Northwest Pipeline system near Molalla, Oregon. As a part of this evaluation, FERC staff will prepare an environmental impact statement (EIS) that will address the environmental impacts of the project and the Coast Guard will assess the safety and security of the project. As described below, the FERC and the Coast Guard will hold a joint public meeting to allow the public to provide input to these assessments. The Commission will use the EIS in its decision-making process to determine whether or not to authorize the project. This Notice of Intent (NOI) explains the scoping process we 1 will use to gather information on the project from the public and interested agencies and summarizes the process that the Coast Guard will use. Your input will 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the FERC’s Office of Emergy Projects. E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 72, Number 169 (Friday, August 31, 2007)]
[Notices]
[Page 50356]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-17252]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 906-006]


Virginia Electric & Power Company; Notice of Availability of 
Environmental Assessment

August 23, 2007.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office 
of Energy Projects has reviewed the application for a new license for 
the Cushaw Hydroelectric Project, located on the James River, near the 
Town of Glasgow, Virginia, and has prepared an Environmental Assessment 
(EA). In the EA, Commission staff, analyze potential environmental 
effects of relicensing the project and conclude that issuing a new 
license for the project, with appropriate environmental measures, would 
not constitute a major federal action significantly affecting the 
quality of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at  https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659.
    Any comments should be filed within 30 days from the issuance date 
of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Cushaw Project No. 906-006'' to 
all comments. Comments may be filed electronically via Internet in lieu 
of paper. The Commission strongly encourages electronic filings. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site under the ``eFiling'' link. For further information, contact 
Kristen Murphy at (202) 502-6236.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-17252 Filed 8-30-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.